1/52
Looks like no tags are added yet.
Laboratory Biosafety
The containment principles, technologies, and practices implemented to prevent unintentional exposure to pathogens and toxins, or their unintentional release
Protecting people from dangerous pathogens
Laboratory Biosecurity
Institutional and personal security measures designed to prevent the loss, theft, misuse, diversion, or intentional release of pathogens and toxins
Protecting people from dangerous people
Severe Acute Respiratory Syndrome (SARS) 2003
Infected over 8,000 people and killed almost 800
Laboratory acquired SARS outbreak
Severe Acute Respiratory Syndrome (SARS) 2003
How did biorisk start?
Singapore - September 2003
Taiwan - December 2004
Mainland China - March 2004
Enumerate the affected countries of SARS
Singapore
A male graduate student in Environmental Science working in a BSL-3 laboratory performed inappropriate laboratory procedures, resulting in cross-contamination involving SARS-CoV.
Taiwan
A male laboratory scientist at a BSL-4 laboratory at the Institute of Preventive Medicine, National Defense Medical Center, was working with SARS-CoV when he discovered a material spill, which he disinfected with 70% ethanol before manually cleaning it up.
China
Female research student Failed or incomplete inactivation of SARS-CoV
Roles of Managers in BRM
- Conducts judicious evaluation of risk, selecting which mitigation measures will be employed
- Arrives at a decision
- Influences to Management Decision
Biorisk Management and the AMP Model Biorisk
Biological toxins or infectious agents
Unintentional exposure to unauthorized access, accidental release or loss, theft, misuse, diversion, or intentional unauthorized release of biohazards
Birorisk Management
The integration of biosafety and biosecurity to manage risk when working with biological toxins and infectious agents.
Biorisk Management
A system or process to control safety and security risk associated with the handling or storage and disposal or biological agents and toxins in laboratories and facilities (CWA)
Biorisk Management
Encompasses the identification, understanding, and management aspects of a system in an interrelated process.
Assessment, Mitigation, Performance
Enumerate the three components of the AMP model
Assessment
Process of identifying hazards and evaluating the risk associated with biological agent and toxins
Mitigation
Actions and control measure that are put into place to reduce or eliminate the risk associated to biological agents or toxins
Performance
Improving biorisk management through recording, measuring, and evaluating, organizational actions and outcomes to reduce biorisk
AMP Model
requires control measures be based on a robust risk assessment, and a continuous evaluation of effective and suitability of the control measures.
Hazard
object that can cause harm
Threat
person who has intent and/or ability to cause harm to other people, animals, or the institution
LIkelihood
probability an event occurring
Risk
likelihood of an event/incident with hazard that has consequences
Consequences
severity of an event/result
Risk
- Refers to a situation which is exposed to harm, danger, or loss
- Potential of harm
- Probability
- It can be expressed in degrees
Hazard
- Defines as something that can cause harm, loss or danger
- Potential source of harm
- Physical object, situation, or setting
- It cannot be expressed in degrees
Laboratory Risk Assessment
An analytical procedure designed to characterize and evaluate safety and security risk in a laboratory
Define the Situation, Define the Risk, Characterize the Risk, Determine if the risk is acceptable or not
Enuemrate the Process of Risk Assessment
Define the Situation
Identify the hazards and risk , the at-risk host inside and outside the laboratory, work activities, procedures and equipment, and lab environment
Define the risk
Review how individuals inside and outside the laboratory maybe exposed to the identified hazard
Characterize the Risk
compare the likelihood and the consequences of infection
Determine if the risk is acceptable or not
The process of evaluating the biorisk arising from a biohazard
i. Adequacy of any existing controls
ii. Deciding whether or not the biorisk is acceptable
Rare - 1
May occur only in exceptional circumstances
Unlikely - 2
Could occur at some point
Possible - 3
Might occur at some point
LIkely - 4
Will probably occur in most circumstances
Almost Certain - 5
Expected to occur in most circumstances
Insignificant - 1
No injuries, low financial loss
Minor - 2
First aid treatment, on site release, immediately contained
Moderate - 3
Medical treatment required, high financial loss
Major - 4
Extensive injuries, loss of production, major financial loss
Catastrophic - 5
Death, toxic release off site with detrimental effect, huge financial loss
Mitigation
The second fundamental component of the biorisk management model
Biorisk Mitigation Measurement
The action and control measures are put into place to reduce or eliminate the risk associated with biological agents and toxins.
Elimination
Physically remove the hazard
Substitution
Substitution of a serious pathogen with one that is much less pathogenic
Isolation
Isolate people from the hazard
Engineering Controls
Physical changes to work stations, equipment, materials, production, facilities, or any other relevant aspect of the work environment that reduce or prevent exposure to hazard
Adminstrative
Policies, standards and guidelines
Practices and Procedures
Process and activities
PPE
Devices worn by the worker to protect against hazards
The last pillar of the biorisk management model
Performance Evaluation
- A systematic process intended to achieve organizational objectives and goals
- Ensures that the implemented mitigation measures are indeed reducing or elimination risk - Can be eliminated or replaced
Performance Management
A reevaluation of the overall mitigation strategy