Comprehensive practice flashcards covering ladder operations, forcible entry, ventilation methods, trench cuts, roof safety, photovoltaic hazards, overhaul, and dust explosion dangers based on fire service instructional material.

40 Terms

1
New cards
<p>According to Figure 4-14, what are the five basic ladder placements depicted for structural fireground operations?</p>

According to Figure 4-14, what are the five basic ladder placements depicted for structural fireground operations?

The five basic placements are: Access to Roof, Rescue, Play Waterline in Window, Access to Floor (Building), and To Ventilate.

2
New cards

Where should the top of a ladder be positioned when placed for rescue from a window, and why?

The top of the ladder must be even with the windowsill or slightly below it; a ladder protruding into the window opening will impede the removal of occupants.

3
New cards

What is the proper positioning of a ladder placed for a firefighter to enter a window?

It can be placed alongside the window and about three rungs above the windowsill, or protruding into the window opening if the window is wide enough.

4
New cards

How far must a ladder extend above the roofline when placed for roof access?

It should extend at least three rungs above the roof to allow safe mounting and dismounting and to help firefighters on the roof locate the ladder.

5
New cards

Where should a ladder be placed to play a hose stream into a window, and where does the firefighter stand?

The head of the ladder should rest on the wall above the opening, and the firefighter should be positioned slightly below the center of the window.

6
New cards

Where should a ladder be positioned when performing window ventilation?

It should be placed on the windward side of the opening, slightly above the top of the window.

7
New cards

What is the proper climbing angle for a portable ladder, and how is the base distance determined?

The desired angle is 75∘75^\circ, which is achieved by placing the heel or base of the ladder one-fourth of the height distance from where the ladder rests against the building.

8
New cards

What occurs when the base of a portable ladder is placed too close to or too far from a building?

If set too close, the top pulls away from the building as the climber nears the top; if set too far, the base tends to creep or walk away from the building.

9
New cards

What are the three acceptable configurations to ensure at least two independent means of egress for firefighters operating on a roof?

(1) Two ladders raised by the fire department; (2) A combination of a raised ladder and a fire escape or fire tower; (3) A raised ladder and the roof of an adjoining building.

10
New cards

In the on-scene account regarding electrical wire hazards, what distance did electricity jump to energize a metal ladder?

Electricity jumped a span of about 4 feet4\,\text{feet} from overhead wires on a drizzly night as firefighters brought the ladder to an upright position.

11
New cards

What is the first rule of forcible entry?

The first rule is to try to open the door before forcing it.

12
New cards

How can a firefighter determine which direction a door swings by examining its hinges?

If the hinges are visible, the door opens toward the firefighter; if the hinges are not visible, the door opens away from the firefighter.

13
New cards

Why should outward-opening interior doors generally not be forced during the initial search and rescue phase?

They usually lead to closets in dwellings or service/utility closets in commercial buildings, making forcing them a waste of time and effort unless fire is suspected behind them.

14
New cards
<p>What fire behavior concept is depicted in this diagram, and what causes it?</p>

What fire behavior concept is depicted in this diagram, and what causes it?

The mushroom effect; it occurs when heat and smoke reach the highest level within a fire area or building and start banking downward due to a lack of ventilation.

15
New cards

How does air and smoke move through a door opening within a ventilation flow path?

Fresh air enters from the bottom half of the door opening toward the seat of the fire, while products of combustion vent out through the top half of the door opening.

16
New cards

What technique should a firefighter use when breaking a window with a hand tool to prevent injury from falling glass?

Position on the windward side, break the top panel first then lower panels, and strike downward with the tool so broken glass does not slide down the handle.

17
New cards

What should firefighters on the exterior do immediately upon hearing the sound of breaking glass above them?

They should slope their shoulders downward so falling glass falls away from their body, avoid looking toward the sound, and move away if not part of the ventilation operation.

18
New cards

What is the 'up and over' method of window ventilation?

A technique on multistoried flat-roof structures where one firefighter on the roof uses a tool to reach over the edge and break multiple windows from above.

19
New cards

Why must the boxed-off areas around skylights be opened during roof operations?

Skylights only vent living spaces; to vent or check the cockloft or attic for fire extension, the boxed-off areas surrounding the skylight must be opened.

20
New cards

What are the standard dimensions for vertical ventilation holes on small and large roofs?

A ventilation hole should be 4 ft×4 ft4\,\text{ft} \times 4\,\text{ft} on a small roof and at least 8 ft×12 ft8\,\text{ft} \times 12\,\text{ft} on a large roof.

21
New cards

Why should roof ventilation cuts end at the roof rafters?

Rafters serve as a guide for straight cuts and maintain structural stability for firefighters operating around the opening.

22
New cards

What is the primary electrical hazard associated with rooftop photovoltaic (PV) solar panels?

PV systems are always energized during daylight and cannot be shut off, presenting a constant electric shock hazard in the modules, conduit, and related components.

23
New cards

What took place during the September 2013 commercial warehouse fire in Burlington, New Jersey?

A 300,000-square-foot300{,}000\text{-square-foot} warehouse containing 7,0007{,}000 rooftop solar panels caught fire; due to solar panel hazards, the fire chief prohibited rooftop operations, resulting in the building being totally destroyed.

24
New cards

How is hydraulic ventilation performed?

A hose-line nozzle is set to a fog pattern covering about 90%90\% of a window or door opening while the firefighter stays low and directs the stream outside to draw smoke out.

25
New cards

What airflow capacity is required for fans used in positive pressure ventilation (PPV)?

Fans must have an airflow capacity in excess of 10,000 ft3/min10{,}000\,\text{ft}^3/\text{min} and often range up to 20,000 ft3/min20{,}000\,\text{ft}^3/\text{min}.

26
New cards
<p>According to Figure 4-29, what preparatory cuts are made on a roof before a trench cut is cut and opened?</p>

According to Figure 4-29, what preparatory cuts are made on a roof before a trench cut is cut and opened?

An initial ventilation hole of sufficient size is placed directly over the fire area, and observation holes (triangular cuts or kerf cuts) are placed in the expected path of fire travel.

27
New cards

What is the number one rule when considering a trench cut?

A trench cut should not be attempted until an initial ventilation hole of sufficient size is placed directly above the fire area.

28
New cards

What are the dimensions and spacing requirements for cutting a trench cut?

The trench consists of two parallel cuts 30 to 36 inches30\text{ to }36\,\text{inches} apart along its entire length, with perpendicular cuts placed approximately every 3 feet3\,\text{feet} (36 inches36\,\text{inches}).

29
New cards

At what operational trigger should a trench cut be ordered opened?

The order to open the trench is given once fire is showing through the observation openings.

30
New cards
<p>What ideal air movement is illustrated in Figure 4-30 during a trench cut operation?</p>

What ideal air movement is illustrated in Figure 4-30 during a trench cut operation?

Air vents from the ceiling opening below the trench into the cockloft and then flows upward and out through the initial ventilation opening, deterring fire spread toward the trench.

31
New cards

Why must a hose stream never be directed into a vertical roof ventilation opening?

Directing a stream into the opening defeats the purpose of the vent hole and drives the heat and fire downward, endangering interior crews.

32
New cards

What fall hazard is associated with elevated cornices or high parapet walls during roof operations?

The actual surface of the roof can be up to 8 feet8\,\text{feet} below the top of the cornice, posing a severe fall hazard if a firefighter steps off without sounding with a tool.

33
New cards

What are the two primary causes of rekindled fires?

Incendiary fires and careless firefighting.

34
New cards
<p>What concealed space overhaul discovery is depicted in Figure 4-32?</p>

What concealed space overhaul discovery is depicted in Figure 4-32?

A suspended ceiling was opened to reveal an older decorative tin ceiling above it, which then had to be pulled open to reach hidden fire in the structural space above.

35
New cards

What are four indicators that fire has extended into concealed spaces?

(1) Discolored paint or wall coverings; (2) Smoke oozing or pushing from around baseboards or door/window moldings; (3) Continued smoke generation after visible fire is knocked down; (4) No abatement of heat conditions.

36
New cards

Why must power saws rather than axes be used to open roofs and floors in a fire-weakened building?

Saws minimize shocking jolts and jarring impacts that could destabilize the building and trigger a structural collapse.

37
New cards

Why requires extensive overhaul in a building struck by lightning?

The intense electrical heat is conducted throughout the structure via piping and electrical wiring, igniting numerous smoldering fires within inner wall and ceiling cavities.

38
New cards

What must be done with smoldering mattresses and overstuffed furniture during overhaul?

They must be completely removed to the exterior of the building, pulled apart at all burned areas, and thoroughly soaked with water.

39
New cards

In what order should standing water be removed from a multistoried building to avoid floor overload?

Water removal must start on the first floor and work upward to prevent a massive cumulative buildup of water weight on the lower floors.

40
New cards

What specific casualty and explosive force data was reported for the Philadelphia grain elevator dust explosion?

The grain elevator exploded with the explosive force of 1,100 pounds1{,}100\,\text{pounds} of dynamite, killing 3 people and injuring 86 others.