Comprehensive Question and Answer flashcards covering the IISE Lean Green Belt course curriculum, including core Lean principles, waste identification, 5S, visual controls, process mapping tools, takt time, flow, pull systems, SMED, TPM, Poka Yoke, PDCA, and change management.
What is the official mission of the Institute of Industrial & Systems Engineers (IISE)?
To serve those who solve the complex and critical problems of the world.
How are Lean and Six Sigma practitioners organized by belt level, and what is the specific role of a Green Belt?
Practitioners are organized into Yellow Belt (Basic Knowledge), Green Belt (Project Leadership), and Black Belt (Mentors for multiple projects/Green Belts). Green Belts manage projects and deliver quantitative results to companies that improve the bottom line.
What are the format parameters, question count, and passing score for the IISE Lean Green Belt exam?
The exam is individual work allowing course notes and materials (no internet), with a 2-hour time limit, 40 questions, and a passing score threshold of 70%.
How do Lean, Six Sigma, and Lean Six Sigma differ in their primary methodologies?
Lean focuses on reducing waste and minimizing defects while respecting people; Six Sigma uses rigorous data analytics and statistical tools to minimize process variability; Lean Six Sigma combines eliminating defects (Lean) with minimizing process variability (Six Sigma).
What are the "3C's" of the KEEN Entrepreneurial Mindset (EM) framework?
Curiosity, Connections, and Creating Value.
According to the course notes, what percentage of time in typical processes is spent doing things that increase costs without creating customer value?
75% to 95%.
What are the five core steps of the Lean Philosophy in sequential order?
What is the Shingo Model, and after whom is it named?
An Operational Excellence Framework focusing on principles, systems, and tools developed by the Shingo Institute, named after Shigeo Shingo, a pioneer in Lean and the Toyota Production System (TPS).
What are the four dimensions of alignment in the Shingo Guiding Framework?
Cultural enablers, Continuous improvement, Enterprise alignment, and Results.
How is a Lean Enterprise formally defined?
Achieving customer expectations through the use of the absolute minimum amount of man, machine, and material, achieved by continuous pursuit, identification, and elimination of waste.
What historical milestone in Lean was introduced by Eli Whitney in 1799?
Interchangeable parts combined with power machinery and division of labor with the cotton gin, forming the basis of the American system of manufacturing.
Who wrote Principles of Scientific Management in 1911 and applied scientific methods to work as the first efficiency expert?
Frederick W. Taylor.
Who coined the term "Lean" to describe the Toyota Production System, and in what publication did it debut?
John Krafcik, in his 1988 article titled "Triumph of the Lean Production System".
What three criteria must an activity satisfy to be classified as Value-Added (VA)?
What is the operational difference between unnecessary non-value-added activities and necessary non-value-added activities?
Unnecessary non-value-added steps are pure waste not essential to the process and should be eliminated; necessary non-value-added (value-enabling) steps are required by law, regulation, or safety and should have their completion time minimized.
In Stakeholder Mapping using the Power-Interest Grid, what are the four engagement strategies corresponding to the quadrants?
Inform (low power, low interest), Consult (high power, low interest), Collaborate (high power, high interest), and Monitor / keep informed (low power, high interest).
In the Home Building Business Case Study, what two actionable solutions were implemented after analyzing warranty dissatisfiers with a Critical-to-Quality (CTQ) tree?
What are the eight types of waste (muda) recognized in Lean?
Defect, Overproduction, Waiting, Neglected talent, Transportation, Inventory, Motion, and Excess processing.
Which of the eight wastes is considered the greatest waste according to Toyota, and why?
Overproduction, because producing more than needed or sooner than needed creates and compounds all other forms of waste.
What are the five steps of 5S along with their Japanese terms?
Under the 5S Set in Order guidelines, what are the maximum time limits for finding any item?
The person working in the area should find anything in 30 seconds or less, and anyone else should find anything in 60 seconds or less.
According to 5S Set in Order proximity rules, how should storage locations be assigned based on frequency of use?
Hourly use: within arm's reach; Every shift: within a short walk; Daily: further away; Monthly: department storage; Annually: central or off-site storage.

In visual management, what is the name of this device, and what do its three standard colors signify?
An Andon light stack. Red indicates Stopped, Amber/Yellow indicates Warning, and Green indicates Normal operations.
What are the three levels of detail in process mapping and their associated perspective heights?
Macro/High-Level (30,000-foot view, e.g., VSM, SIPOC); Mini/Mid-Level (10,000-foot view, e.g., Swim lane diagrams); Micro/Low-Level (ground or weeds level, e.g., detailed process flowcharts).
What does the SIPOC acronym stand for, and what is its purpose?
Supplier, Input, Process, Output, Customer. It identifies high-level process steps and upstream/downstream dependencies to define project scope before detailed mapping.

Based on this reference chart of standard flowchart symbols, what do the rounded rectangle, diamond, D-shape, and burst shapes represent?
Rounded rectangle = Terminator (Start/End of Process); Diamond = Decision Point; D-shape = Delay / Wait; Burst shape = Burst / Problem / Waste.
What is a Swim Lane diagram, and what is its primary distinct advantage?
A cross-functional process map organized into rows or columns showing sub-processes, departments, or roles, distinctly highlighting parallel tasks and operational hand-offs.
What is a Spaghetti Diagram, and which two wastes does it primarily identify?
A continuous line tracing the physical travel path of an item or person through an area to expose layout inefficiencies, primarily highlighting the wastes of Motion and Transportation.
How is Work-in-Progress (WIP) converted into days of inventory on a Value Stream Map when total inventory is 7,000 pieces and daily customer demand is 920 pieces/day?
920pieces/day7,000pieces≈7.6days of inventory.
What is Takt Time, and how is it calculated?
Takt time is the demand rate or pace required to produce one unit to match customer demand. It is calculated as: Takt Time=Customer DemandAvailable Work Time.
If an 8-hour (480 minute) shift includes 30 minutes for breaks, 10 minutes for wash, and 5 minutes for meetings, what is the takt time for a customer demand of 55 pieces/shift?
Available minutes = 480−30−10−5=435 minutes. Available seconds = 435×60=26,100 seconds. Takt Time = 55pieces26,100seconds=474seconds per piece.

Based on this process comparison, how does continuous flow processing change lead times compared to batch and queue processing?
Continuous flow reduces total order lead time from 30+ minutes to 12 minutes, and reduces the lead time for the first piece from 21+ minutes to 3 minutes.
What root cause and ultimate countermeasure were discovered during the Five Whys investigation at the Thomas Jefferson Memorial?
Frequent washing deteriorated the stone due to bird droppings; birds were attracted by spiders, which fed on insects drawn to night lighting. Turning on the lights one hour later reduced bird droppings by 90%.
What are the eight sequential steps across the Plan-Do-Check-Act (PDCA) framework?
Plan: 1. Clarify the problem; 2. Break down the problem; 3. Set a target; 4. Find and analyze root cause; 5. Develop countermeasures. Do: 6. Implement countermeasure. Check: 7. Evaluate results and processes. Act: 8. Standardize successful improvement.
What is a Kanban, and what are its two primary functional types?
A visual signal or card used to authorize the replenishment or movement of materials based on actual consumption. Its two types are Withdrawal Kanban (movement) and Production Kanban (authorizing manufacturing).

What two pull mechanisms are contrasted in this supermarket pull model?
Production Pull (which authorizes the supplying process to replace inventory into the supermarket) and Withdrawal Pull (which authorizes the customer process to retrieve parts from the supermarket).
What are the Japanese terms and definitions for the three categories of waste addressed by Heijunka?
Muda (wastefulness, non-value-added activities), Muri (overburden and unreasonable stress on people/processes), and Mura (unevenness, irregularity, and unlevel conditions).
What is Jidoka, and how does autonomation differ from conventional automation?
Jidoka is "automation with a human touch." Conventional automation simply runs cycles until manually stopped or crashed, whereas autonomation endows machines with autonomous defect-detection to halt immediately upon abnormality, preventing mass defects.
What is the primary objective of Single-Minute Exchange of Dies (SMED) regarding setup activities?
To reduce changeover time to single digits (under 10 minutes) by separating internal tasks (done while machine is shut down) from external tasks (done while running), converting internal steps to external, and streamlining all steps.
What is the mathematical formula for Overall Equipment Effectiveness (OEE) in Total Productive Maintenance (TPM), and what benchmark represents world-class performance?
OEE=Availability×Performance×Quality, where 85% is considered world-class.
What does Poka Yoke mean, and what are its three fundamental tenets?
Error-proofing or mistake-proofing (poka = inadvertent mistake; yoke = prevent). Its three tenets are: 1. Make it difficult to make a mistake; 2. Make it easy to identify a mistake made; 3. Make it easy to fix the mistake.
How do Kaizen and Kaikaku differ in scope and duration?
Kaizen represents continuous, small, incremental improvements (kai = change, zen = good); Kaikaku represents radical, revolutionary process improvement implemented within a limited timeframe (1 week to 3 months).
What is an A3 report in Lean problem-solving?
A single-page, structured problem-solving tool documented on an 11×17inch (A3) paper that consolidates problem statements, current conditions, root causes, countermeasures, and action plans.
What is the core principle of Eliyahu Goldratt's Theory of Constraints (TOC)?
Process improvement must identify and focus on the system's single primary constraint (bottleneck), elevate it to improve overall flow, and then move to the next constraint once resolved.
According to the Formula for Success in Change Management, what negative outcome occurs if "Leadership" is missing from the equation?
Fear and anxiety.

What stages of productivity and morale are depicted across this change management transition model?
The curve passes through Unawareness (denial, false hope), Awareness (anger/panic, depression), Understanding (letting go, accepting reality), Buy-in (testing, merging past and present), and Acceptance (internalization, workplace commitment).