Environmental Science and Engineering: EMS, EIA, and ECC

0.0(0)
Studied by 1 person
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/51

flashcard set

Earn XP

Description and Tags

Vocabulary flashcards covering Environmental Management Systems (EMS), Environmental Impact Assessment (EIA), and Environmental Compliance Certificates (ECC) based on Environmental Science and Engineering lecture notes.

52 Terms

1
New cards

Environmental Management

The process of considering the environmental effects of human activities while balancing development, human needs, and environmental protection.

2
New cards

Environmental Management System (EMS)

A structured approach to managing environmental responsibilities that identifies and assesses environmental impacts, incorporates environmental factors in planning and decision-making, includes monitoring and adaptation, and supports sustainable development.

3
New cards

PDCA Cycle

The core iterative management philosophy of an EMS consisting of four stages: Plan (identifying environmental concerns, impacts, objectives, and alternatives), Do (implementing planned actions), Check (monitoring and evaluating results), and Act (improving and adapting based on results).

4
New cards

U.S. NEPA (1970)

A landmark United States environmental law that established a foundational framework for considering environmental impacts in federal decision-making.

5
New cards

BS 7750

A British standard established in 1992 that became an early formal environmental management system standard in the United Kingdom.

6
New cards

ISO/TC 207

A technical committee established by the International Organization for Standardization (ISO) in 1992 dedicated to developing environmental management standards.

7
New cards

ISO 14001

An internationally recognized standard developed by the International Organization for Standardization (ISO) that provides requirements, guidance, and a standardized framework for creating, certifying, and continually improving an EMS.

8
New cards

ISO 14001:2015

A widely implemented EMS standard that establishes requirements structured across Clauses 4 through 10, accounting for 676,232676,232 certificates covering more than 1.17 million1.17\text{ million} sites worldwide in the 2024 ISO Survey.

9
New cards

ISO 14001:2026

The updated international EMS standard released on April 15, 2026.

10
New cards

EMS Framework

A structured approach that guides an organization in managing its environmental responsibilities by identifying, managing, reducing, and monitoring environmental impacts.

11
New cards

Eco-Management and Audit Scheme (EMAS)

A rigorous, legally supported environmental management and audit framework developed by the European Union that emphasizes performance, transparency, public environmental statements, and validation by an independent environmental verifier.

12
New cards

Customized Environmental Management System

An EMS tailored specifically by an individual organization to fit its own activities, environmental risks, resources, and goals without adhering to a fixed external international standard.

13
New cards

Maintained Documented Information

Information kept current and readily available within an EMS to describe procedures, operational instructions, policies, objectives, and scope (specifying 'how' processes work).

14
New cards

Retained Documented Information

Records and evidence preserved within an EMS to prove that activities were performed or requirements were met, such as audit results, training records, inspection records, and monitoring data (providing 'proof').

15
New cards

Environmental Aspect

An element of an organization’s activities, products, or services that can interact with the environment.

16
New cards

Environmental Impact

Any change to the environment, whether adverse or beneficial, wholly or partially resulting from an organization's environmental aspects.

17
New cards

Legal Compliance Register

A centralized compilation used by an organization to identify, track, and adhere to environmental laws, regulations, permits, licenses, and applicable regulatory requirements.

18
New cards

Environmental Hazard Control

The systematic process of identifying, assessing, and mitigating operational activities that threaten ecosystems, human health, or regulatory compliance.

19
New cards

Resource Efficiency

The strategic optimization of raw material, energy, and water inputs to maximize output while minimizing resource consumption rates.

20
New cards

Waste Reduction

The practice of minimizing trash, scrap materials, and toxic byproducts directly at the source of production through recycling, reuse, or redesign.

21
New cards

Social Responsibility

The ethical framework suggesting that an organization has an obligation to act for the benefit of society at large and minimize its negative impacts on the local and global environment.

22
New cards

Stakeholder Trust

The level of confidence, credibility, and reliability an organization earns from key interested parties—such as investors, clients, employees, and regulators—regarding its commitment to ethical and sustainable practices.

23
New cards

Environmental Impact Assessment (EIA)

A systematic, anticipatory decision-making tool used to identify, predict, and evaluate the environmental, social, and economic consequences of a proposed project before major decisions or commitments are made.

24
New cards

Screening (EIA Phase 1)

The initial EIA stage that determines whether a proposed project requires an Environmental Impact Assessment and identifies the required level of assessment based on project size, type, location, and potential risk.

25
New cards

Scoping (EIA Phase 2)

The stage of the EIA process that defines study boundaries, determines which potential environmental issues and alternatives matter most, and identifies affected areas and communities.

26
New cards

Baseline Data Collection (EIA Phase 3)

The phase of gathering information on the existing condition of the physical, biological, and socio-economic environment (air, water, soil, biodiversity, and human communities) prior to project implementation.

27
New cards

Matrices (EIA Method)

An impact prediction method that uses two-dimensional grid tables to directly compare specific project activities with various environmental parameters.

28
New cards

Networks (EIA Method)

An impact prediction method that illustrates chains of cause-and-effect relationships resulting from project actions (e.g., deforestation leading to habitat loss, decreased wildlife, and reduced biodiversity).

29
New cards

Overlays (EIA Method)

An impact prediction method in which multiple thematic environmental maps (such as land use, wildlife habitat, and water resources) are superimposed to identify environmentally sensitive areas.

30
New cards

Environmental Management Plan (EMP)

A comprehensive, step-by-step action plan formulated during Phase 5 of an EIA that details technical mitigation strategies to prevent, reduce, or compensate for adverse environmental damage.

31
New cards

Project-Level EIA

The most common category of EIA, focusing specifically on an individual development project (such as a bridge, mine, or factory) and its immediate localized environmental impacts.

32
New cards

Regional EIA

An assessment that evaluates the cumulative environmental impacts of multiple development projects located within a defined geographic region, such as a river basin or coastal zone.

33
New cards

Sectoral EIA

An EIA that examines the cumulative environmental consequences of an entire economic sector or industry across a nation or region (such as a nationwide expansion of offshore wind power).

34
New cards

Strategic Environmental Assessment (SEA)

A high-level strategic EIA conducted for overarching policies, plans, and government programs before individual development projects are designed.

35
New cards

Rapid (or Preliminary) EIA

A quick assessment conducted during the early scoping phase to diagnose major potential impacts and determine whether a full-scale, comprehensive EIA is necessary.

36
New cards

Lifecycle EIA

A comprehensive impact evaluation that analyzes project impacts across its entire lifespan, extending from design and construction through operations, decommissioning, and site closure.

37
New cards

Social Impact Assessment (SIA)

A specialized analytical sub-type of impact assessment dedicated to evaluating how a project affects human communities, local cultures, livelihoods, and public health.

38
New cards

Transboundary EIA

An assessment performed when activities within one nation are projected to cause environmental consequences across national borders into another country.

39
New cards

Cumulative Impact Assessment (CIA)

A systematic assessment process used to evaluate the total combined environmental and social effects of multiple human activities and projects accumulating over time.

40
New cards

Presidential Decree No. 1586

The foundational Philippine law established on June 11, 1978, which established the Philippine Environmental Impact Statement System (PEISS) under the oversight of the DENR-EMB.

41
New cards

Environmental Compliance Certificate (ECC)

An official regulatory document issued by the DENR-EMB certifying that a proposed project has fulfilled the EIA review requirements and is deemed safe to implement under specific conditional rules.

42
New cards

Certificate of Non-Coverage (CNC)

A formal certification issued by the EMB verifying that a Category D project falls outside the scope of the Philippine EIS System due to negligible environmental impact and does not require an ECC.

43
New cards

Environmentally Critical Projects (ECPs)

Category A projects possessing high potential for significant environmental impact due to their nature, scale, or activities, including heavy industries, major resource extraction, and large infrastructure projects.

44
New cards

Environmentally Critical Areas (ECAs)

Geographic locations classified as environmentally fragile, sensitive, or ecologically important, wherein non-critical projects (Category B) must still secure an ECC.

45
New cards

Environmental Impact Statement (EIS)

A comprehensive, multi-component document based on multi-week scientific field studies, modeling, and baseline assessments required for Category A (ECP) project clearance.

46
New cards

Initial Environmental Examination (IEE) Checklist

A standardized questionnaire and checklist format required for Category B projects to accelerate review and capture project descriptions, pollution controls, and sworn accountability statements.

47
New cards

Order of Payment (OP)

A document generated by the EMB online portal after submitted application files are verified as sufficient, indicating the required processing fees to be paid through authorized channels.

48
New cards

Environmental Guarantee Fund (EGF)

A dedicated trust fund required as a post-issuance condition under an ECC to finance immediate environmental cleanup, community compensation, and ecosystem rehabilitation following accidental spills or damage.

49
New cards

Environmental Monitoring Fund (EMF)

A post-issuance trust fund established to cover ongoing inspection expenses, field auditor travel and meals, laboratory sampling, and monitoring equipment purchases.

50
New cards

Self-Monitoring Report (SMR)

A quarterly compliance report submitted online by a project proponent every 3 months3\text{ months} documenting waste generation, air emissions, and wastewater test metrics.

51
New cards

Multi-Partite Monitoring Team (MMT)

An independent watchdog team comprising DENR officers, Local Government Unit (LGU) officials, NGOs, and community representatives that conducts physical compliance audits of project operations.

52
New cards

Cease & Desist Order (CDO)

A Level 2 regulatory enforcement sanction mandating the immediate stoppage of facility operations whenever environmental harm or severe non-compliance is detected.