Comprehensive fill-in-the-blank review flashcards covering Chapter 5230, ASME B31.1, ASME Section I power piping requirements, and ASME B31.5 ammonia refrigeration codes.

49 Terms

1
New cards

For power piping systems operating at temperatures over 750∘F750^\circ\text{F}, __________ are recommended instead of standard bolts.

Bolt studs

2
New cards

In ASME B31.1 power piping systems, threaded joints are strictly prohibited at temperatures above __________.

925∘F925^\circ\text{F}

3
New cards

For steam service over 250 psi250\,\text{psi} or water service over 100 psi100\,\text{psi} and 220∘F220^\circ\text{F}, the pipe shall be seamless, have a minimum ultimate tensile strength of 48,000 psi48,000\,\text{psi}, and have a weight at least equal to __________.

Schedule 80

4
New cards

Brazed socket-type joints for valves and fittings must be made with suitable brazing alloys having melting points above __________.

840∘F840^\circ\text{F}

5
New cards

For all piping lines under pressure and above 250∘F250^\circ\text{F}, gaskets are recommended to be metallic, asbestos, or other __________.

nonburning material

6
New cards

Pipe type prohibited in high-pressure steam or heating media systems

Furnace butt-welded pipe (Grade F)

7
New cards

Copper pipe, copper tubing, and brass pipe may be used for power piping service provided the operating temperature does not exceed __________.

406∘F406^\circ\text{F}

8
New cards

When steam pipes pass through combustible partitions, floors, or walls, metal sleeves must provide an all-around clearance of not less than __________ under hot and cold conditions.

1/4 inch1/4\,\text{inch}

9
New cards

By definition, a slow-opening valve requires at least __________ of the operating mechanism to change from fully closed to fully opened.

five 360∘360^\circ turns

10
New cards

Outside screw and yoke (OS&Y) stem design is mandatory for threaded stem valves of size __________ and larger for pressures above 600 psi600\,\text{psi}.

NPS 3

11
New cards

Minimum pipe schedule and construction required for bypasses lines

Must be at least Schedule 80 seamless, and may be integral or attached.

12
New cards

Following erection, all power piping systems must be capable of withstanding a hydrostatic test pressure of __________ the design pressure continuously maintained for at least 10 min10\,\text{min}.

1.5 times1.5\,\text{times}

13
New cards

Piping systems are considered safe for occasional operation if pressure or temperature exceeds nominal design values by 15%15\% for no more than 8 hr8\,\text{hr} at any one time and not more than __________.

800 hr/year800\,\text{hr/year}

14
New cards

Piping systems are considered safe for occasional operation if pressure or temperature exceeds nominal design values by 20%20\% for no more than 1 hr1\,\text{hr} at any one time and not more than __________.

80 hours/ year


15
New cards

Boiler blowoff piping must be capable of withstanding the maximum allowable working pressure of the boiler by either 225 psi225\,\text{psi} or __________, whichever is less.

25%25\%

16
New cards

Required routing and bend specifications for pipe connections between a boiler and a blowoff tank

Must be made as direct as possible using sweep bends having a radius of 33 times the diameter of the pipe.

17
New cards

Component required to connect the outlet piping with the vent pipe on a boiler blowoff tank

A 34 in\frac{3}{4}\text{ in} siphon breaker

18
New cards

Boiler blowoff tank vent sizing ratio relative to the inlet or outlet size

Equal to 2.52.5 times the size of the inlet or outlet

19
New cards

Before discharging into a sanitary sewer, boiler blowoff must pass through a blowoff tank or apparatus that reduces the pressure to not more than 5 pounds5\,\text{pounds} and the temperature to not more than __________.

140∘F140^\circ\text{F}

20
New cards

Blowoff tanks must be installed with a clearance space of not less than 12 inches12\,\text{inches} between the tank and the floor, and not less than __________ between the tank and the wall.

18 inches18\,\text{inches}

21
New cards

Boilers having more than __________ of water heating surface shall be provided with at least two means of feeding water.

500 square feet500\,\text{square feet}

22
New cards

Minimum delivery pressure required for each boiler feedwater source

3%3\% higher than the highest setting of any safety valve on the boiler

23
New cards

Feedwater supply requirement for boilers fired with solid fuel not in suspension

Must be provided with at least two means of feeding water that cannot be subject to the same type of interruption (commonly accomplished by making one source steam-operated).

24
New cards

Boiler feed line valve arrangement and globe valve flow direction

The feed pipe must be equipped with a check valve and at least 11 feedwater valve (stop valve, globe valve, or plug cock) placed between the check valve and the boiler. When a globe valve is used, the water inlet must enter under the disk.

25
New cards

Feedwater piping and valves between the feed pump and the boiler must meet or exceed the MAWP of the boiler by 225 psi225\,\text{psi} or __________ the MAWP, whichever is lesser.

1.25 times1.25\,\text{times}

26
New cards

The temperature in degrees Fahrenheit of saturated steam can be approximated from gauge pressure using the formula: __________ plus 198198.

(psig)×14(\sqrt{\text{psig}}) \times 14

27
New cards

The suggested steel pipe support spacing in Table 121.5 is based on a fixed beam support with a maximum bending stress not exceeding __________.

2,300 psi2,300\,\text{psi}

28
New cards

Threaded hanger rods used for supporting pipe of nominal size 2 inch2\,\text{inch} and smaller must not be less than __________ in diameter.

3/8 inch3/8\,\text{inch}

29
New cards

The steam gage valve must be fitted with a tee or lever handle arranged to be __________ when the valve is open.

parallel to the pipe

30
New cards

Under ASME BPE standards, equipment parts subjected to Steam in Place (SIP) should withstand continuous flow of saturated steam at a minimum temperature of 266∘F266^\circ\text{F} for a minimum duration of __________ under steady-state conditions.

100 hr100\,\text{hr}

31
New cards

The Permissible Exposure Limit (worker exposure) of ammonia in refrigeration systems is __________.

50 parts per million50\,\text{parts per million}

32
New cards

At atmospheric pressure, the flammable limits of ammonia vapor by volume in air are __________.

15% to 28%15\% \text{ to } 28\%

33
New cards

In a restricted ammonia machinery room, no permanently installed flame-producing device or hot surface above __________ is permitted.

800∘F800^\circ\text{F}

34
New cards

Components in direct contact with ammonia must not contain copper, brass, zinc, __________, or alloys of these materials.

mercury

35
New cards

If an ammonia refrigeration system has any component designed for operating temperatures below __________, the piping must meet ASME B31.5 impact test requirements.

−20∘F-20^\circ\text{F}

36
New cards

For carbon steel welded ammonia piping, pipe sizes of 1 1/2 inch1\,1/2\,\text{inch} and smaller must be __________.

Schedule 80

37
New cards

In public hallways or lobbies of commercial occupancies, ammonia piping systems are restricted to containing not more than __________ of refrigerant.

3.3 pounds3.3\,\text{pounds}

38
New cards

Ammonia piping crossing an open passageway in a building must be installed at least __________ above the floor, unless positioned against the ceiling.

7.25 feet7.25\,\text{feet}

39
New cards

The storage tank capacity for anhydrous ammonia must be limited to __________ of water weight capacity at 60∘F60^\circ\text{F}.

56%56\%

40
New cards

Refrigerant piping with a surface temperature of 140∘F140^\circ\text{F} or higher that is located less than __________ high or near passageways must be insulated or guarded.

7.25 ft7.25\,\text{ft}

41
New cards

In ammonia refrigeration piping systems, all joints larger than 2 inch2\,\text{inch} NPS must be __________.

welded

42
New cards

The discharge termination of an ammonia relief valve to atmosphere must be at least 15 feet15\,\text{feet} above ground and at least __________ from any window, ventilation intake, or personnel exit.

20 feet20\,\text{feet}

43
New cards

An ammonia pressure vessel of __________ or more internal gross volume must be protected by two parallel pressure relief devices connected to a three-way type stop valve.

103 feet3103\,\text{feet}^3

44
New cards

Beyond the system charge itself, the maximum weight of refrigerant stored in an ammonia machinery room receiver must not exceed __________.

330 pounds330\,\text{pounds}

45
New cards

Ammonia compressors driven by motors exceeding __________ must be equipped with antirecycle timers to prevent short cycling and overheating.

250 horsepower250\,\text{horsepower}

46
New cards

On an ammonia pipe marker conforming to ANSI A13.1 guidelines, the physical state section is printed in sky blue for vapor and in __________ for liquid.

yellow

47
New cards

On an ammonia pipe marker, an operating pressure exceeding __________ is classified as high pressure and printed in black letters on a red band.

70 psig70\,\text{psig}

48
New cards

Quarter-turn valves may be utilized in ammonia refrigeration service provided they feature an actuator with a minimum operating stroke duration of __________.

60 seconds60\,\text{seconds}

49
New cards

Emergency mechanical ventilation systems in an ammonia machinery room must supply at least 30 ACH30\,\text{ACH} and be actuated automatically by a refrigerant detector set at __________.

150 ppm150\,\text{ppm}