1/47
Looks like no tags are added yet.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
Lean six sigma
process improvement philosophy combining lean and six sigma to improve quality, efficiency, and customer satisfaction
Lean: Focuses on eliminating waste and non-value-added activities.
Six Sigma: Focuses on reducing variation and defects through data and statistical analysis.
Together: Improve quality, reduce costs, shorten lead times, and increase efficiency.
six sigma helps reduce
improve process capability by reducing variation and defects
6 sigma performance
approx 3.4 defects per million opportunities (DPMO) → accuracy → 99.99966%
DMAIC → 5 step process for improving existing processes when the causes of problems are unknown
→ Define
→ measure
→ analyze
→ improve
→ control
5 lean principles
Identify Value — determine what customers consider valuable.
Map the Value Stream — identify activities that create value and those that create waste.
Create Flow — ensure work moves smoothly without unnecessary interruptions.
Establish Pull — produce based on actual customer demand.
Pursue Perfection — continuously improve the process.
Lean tool → 5S
organize workplaces to improve efficiency and safety
Lean tool → just in time
produce only what is needed, when needed
Lean tool → Kaizen
continuous improvement through small, ongoing changes
Lean tool → Kanban
visual signals that control workflow and inventory
Lean tool → poka yoke
error-proofing to prevent or immediately detect mistakes
Lean tool → pull system
production triggered by customer demand
Lean tool → standard work
documented best known method for completing tasks
Lean tool → value stream mapping
maps material and info flows to identify waste
Lean tool → visual factory
uses visual cues to communicate status and problems quickly
8 wastes of lean (DOWNTIME)
D — Defects → Errors requiring correction or rework
O — Overproduction → Producing more than needed
W — Waiting → Idle time between process steps
N — Non-Utilized Talent → Not fully using employees' skills or ideas
T — Transportation → Unnecessary movement of materials
I — Inventory → Excess materials or finished goods
M — Motion → Unnecessary movement by workers
E — Extra Processing → Performing more work than customers require
nominal group technique
Individuals generate ideas independently, share them, then rank options
Lean waste → Defects
Errors requiring correction or rework
Lean waste → Overproduction
Producing more than needed
Lean waste → Waiting
Idle time between process steps
Lean waste → Non-Utilized Talent
Not fully using employees' skills or ideas
Lean waste → Transportation
Unnecessary movement of materials
Lean waste → Inventory
Excess materials or finished goods
Lean waste → Motion
Unnecessary movement by workers
Lean waste → Extra Processing
Performing more work than customers require
Multivoting
Team members vote to narrow a large list of options.
Vroom-Yetton Decision Model
Helps leaders determine how much team participation a decision requires.
Weighted Scoring Model
Quantitatively compares alternatives using weighted criteria.
Check Sheet
Collect and tally data consistently
Example: Recording how many products have scratches, dents, or missing parts.
Pareto Chart
Identify the most important problems
based on 80/20 rule → Approximately 80% of problems may come from 20% of causes
Run Chart
Track performance over time
Example: Tracking customer complaints each month
Run Chart vs. Control Chart: Run charts show patterns over time; control charts add statistical limits to evaluate process stability.
Scatter Diagram
Identify relationships between variables
Flowchart
Map process steps and decisions
Example: Customer places order → Inventory checked → Order processed → Product shipped.
Fishbone Diagram (cause and effect)
Identify possible root causes
Often combined with brainstorming and the 5 Whys technique.
Histogram
Show the frequency distribution of data
Six Major Cause Categories (6 Ms)
Man, Machine, Method, Material, Measurement, and Mother Nature
6 Ms → Man
Workers, training, staffing, and skills
6 Ms → Machine
Equipment, tools, and technology
6 Ms → Method
Procedures and processes
6 Ms → Material
Raw materials and components
6 Ms → Measurement
Data collection, gauges, and calibration
6 Ms → Mother Nature
Environmental conditions
defects per unit formula
DPU = total defects / total units
Tollgates
Critical checkpoints that must be completed before advancing to the next DMAIC phase.
Three Define Phase Tollgates:
Map the process.
Define customer needs and requirements.
Create a project charter.
Project Identification Process:
Select the project using a weighted scoring model → Map the process using SIPOC → Formally authorize the project using a charter.
SIPOC Diagram
SIPOC: A high-level process map that documents a business process from beginning to end.
Letter | Meaning | Description |
|---|---|---|
S | Suppliers | Who provides resources? |
I | Inputs | What resources are needed? |
P | Process | What activities occur? |
O | Outputs | What does the process produce? |
C | Customers | Who receives the outputs? |
Purpose of SIPOC
Establish a shared understanding of a process.
Identify process boundaries.
Clarify suppliers, inputs, outputs, and customers.
Support improvement planning during Define.
Seven Steps to Create SIPOC:
Choose a process.
Define the Process (4–10 high-level steps).
Identify Outputs (typically 3–4).
Identify Customers.
Identify Inputs.
Identify Suppliers (at least one for each input).
Share and validate the diagram.
Project Charter
A formal document authorizing an improvement project and outlining its objectives, scope, resources, responsibilities, and expected results.