76 Terms

1
New cards

Materiel Joint Capabilities (MIDS)

Pre-Pathway (Left of MDD); Identification of capability gap.

2
New cards

Materiel Development Decision (MDD)

Entry point into acquisition process.

3
New cards

Materiel Solution Analysis (MSA)

Focused on assessing alternative materiel solutions to meet the validated gap.

4
New cards

Milestone A

Decision Point. MDA approves the preferred materiel concept & authorizes entry into TMRR.

5
New cards

Technology Maturation & Risk Reduction (TMRR)

Dedicated to reducing technology, manufacturing & integration risks.

6
New cards

Milestone B

Decision Point. Initiation of an acquisition program. Authorization to enter EMD.

7
New cards

Engineering & Manufacturing Development (EMD)

System is designed, built, integrated, tested, & prepared for production.

8
New cards

Milestone C

Decision Point. MDA authorizes entry into low-rate production (LRIP) or limited fielding.

9
New cards

Production & Deployment

Post-MS C to FRPDR. Achieve an operational capability & deliver systems to user units.

10
New cards

Full-Rate Production Decision Review (FRPDR)

Decision Point. Within P&D. MDA review to authorize proceeding past LRIP to full-rate production.

11
New cards

Operations & Support

Post-FRPDR to Disposal. Longest & most expensive phase. Executes the product support strategy & disposal.

12
New cards

Initial Capabilities Document (ICD)

Validated before MDD. Guides MSA. Identifies capability gap. NEVER contains specific systems solution.

13
New cards

Capability Development Document (CDD)

Drafted in TMRR. Validated prior to Milestone B. Defines measurable, testable performance parameters (KPPs/KSAs) for the EMD design

14
New cards

Capability Production Document (CPD)

Drafted in EMD. Validated prior to Milestone C. Finalizes production-specific performance values.

15
New cards

Analysis of Alternatives (AoA)

Conducted during MSA. Analytical comparison of the operational effectiveness, suitability & life-cycle cost of alternative solutions.

16
New cards

Technology Development Strategy (TDS)

Developed for Milestone A review. Outlines the strategy for maturing critical technologies during the TMRR phase.

17
New cards

Acquisition Strategy (AS)

Drafted for Milestone B. Updated at Milestone C & FRPDR. PM’s master business & technical roadmap for managing program execution.

18
New cards

Acquisition Program Baseline (APB)

Established at Milestone B. Updated at Milestone C. Agreement between the PM & MDA. Establishing cost, schedule & performance boundaries.

19
New cards

System Requirement Review (SRR)

Early TMRR. Verifies the system requirements are consistent with the preferred concept & validated CDD.

20
New cards

System Functional Review (SFR)

Mid TMRR. Establishes the Functional Baseline. Ensures funtional specs are ready for preliminary design.

21
New cards

Preliminary Design Review (PDR)

Late TMRR or early EMD. Establishes the Allocated Baseline. Determines if the system is ready to proceed to detailed design. (Must complete prior to Milestone B for major programs.

22
New cards

Critical Design Review (CDR)

Mid EMD. Establishes Product Baseline. Verifies the detailed design is stable & ready to Begin fabrication/coding.

23
New cards

Test Readiness Review (TRR)

Late EMD. Ensures the test subsystem, test software, facilities, & personnel are ready are ready to begin formal testing.

24
New cards

Production Readiness Review (PRR)

End of EMD. Evaluates weather the contractor’s manufacturing design & processes are ready to enter production.

25
New cards

Functional Configuration Audit (FCA)

Late EMD. Verifies that the actual performance of the physical system matches its functional specifications (tested performance vs spec)

26
New cards

Physical Configuration Audit (PCA)

Late EMD/LRIP. Verifies that the physical design matches the “as-built” technical documentation (drawings vs. actual build).

27
New cards

Test & Evaluation Master Plan (TEMP)

Drafted at MS A. Updated at MS B, MDC & FRPDR. Document detailing the programs developmental, operational & live-fire test strategies.

28
New cards

Developmental Test & Evaluation (DT&E)

Dominates EMD. Controlled engineering test to VERIFY that the design meets technical specifications.

29
New cards

Initial Operational Test & Evaluation (IOT&E)

Late EMD/LRIP. Independent testing in realistic operational conditions to evaluate effectiveness & suitability.

30
New cards

Life Cycle Sustainment Plan (LCSP)

Drafted at MS A. Updated at MSB, MSC & FRPDR. PMs program management plan for the integration of supportability into the system design & the fielding of the sustainment package.

31
New cards

Performance-Based Logistics (PBL)

Formulated in EMD. Executed in O&S.A sustainment strategy that lurches performance outcomes (system availability) rather than transactions (space parts).

32
New cards

Planning, Programming, Budgeting & Execution (PPBE)

Annual process where DoD allocates financial resources to acquisition programs.

33
New cards

Acquisition Category (ACAT)

Determined at MDD & monitored throughout. Classifies programs based on RDT&E/Procurement dollar thresholds or special interest, defining the level of oversight.

34
New cards

Milestone Decision Authority (MDA)

Presides over MDD, MS A, MS B, MS C, & FRPDR. Responsible for a program, including authority to approve phase progression.

35
New cards

Integrated Product Team (IPT)

Formed pre-MDD. Active through O&S. Multidisciplinary team collaborating to execute the programs.

36
New cards

Cost Analysis Requirements Description (CARD)

Submitted prior to Milestones B & C & FRPDR. Technical & programmatic “baseline description” of the program used to build Cost Estimates (POE & ICE)

37
New cards

Earned Value Management (EVM)

Executed during EMD & P&D. Management technique that integrates program scope, schedule & cost metrics to measure progress & predicts final costs.

38
New cards

Integrated Baseline Review (IBR)

Conducted within 180 days of contract award. Typically EMD. A joint PM/ Contractor review to establish a mutual understanding of the Performance Measurement Baseline (PMB) risks.

39
New cards

Joint Capabilities Integration & Development System (JCIDS)

Requirements generation process managed by the Joint Oversight Council (JROC); Produces ICD, CDD, CPD.

40
New cards

Key Performance Parameters (KPP)

Mandatory; has Threshold & Objective values.

41
New cards

Modular Open Systems Approach (MOSA)

Open standards & well-defined interfaces. Enables competition for future upgrades, mitigates vendor lock & reduces lifecycle sustainment costs.

42
New cards

TRL 6

System prototype demonstrated in a relevant environment. Requirement for Milestone B. CANNOT enter EMD without it.

43
New cards

TRL 7

Prototype demonstrated in an operational environment. Late EMD/Early P&D. (flight or combat vehicle test)

44
New cards

Cybersecurity

Tested as a system survivability requirement & supply chain risk (SCRM).

45
New cards

Point of Total Assumption (PTA)

On Fixed Plus Incentive (FPI) contracts where the contractor assumes 100% of cost overruns up to the ceiling price.

46
New cards

Cost-Reimbursement (CPFF/CPIF)

High technical risk to the Government (TMRR/EMD). Better for Contractor.

47
New cards

Fixed-Price Incentive Firm (FPI)

Mature design/early production (LRIP). Better for Governement.

48
New cards

Firm-Fixed-Price (FFP)

Stable/Commercial. Better for Government.

49
New cards

Lowest Price Technically Acceptable (LPTA)

Use when requirements are we;;-defined & there is no value in exceeding thresholds.

50
New cards

Best Value Tradeoff

Use when performance above threshold warrants paying a higher price.

51
New cards

Source Selection Authority (SSA)

Makes the final decision. Informed by the SSAC.

52
New cards

Source Selection Advisory Council (SSAC)

Takes SSEB’s findings. Performs high level strategic & comaprtive analysis & prepares award recommendations.

53
New cards

Source Selection Evaluation Board (SSEB)

Evaluates proposals against Section M criteria. (Never compares proposals against each other)

54
New cards

Adaptive Acquisition Framework (AAF)

DoD’s set of six acquisition pathways designed to tailor acquisition strategies to capability characteristics. (MCA, MTA, Urgent, Software, DBS, & Services).

55
New cards

Acquisition Decision Memorandum (ADM)

The official document signed by the MDA recording decisions, exit criteria & directed actions at a Milestone or Decision Point.

56
New cards

Major Defense Acquisition Program (MDAP)

ACAT I program exceeding RDT&E ($525M) or Procurement ($3.06 B) thresholds.

57
New cards

Low-Rate Initial Production (LRIP)

The initial production quantity after Milestone C used to establish an initial production base, supports IOT&E & permit an orderly ramp-up to FRP.

58
New cards

Full-Rate Production (FRP)

Decision point authorizing economic-rate production & widespread deployment following successful IOT&E & manufacturing verification.

59
New cards

Initial Operational Capability (IOC)

When the first operational units are equipped, trained & capable of conducting mission operations.

60
New cards

Full Operational Capability (FOC)

When all programmed units are fully equipped & sustained.

61
New cards

Independent Cost Estimate (ICE)

Independent life-cycle cost estimate prepared by CAPE required prior to Milestones A,B,C & FRP for MDAPs.

62
New cards

Independent Technical Risk Assessment (ITRA)

Independent review of technical maturity & engineering risks required by statute prior to Milestones A, B & C for MDAPs.

63
New cards

Program Protection Plan (PPP)

The cybersecurity, supply chain risk management (SCRM), & anti-tamper plan designed to protect Critical Program Information (CPI) & Critical Functions.

64
New cards

Systems Engineering Plan (SEP)

The blueprint for the technical management, architecture design, technical reviews & risk management of the program across all phases.

65
New cards

Validated Online LifecycleThreat (VOLT)

DIA or Service Intelligence Center threat report that establishes the baseline threat environment for the system.

66
New cards

Live-Fire Test & Evaluation (LFT&E)

Realistic survive ability & lethality testing for covered systems before entering full-fate production.

67
New cards

Technology Readiness Level (TRL)

Metrics used to measure the maturity of Critical Technology Elements (TRL,1–9)

68
New cards

Manufacturing Readiness Level (MRL)

Metrics used to measure the maturity of the manufacturing processes (MRL, 1–10)

69
New cards

Supply Chain Risk Management (SCRM)

Ensures hardware, software, microelectronics & assemblies used in DoD systems are not compromised by adversaries through sabotage.

70
New cards

MRL 6

Identifies manufacturing processes & materials that are critical to the design. Production revenant environment. PDR/Milestone B.

71
New cards

MRL 7

Verifies the detailed is compatible with the planned manufacturing processes. Production representative environment. CDR.

72
New cards

MRL 8

Confirming that manufacturing processes are in control & ready to start LRIP. PRR/Milestone C.

73
New cards

Functional Baseline (FBL)

What the system must do. Top-level performance, operational capabilities & system-level requirements. (The Wishlist)

74
New cards

Allocated Baseline (ABL)

How the system is split up. Distributes (allocates) the top-level requirements down to specific subsystems or components. (The Blueprint)

75
New cards

Product Baseline (PBL)

Exactly how to build it. The complete “as-built” technical data package. (The Spec Sheet & Materials)

76
New cards

Maintenance Baseline (MBL)

How to support & update it once deployed. (Homeowner’s Manual)