Home
Explore
Exams
Login
Get started
Home
Quality
Quality
0.0
(0)
Rate it
Studied by 0 people
Call Kai
Learn
Practice Test
Spaced Repetition
Match
Flashcards
Knowt Play
Card Sorting
1/104
There's no tags or description
Looks like no tags are added yet.
105 Terms
View all (105)
Star these 105
1
New cards
What is quality management?
Coordinated activities used to direct and control an organization with respect to quality.
2
New cards
What is quality planning?
Determining quality objectives and the processes and resources needed to achieve them.
3
New cards
What is quality assurance?
Planned activities that provide confidence that quality requirements will be met.
4
New cards
What is quality control?
Techniques used to monitor processes and verify that quality requirements are being met.
5
New cards
What is the main focus of quality assurance?
Preventing quality problems by ensuring proper processes and systems are in place.
6
New cards
What is the main focus of quality control?
Monitoring process or product performance and identifying quality problems.
7
New cards
What does TQM stand for?
Total Quality Management.
8
New cards
What is Total Quality Management?
An organization-wide approach emphasizing customer satisfaction and continuous improvement.
9
New cards
What is the primary goal of TQM?
Long-term customer satisfaction through continuous improvement.
10
New cards
Who participates in TQM?
Employees throughout the entire organization.
11
New cards
What role does the customer have in TQM?
Customer needs and satisfaction are central to defining quality.
12
New cards
What does continuous improvement mean in TQM?
Processes and products are continually evaluated and improved.
13
New cards
What type of decision making is emphasized by TQM?
Fact-based decision making using data and performance information.
14
New cards
What did Deming emphasize about quality?
Quality should be built into processes rather than achieved through final inspection.
15
New cards
What does Six Sigma primarily seek to improve?
Process quality by reducing defects and variation.
16
New cards
Is a higher or lower sigma quality level better?
Higher; it represents fewer defects and better process performance.
17
New cards
What does DMAIC stand for?
Define, Measure, Analyze, Improve, and Control.
18
New cards
What is the Define stage of DMAIC?
Identify the problem, customer requirements, and improvement goals.
19
New cards
What is the Measure stage of DMAIC?
Determine current process performance using data.
20
New cards
What is the Analyze stage of DMAIC?
Identify the root causes of defects or poor performance.
21
New cards
What is the Improve stage of DMAIC?
Develop and implement solutions to address root causes.
22
New cards
What is the Control stage of DMAIC?
Maintain improvements and prevent the process from returning to previous performance.
23
New cards
What does QFD stand for?
Quality Function Deployment.
24
New cards
What is the primary purpose of QFD?
Translate customer needs into technical or engineering requirements.
25
New cards
What is the starting point of QFD?
The voice of the customer.
26
New cards
What is the voice of the customer?
The needs, wants, expectations, and requirements of customers.
27
New cards
What is the House of Quality?
A relationship matrix connecting customer requirements to product or engineering characteristics.
28
New cards
What quality method uses the House of Quality?
Quality Function Deployment (QFD).
29
New cards
What are the WHATs in the House of Quality?
The customer's needs and requirements.
30
New cards
What are the HOWs in the House of Quality?
The technical or engineering characteristics used to satisfy customer needs.
31
New cards
What does the roof of the House of Quality evaluate?
Relationships and correlations among technical requirements.
32
New cards
What can the House of Quality reveal about technical requirements?
Whether requirements support or conflict with one another.
33
New cards
What is the purpose of a competitive assessment in the House of Quality?
Compare the product or service with competitors from a customer perspective.
34
New cards
What is an Ishikawa diagram?
Another name for a fishbone or cause-and-effect diagram.
35
New cards
What is the primary purpose of a fishbone diagram?
Identify and organize possible causes of a problem.
36
New cards
Where is the problem or effect placed on a fishbone diagram?
At the head of the fish.
37
New cards
What are the traditional 4 Ms of a manufacturing fishbone diagram?
Manpower, Machines, Methods, and Materials.
38
New cards
What two categories may be added to create the 6 Ms?
Measurement and Environment.
39
New cards
What quality tool is used to brainstorm possible causes of a defect?
Fishbone or cause-and-effect diagram.
40
New cards
What is the Taguchi view of quality?
Any deviation from the target creates quality loss.
41
New cards
Does Taguchi consider a product within specifications to have zero quality loss?
No. Deviation from the target still creates loss.
42
New cards
What happens to Taguchi quality loss as performance moves farther from the target?
Quality loss increases.
43
New cards
What is the central idea behind the Taguchi loss function?
Quality should focus on closeness to the target rather than merely meeting specification limits.
44
New cards
What does robust quality mean in Taguchi's philosophy?
Performance remains consistent despite sources of variation or noise.
45
New cards
What is statistical process control (SPC)?
The use of statistical methods to monitor and control process performance.
46
New cards
What is the primary purpose of a control chart?
Determine whether a process is stable and under statistical control.
47
New cards
What are control charts designed to distinguish?
Common-cause variation from special-cause variation.
48
New cards
What is common-cause variation?
Natural random variation inherent in a process.
49
New cards
What is special-cause variation?
Variation caused by a specific identifiable source or event.
50
New cards
What should be done when special-cause variation is detected?
Investigate and eliminate or control the identifiable cause.
51
New cards
What do control limits represent?
The expected range of variation based on actual process behavior.
52
New cards
What do specification limits represent?
Acceptable product requirements established by customers or design.
53
New cards
What is the difference between control limits and specification limits?
Control limits come from process behavior; specification limits come from requirements.
54
New cards
Can a process be in statistical control but still fail specifications?
Yes. Stability does not necessarily mean the process is capable.
55
New cards
What does an X-bar control chart monitor?
The process average or mean.
56
New cards
What does an R chart monitor?
Process variability using subgroup ranges.
57
New cards
What type of data are X-bar and R charts used for?
Measured or variable data.
58
New cards
What does a p chart monitor?
The proportion or fraction of units that are defective.
59
New cards
What does an np chart monitor?
The number of defective units.
60
New cards
What does a c chart monitor?
The number of defects or nonconformities.
61
New cards
What does a u chart monitor?
The number of defects per unit.
62
New cards
What is the difference between a defective unit and a defect?
A defective unit is unacceptable; one unit can contain multiple defects.
63
New cards
What is stratification on a control chart?
A pattern in which observations cluster unusually close to the centerline.
64
New cards
What control-chart pattern is the opposite of stratification?
A mixture pattern.
65
New cards
What is a mixture pattern on a control chart?
Points occur away from the centerline with relatively few points near the center.
66
New cards
What does process capability evaluate?
Whether a stable process can consistently meet specification requirements.
67
New cards
What does Cp measure?
Potential process capability based on process spread; it does not consider centering.
68
New cards
What does Cp > 1 mean?
The process spread fits within the specification limits; the process is potentially capable.
69
New cards
What does Cp = 1 mean?
The process spread exactly matches the specification width; it just fits.
70
New cards
What does Cp < 1 mean?
The process spread is wider than the specification limits; the process is not capable.
71
New cards
Is a larger or smaller Cp better?
Larger; process variation is smaller relative to the allowable specification range.
72
New cards
What important factor does Cp not account for?
Whether the process is centered within the specification limits.
73
New cards
What does Cpk measure?
Actual process capability considering both process spread and process centering.
74
New cards
What does Cpk > 1 mean?
The process is capable while accounting for its actual centering.
75
New cards
What does Cpk = 1 mean?
The process just meets the capability threshold at its nearest specification limit.
76
New cards
What does Cpk < 1 mean?
The process is not adequately capable on at least one side of the specifications.
77
New cards
What does Cp = Cpk mean?
The process is centered between the upper and lower specification limits.
78
New cards
What does Cp > Cpk mean?
The process is off-center; its mean is shifted toward one specification limit.
79
New cards
Can Cpk normally be greater than Cp?
No. Cpk is less than or equal to Cp.
80
New cards
What does a high Cp but much lower Cpk indicate?
The process has potentially acceptable variation but is poorly centered.
81
New cards
If Cp is high but Cpk is low, what needs improvement?
Process centering; the process mean should be moved closer to the target.
82
New cards
What is an easy way to remember Cp versus Cpk?
Cp = Potential capability; Cpk = capability that Keeps track of centering.
83
New cards
What is acceptance sampling?
Using a sample from a lot to decide whether to accept or reject the entire lot.
84
New cards
What is a single sampling plan?
One sample is inspected and used to make an accept-or-reject decision.
85
New cards
What is a double sampling plan?
A second sample may be taken when the first sample does not provide a clear decision.
86
New cards
What is a multiple sampling plan?
Successive samples are inspected until an accept-or-reject decision can be made.
87
New cards
What is producer's risk?
The risk of rejecting a lot that is actually of acceptable quality.
88
New cards
What type of error is producer's risk?
Type I error.
89
New cards
What is consumer's risk?
The risk of accepting a lot that is actually of unacceptable quality.
90
New cards
What type of error is consumer's risk?
Type II error.
91
New cards
What does an operating characteristic (OC) curve show?
The probability of accepting a lot at different levels of lot quality.
92
New cards
As the defective rate increases, what happens on an OC curve?
The probability of accepting the lot decreases.
93
New cards
What does DOE stand for?
Design of Experiments.
94
New cards
What is the purpose of DOE?
Systematically determine how input factors affect an output or response.
95
New cards
What is a factor in DOE?
An input variable that is intentionally investigated.
96
New cards
What is a level in DOE?
A particular setting or value of a factor.
97
New cards
What is a response in DOE?
The output or performance measure observed during the experiment.
98
New cards
What is a main effect in DOE?
The effect that one factor has on the response.
99
New cards
What is an interaction effect in DOE?
The effect of one factor depends on the level of another factor.
100
New cards
What is the purpose of screening in DOE?
Identify which factors have important effects on the response.
Load more