Excavation Subpart P .650-652 App A&B

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/28

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 2:02 PM on 8/26/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

29 Terms

1
New cards

Type A

Cohesive 1.5 tsf or more

Clay, silty clay, clay loam

Caliche & hard pan

NOT PREVIOUSLY DISTRIBUTED

2
New cards

Type B

Cohesive more than .5 up to 1.5 tsf

Angular gravel, silt, silty loam, sandy loam

INCLUDES PREVIOUSLY DISTURBED SOIL & type A IF DISTURBED

3
New cards

Type C

Cohesive .5 or less

Gravel, sand, loamy sand, submerged soil, freely seeping water

4
New cards

Sand is type

C

5
New cards

Strength order

A,B,C

6
New cards

Breaking Points

1.5 & .5 tons sq/ft

7
New cards

Who makes clarification

Competent person

8
New cards

Stable rock

Max slope?

Angle?

Vertical

90°

9
New cards

Type A

Max slope?

Angle?

3/4:1

53°

10
New cards

Type B

Max slope?

Angle?

1:1

45°

11
New cards

Type C

1 1/2 : 1

34°

12
New cards

Two Slope Exceptions found?

Below table-b1 pg 345

13
New cards

Deeper than 20ft

Any sloping must be designed by engineer

14
New cards

2ft rule

Spoil piles, materials, equipment stay MIN 2 ft from edge or use retaining device

15
New cards

4ft rule

Trenches 4ft or deeper need way out; stairs, ladder every 25ft in both directions

16
New cards

4ft rule (test)

If hazardous atmosphere exists test before entry when deeper than 4ft of oxygen floor 19.5%

17
New cards

5ft rule

Protective system required at 5ft unless stable rock or no cave in

18
New cards

Daily rule

Competent person inspects excavation site daily before shift after rain storm

19
New cards

Surface Embracements

Removed or supported as necessary to protect employees

20
New cards

Adjacent Structures

Shoring bracing or underpinning where stability is endangered

21
New cards

Inside box 2ft max

Digging below bottom of a support & only if protected by .652 e2 & g2

22
New cards

Inside box 18 in

Min support height above top of the vertical side of type C vertical sides lower portion

23
New cards

Kick out

Accidentally release or failure of a cross brace

24
New cards

Locate utilities when

Before you dig

25
New cards
26
New cards
27
New cards
28
New cards
29
New cards