117: USP 797 pt.2

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/29

encourage image

There's no tags or description

Looks like no tags are added yet.

30 Terms

1
New cards

garb items

low lint

  • gown or coveralls w/ sleeves snug around wrists & enclosed at neck

  • disposable shoe & head covers

disposable facial hair cover

face mask

sterile powder-free gloves


2
New cards

sample garbing procedure

IN ORDER


on dirty side of ante room

  • Head and facial hair covers

  • Face masks/eye shields

  • Shoe covers while stepping over line of demarcation to clean side

on clean side of ante room

  • Wash hands w/ proper technique

  • Don non-shedding gown

upon entering buffer area

. Perform hand sanitizing procedure

Don sterile, powder-free gloves


3
New cards

What is media-fill testing?


a test used to evaluate whether a person can properly perform aseptic (sterile) compounding.

  • mandatory for everyone who compound


4
New cards

media filling test according to USP <797>

for testing procedures, use the most difficult and challenging

compounding procedures and processing conditions encountered by the person

during a work shift (e.g., the most manipulations, most complex flow of materials,

longest time to compound), replacing all the components used in the CSP’s with

microbial growth medium.

5
New cards

compouding facilities

  • must minimize risk of contamination of CSPs

  • air quality must be met with PECs & SECs

  • ante-room & buffer room must meet air quality


6
New cards

engineering controls

  • Primary Engineering Controls

  • Secondary Engineering Controls


7
New cards
  • Primary Engineering Controls


  • device or zone that provides an ISO Class 5 air quality environment for sterile compounding (eg Laminar Airflow Workbench


8
New cards

secondary Engineering Controls


The area where the PEC is placed (eg cleanroom)


9
New cards

air quality requirements

  • ante-room minimum

    • ISO Class 8 (if have positive pressure buffer room)

    • ISO Class 7 (if have negative pressure buffer room)

  • Buffer room minimum

    • ISO Class 7

  • PEC

    • ISO Class 5 or better if compounding Category 1, Category 2, and Category 3 CSPs

    • If compounding only Category 1 CSPs, the PEC may be placed in an unclassified segregated compounding area


10
New cards

other clean room suite requirements

  • Temperature 20 degrees Celsius

  • Humidity <60%

  • Pressure differential monitoring system

  • The ante-room must have a line of demarcation to separate the clean side from the dirty side

  • The ante-room is entered through the dirty side/room, and the clean side/ room is the area closest to

  • the buffer room.

  • Air sampling every 6 months

  • Surface sampling monthly

  • Interior of PEC and equipment in PEC, areas near the PEC, frequently touched surfaces

  • Cleaning and disinfecting requirements as outlined in USP797


11
New cards

SCA

  • unclassified area, w/o am ante-room or buffer room

  • only cat 1 csps can be compounded here


12
New cards

where SCA should and should not be placed

should:

  • away from unsealed windows, doors that connect to outdoors, traffic flow

should not:

  • environmental control challenges (e.g., restrooms, warehouses, or food preparation

areas) could negatively affect the air quality of the PEC within the SCA

visible perimeter must establish the boundaries of the SCA.


13
New cards

primary engineering controls

  • LAFW (Laminar Airflow Workbench)

     BSC (Biological Safety Cabinet)

     CAI (Compounding Aseptic Isolator)

     CACI (Compounding Aseptic Containment Isolator)


14
New cards

laminar airflow system

  • system provides ISO class 5 or better conditions

  • undirectional airflow, horizontal or vertical


15
New cards

how to filter room air

  • via a HEPA filter

  • remove particles, dust, bacteria

    • filters 99.97% of particles 0.3microns in size or larger

    • directional air flow will blow out contamination as it enters the hood (up to a point)


16
New cards
  • horizontal LAFW



  • maintain a direct, open path btw HepA filter & area inside work station

  • avoid blocking critical sites from direction of “first air”

  • small items close to HEPA filter & larger to opening of work station

  • nonsterile items downstream from sterile ones

  • hand movements should not disturb airflow pattern

  • work area should be 3 inches from back of LAFW & 6 inches inside of front of workstation

  • swab all surfaces w/ alcohol

  • spray gloves w/ 70% IPA


17
New cards

first air

air released from the HEPA filter

18
New cards

how to sanitize w/ 70% alcohol

  • wipe in direction away from filter

  • back to front across vial stopper


19
New cards

Vertical LAFW

  • Place larger containers toward the back of the work area

  • Do not block the airflow from above

    • Do not have hands going over the top of objects in hood


20
New cards

vials: procedure

  • do not block “first air”

  • hold vial so you can see needle in vial


21
New cards

how should items be wired down

  • w. sporicidal agent, disinfectant, or sterile 70% IPA before entering cleanroom suite and SCA’s

  • Again with 70% IPA before placing in PEC (hood)


22
New cards

can cardboard be in cleanroom

NOOO

23
New cards

sterile testing required for

not for category 1 CSPs

may be required for Category 2 (depending on BUD assigned)

required for Category 3 CSPs

24
New cards

Bacterial endotoxin testing

Required if sterility testing done or if one or more nonsterile ingredient used

 Must not exceed limits listed in USP<85>

25
New cards

introducing items into sec & pec

. Transitioning into the Ante Room (ISO 8)

  • Action: items from (dirty side) across the demarcation line —> the clean side of the ante room.

  • Sanitization: wipe items w/ germicide, sporicidal agent, or 70% IPA wipe


2. Transitioning into the Clean Room (ISO 7)

  • Action: items from the ante room- —> SEC cleanroom.

  • Sanitization: disinfect items w. sterile 70% IPA wipe


3. Transitioning into the PEC (ISO 5)

  • Action: Introducing items directly into the Primary Engineering Control (such as a laminar airflow workbench [LAFW], biological safety cabinet [BSC], or compounding aseptic isolator [CAI]).

  • Sanitization: wipe w/ sterile 70% IPA wipe right as items are placed into the ISO 5 zone

  • do not disrupt unidirectional airflow or introduce contaminants into the direct compounding area (DCA).


26
New cards

sec & pec

  • SEC (Secondary Engineering Control): The cleanroom suite, comprising the cleanroom (ISO 7) and ante room (ISO 8).

  • PEC (Primary Engineering Control): The ISO 5 device or zone (e.g., LAFW, BSC, CAI, CACI) that provides an ultra-clean environment for actual compounding activities.


27
New cards

require sanitizing at every step

  • sterile 70% isopropyl alc or other disinfectant to sanitize materials at each step to higher ISO level

  • a drug vial will be wiped 2 times from out to into the hood


28
New cards

antetoom —> hood

iso 8 (ante-room) —> iso 7 (clean room) —> iso 5 ( hood)

29
New cards

master formulation record for compounded sterile products

  • Name, strength or activity, and dosage form

  • ingredients and amounts of each

    • characteristics of components (e.g. particle size, solubility, etc.)

  • Type and size of container-closure system

  •  Complete instructions for preparation, including:

  •  Equipment, supplies, steps, special precautions

  •  Physical description of compound

  •  BUD and storage requirements

  •  Reference used to determine stability

  •  Quality control procedures

  •  Any info needed to describe process and ensure repeatability


30
New cards

labeling

  • Assigned internal id number (e.g. prescription #)

  • Active ingredients and amounts, or concentrations

  • Storage conditions (if other than room temp)

  • BUD

  • Dosage form

  • Total amount of volume

  • If single dose container or multiple dose container, label as such

  • Route of administration, special handling instructions, warning statements

  • Contact information of compounding facility, if sent out

  • Label stating that product is compounded