1/25
Looks like no tags are added yet.
1. Sprinkler system components
Label on Diagram
2. NFPA 241 components
Fire Prevention Program Manager, pre-incident plan, fire protection, egress, access roadways
3. Fire extinguisher requirements
NFPA 10, classes A B C D K, monthly inspection, PASS, 2A per 3000 sq ft
4. NFPA standard for pre-incident planning
NFPA 1620
5. IDLH
Immediately Dangerous to Life or Health
6. Three sides of the fire triangle
oxygen, fuel, heat
7. Define ignition temperature
lowest temperature at which a substance catches fire
8. Four types of heat transfer
direct contact, conduction, convection, radiation
9. Four phases of fire
ignition, growth, fully developed, decay
10. Five types of building construction
fire resistive, non-combustible, ordinary, heavy timber, wood frame
11. Effects fire has on steel
loses strength, buckles, deforms, oxidizes
12. Definition of code
minimum requirements adopted into law and enforced by the AHJ
13. Only OSHA/NFPA document that covers life safety in both new and existing structures
NFPA 101
14. Factors that influence the Permit Model for inspection priority/frequency
life loss potential, hazmat, hazardous processes
15. Role of fire marshal
AHJ, enforces fire code, plan review, inspections
16. Three plan components evaluated in a plan review
site plans, building plans, fire protection systems plans
17. Organizations with key roles in fire research
NFPA, NIST, UL, FSRI
18. Life Safety Code (only OSHA/NFPA document covering new and existing structures)
NFPA 101
19. Critical element to consider on a construction site
water supply
20. Primary role of the fire service in the community
protect life and property
21. Responsibilities the fire department may take on in a community
EMS, hazmat, technical rescue, structure fires, wildland fires
22. Purpose of risk management
prevent or reduce losses
23. Four phases of risk management
Risk Management: proactive effort to identify hazards and minimize exposure before a loss
Risk Control: a conscious action (or decision not to act) that reduces the frequency, severity or unpredictability
of losses
Loss Control: kicks in after a loss; immediate steps to control its effects and keep the organization running
Loss Management: returning the organization as close as possible to its pre-loss state, accepting it may never
be exactly the same
24. Six classes or categories of materials
concrete, steel, wood, masonry, glass, drywall
25. Four actions needed in a fire plan for a construction site
storage, hazards, utilities, fire protection
26. Construction standards project managers can use for a safe work site
NFPA 241, NFPA 1, NFPA 5000, OSHA