Government Schemes Master Lecture - Lesson 1

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/64

flashcard set

Earn XP

Description and Tags

Comprehensive vocabulary flashcards covering major central government welfare, renewable energy, rural development, and urban housing schemes, with strict verbatim adherence and exact quantitative thresholds.

65 Terms

1
New cards

PM-KUSUM: Component A

A sub-component supporting the setup of decentralised, grid-connected renewable energy power plants with capacities ranging from 500 kW500\text{ kW} to 2 MW2\text{ MW} on barren, fallow, or agricultural land by individual farmers, cooperatives, panchayats, FPOs, or Water User Associations.

2
New cards

PM-KUSUM: Component B

A sub-component providing financial assistance for installing 14 lakh14\text{ lakh} standalone solar agriculture pumps in off-grid areas, offering 30%30\% Central Financial Assistance (50%50\% in North-Eastern, Himalayan, and Island regions) to replace diesel pumps.

3
New cards

PM-KUSUM: Component C

A sub-component targeting the solarisation of 35 lakh35\text{ lakh} existing grid-connected agriculture pumps through both individual pump solarisation and feeder-level solarisation, enabling farmers to irrigate and sell surplus power to DISCOMs.

4
New cards

PM-KUSUM: DISCOM Procurement-Based Incentive

An incentive paid to DISCOMs purchasing power under Component A of PM-KUSUM, amounting to Rs. 0.40 per unit\text{Rs. } 0.40\text{ per unit} or Rs. 6.6 lakh per MW per year\text{Rs. } 6.6\text{ lakh per MW per year}, whichever is lower, available for 5 years5\text{ years} from the Commercial Operation Date.

5
New cards

Green Energy Corridors (GEC)

A transmission infrastructure scheme launched in 20152015 to evacuate solar and wind energy from renewable-rich areas and integrate non-fossil fuel electricity smoothly into the national grid.

6
New cards

GEC Phase-II Inter-State Transmission System for Ladakh

An inter-state transmission project implemented by POWERGRID at an estimated cost of approximately Rs. 20,773.70 crore\text{Rs. } 20,773.70\text{ crore} (40%40\% Central Financial Assistance) to evacuate 13 GW13\text{ GW} of renewable energy from Ladakh by FY 2029–302029\text{–}30.

7
New cards

PM Surya Ghar: Muft Bijli Yojana

A Central Sector Scheme launched in 20242024 with a total outlay of Rs. 75,021 crore\text{Rs. } 75,021\text{ crore} that targets installing rooftop solar systems in 1 crore1\text{ crore} residential households by March 20272027 to deliver up to 300 units300\text{ units} of free electricity per month.

8
New cards

PM Surya Ghar: Central Financial Assistance Structure

The subsidy schedule providing Rs. 30,000\text{Rs. } 30,000 for a 1 kW1\text{ kW} system, Rs. 60,000\text{Rs. } 60,000 for a 2 kW2\text{ kW} system (60%60\% of system cost), and Rs. 78,000\text{Rs. } 78,000 for systems of 3 kW3\text{ kW} or higher (40%40\% for additional capacity between 2 kW2\text{ kW} and 3 kW3\text{ kW}, capped at 3 kW3\text{ kW}).

9
New cards

Model Solar Village (PM Surya Ghar)

A village-level demonstration initiative in every district receiving Central Financial Assistance of Rs. 1 crore\text{Rs. } 1\text{ crore}, requiring a population above 5,0005,000 (or above 2,0002,000 in special category States) to promote community rooftop solar adoption.

10
New cards

PLI Scheme for High Efficiency Solar PV Modules

A Central Sector Scheme with an outlay of Rs. 24,000 crore\text{Rs. } 24,000\text{ crore} (Rs. 4,500 crore\text{Rs. } 4,500\text{ crore} for Tranche I and Rs. 19,500 crore\text{Rs. } 19,500\text{ crore} for Tranche II) that incentivises domestic manufacturing of high-efficiency solar modules and integrated supply chains for 5 years5\text{ years} post-commissioning.

11
New cards

Green Hydrogen (National Definition)

Hydrogen produced from renewable sources having well-to-gate emissions not exceeding 2 kg CO2 equivalent per kg of hydrogen2\text{ kg CO}_2\text{ equivalent per kg of hydrogen} averaged over a 12-month12\text{-month} period, encompassing both electrolysis-based and biomass-based production pathways.

12
New cards

SIGHT Programme

The Strategic Interventions for Green Hydrogen Transition programme under the National Green Hydrogen Mission, allocated Rs. 17,490 crore\text{Rs. } 17,490\text{ crore} to provide financial incentives for domestic electrolyser manufacturing and Green Hydrogen production.

13
New cards

National Bioenergy Programme

A Central Sector umbrella programme implemented across three sub-schemes—Waste to Energy Programme, Biomass Programme, and Biogas Programme—to generate clean energy, BioCNG, and power from organic and agricultural waste.

14
New cards

PM Shram Yogi Maandhan (PM-SYM) Yojana

A voluntary and contributory pension scheme for unorganised workers aged 18 to 40 years18\text{ to } 40\text{ years} with monthly incomes up to Rs. 15,000\text{Rs. } 15,000, providing a minimum assured monthly pension of Rs. 3,000\text{Rs. } 3,000 upon reaching age 6060.

15
New cards

PM-SYM Contribution Rule

A 50:50 matching contribution structure between the unorganised worker and the Central Government, with monthly subscriber amounts varying by entry age from Rs. 55\text{Rs. } 55 at age 1818 to Rs. 200\text{Rs. } 200 at age 4040.

16
New cards

Atal Beemit Vyakti Kalyan Yojana (ABVKY)

An unemployment cash relief scheme administered by ESIC for insured persons facing involuntary job loss, providing 50%50\% of average daily wages for a maximum of 90 days90\text{ days} after a waiting period of 30 days30\text{ days}, usable once in a lifetime.

17
New cards

Model Career Centres (NCS)

Physical institutional centres established under the National Career Service Project that provide offline assisted services including job fairs, career counselling, employer mobilisation, and employability skills training.

18
New cards

Scheme for Rehabilitation of Bonded Labourers (2021)

A Central Sector Scheme under the Ministry of Labour and Employment that provides financial rehabilitation of Rs. 1 lakh\text{Rs. } 1\text{ lakh} for adult males, Rs. 2 lakh\text{Rs. } 2\text{ lakh} for special category beneficiaries (women and children), and Rs. 3 lakh\text{Rs. } 3\text{ lakh} for extreme cases like trafficking, along with up to Rs. 30,000\text{Rs. } 30,000 immediate relief.

19
New cards

Bonded Labour Rehabilitation Fund

A permanent district-level fund of at least Rs. 10 lakh\text{Rs. } 10\text{ lakh} placed at the disposal of the District Magistrate in every State and Union Territory for urgent rescue, immediate relief, and basic rehabilitation needs of rescued bonded labourers.

20
New cards

Rajiv Gandhi Shramik Kalyan Yojana (RGSKY)

An ESIC unemployment allowance scheme providing financial support for workers unemployed due to retrenchment, factory closure, or at least 40%40\% non-employment invalidity, paying 50%50\% of wages for the first 12 months12\text{ months} and 25%25\% for the next 12 months12\text{ months} (up to 24 months24\text{ months} total).

21
New cards

PM Awas Yojana – Grameen (PMAY-G)

A Centrally Sponsored Scheme aimed at providing pucca houses with basic civic amenities to rural households identified via SECC 20112011 deprivation parameters and verified by the Gram Sabha.

22
New cards

PMAY-G Financial Assistance

Unit house assistance of Rs. 1.20 lakh\text{Rs. } 1.20\text{ lakh} in plain areas and Rs. 1.30 lakh\text{Rs. } 1.30\text{ lakh} in hilly, difficult, and LWE-affected areas, supplemented by Rs. 12,000\text{Rs. } 12,000 for toilets under SBM-G and 90 to 95 person-days90\text{ to } 95\text{ person-days} of unskilled manual labour under MGNREGS.

23
New cards

Unconnected Habitation (PMGSY)

A rural habitation located at least 500 metres500\text{ metres} away from an all-weather road or connected settlement in plain areas, or at least 1.5 km1.5\text{ km} path distance away in hilly regions.

24
New cards

PMGSY-III

A vertical of the Pradhan Mantri Gram Sadak Yojana focused on the consolidation and upgradation of 1,25,000 km1,25,000\text{ km} of existing Through Routes and Major Rural Links connecting habitations to Gramin Agricultural Markets, schools, and hospitals.

25
New cards

PMGSY-IV

A phase approved in 20242024 with an outlay of Rs. 70,125 crore\text{Rs. } 70,125\text{ crore} (Central share Rs. 49,087.50 crore\text{Rs. } 49,087.50\text{ crore}) to construct 62,500 km62,500\text{ km} of rural roads and bridges to connect 25,00025,000 previously unconnected habitations between FY 2024-252024\text{-}25 and FY 2028-292028\text{-}29.

26
New cards

eMARG (PMGSY)

An enterprise mobile application and web-based monitoring system dedicated to overseeing routine and periodic maintenance of PMGSY roads for 5 years5\text{ years} following completion.

27
New cards

Panchasutras of SHGs

The five foundational principles governing Self-Help Groups under DAY-NRLM: regular meetings, regular savings, regular internal lending, regular recoveries, and proper maintenance of books of accounts.

28
New cards

Participatory Identification of Poor (PIP)

A community-led process under DAY-NRLM wherein community-based organisations identify vulnerable and poor households, followed by vetting in the Gram Sabha and final approval by the Gram Panchayat.

29
New cards

One GP One B C Sakhi Mission

A DAY-NRLM financial inclusion initiative that trains and deploys certified women SHG members as Business Correspondents to provide doorstep banking and payment services in every Gram Panchayat.

30
New cards

DDU – Grameen Kaushalya Yojana (DDU-GKY)

A demand-driven, placement-linked rural skill training scheme under DAY-NRLM for rural youth aged 15 to 35 years15\text{ to } 35\text{ years} (up to 45 years45\text{ years} for women, PVTGs, PwDs, and special groups) mandating at least 70%70\% wage-employment placement.

31
New cards

Saansad Aadarsh Gram Yojana (SAGY)

A village development scheme launched in 20142014 under which Members of Parliament adopt Gram Panchayats with populations of 3,000–5,0003,000\text{–}5,000 in plains or 1,000–3,0001,000\text{–}3,000 in hilly/tribal areas to develop them through convergence of existing programs without a dedicated independent budget.

32
New cards

Rurban Cluster

A group of geographically contiguous villages with growth potential having a population of 25,000 to 50,00025,000\text{ to } 50,000 in plain and coastal areas, or 5,000 to 15,0005,000\text{ to } 15,000 in desert, hilly, and tribal areas under the Shyama Prasad Mukherjee Rurban Mission.

33
New cards

Critical Gap Funding (SPMRM)

A supplemental funding mechanism under SPMRM capped at 30%30\% of project cost or Rs. 30 crore\text{Rs. } 30\text{ crore} (plain/coastal clusters) and 30%30\% or Rs. 15 crore\text{Rs. } 15\text{ crore} (desert/hilly/tribal clusters), whichever is lower, to bridge capital deficits in village clusters.

34
New cards

Aajeevika Grameen Express Yojana (AGEY)

A sub-scheme under DAY-NRLM launched in 20172017 providing interest-free loans from Community Investment Funds to SHG members to buy and operate public transport vehicles on remote rural routes.

35
New cards

National Family Benefit Scheme (NFBS)

A component of the National Social Assistance Program providing lump-sum financial assistance to a Below Poverty Line household upon the demise of a primary breadwinner aged between 1818 and 60 years60\text{ years}.

36
New cards

Mahila Kisan Sashaktikaran Pariyojana (MKSP)

A specialised sub-component of DAY-NRLM launched in 20112011 to recognise and empower women farmers by promoting sustainable agro-ecological practices, NTFP collection, and women-led livestock extension through Pashu and Krishi Sakhis.

37
New cards

Unique Land Parcel Identification Number (ULPIN)

A 14-digit alphanumeric identification code (also called Bhu-Aadhaar) generated using geo-coordinates under DILRMP to identify individual land parcels and prevent duplicate or fraudulent transactions.

38
New cards

National Generic Document Registration System (NGDRS)

A unified, configurable web-based software known as 'One Nation, One Registration Software' under DILRMP that provides online document entry, property valuation, appointment booking, and paperless registration.

39
New cards

NAKSHA Programme

National Geospatial Knowledge-based Land Survey of Urban Habitations, a pilot initiative under DILRMP using aerial surveys, high-resolution imagery, GIS, and ground verification to build accurate urban land records.

40
New cards

Bhoomi Samman Platinum Grading

A national recognition awarded to districts achieving saturation of 99%99\% or more across six core digital governance components under the Digital India Land Records Modernization Programme.

41
New cards

Mission Amrit Sarovar

A convergence mission launched in 20222022 under Azadi Ka Amrit Mahotsav aiming to construct or rejuvenate at least 7575 water bodies per rural district (50,00050,000 nationally), each having a minimum pondage area of 1 acre1\text{ acre} (0.4 hectare0.4\text{ hectare}) and 10,000 cubic metres10,000\text{ cubic metres} water-holding capacity.

42
New cards

REWARD Program

Rejuvenating Watersheds for Agricultural Resilience through Innovative Development, a USD 167.71 million167.71\text{ million} initiative (USD 115 million\text{USD } 115\text{ million} World Bank loan) implemented in Karnataka and Odisha to modernise rainfed agriculture via scientific watershed management.

43
New cards

Land Resource Inventory (LRI)

A science-based spatial mapping approach under the REWARD program providing micro-level data on soil characteristics, land capability, water availability, and crop suitability to formulate customised farm-level watershed interventions.

44
New cards

Namo Drone Didi Scheme

A Central Sector Scheme under the Ministry of Agriculture & Farmers Welfare targeting the supply of 15,00015,000 agricultural drones to Women SHGs under DAY-NRLM, providing Central Financial Assistance of 80%80\% (up to Rs. 8 lakh\text{Rs. } 8\text{ lakh} per SHG).

45
New cards

Viksit Bharat - Guarantee for Rozgar and Ajeevika Mission (Gramin)

A reformed rural statutory employment guarantee framework (VB-G RAM G) launched in 20252025 providing 125 days125\text{ days} of demand-driven unskilled wage employment per rural household per financial year, replacing the earlier MGNREGA model.

46
New cards

Agriculture-Labour Balance Pause (VB-G RAM G)

A structured pause of up to 60 days60\text{ days} during peak sowing and harvesting seasons designed to prevent rural farm labour shortages while fulfilling the statutory 125-day125\text{-day} guarantee within the remaining working period.

47
New cards

Pradhan Mantri Awas Yojana – Urban 2.0 (PMAY-U 2.0)

The second phase of the urban housing mission effective from 1 September 20241\text{ September } 2024 for 5 years5\text{ years}, with an investment of Rs. 10 lakh crore\text{Rs. } 10\text{ lakh crore} targeting 1 crore1\text{ crore} additional urban EWS, LIG, and MIG families.

48
New cards

Interest Subsidy Scheme (PMAY-U 2.0)

A Central Sector vertical offering a 4%4\% interest subsidy on the first Rs. 8 lakh\text{Rs. } 8\text{ lakh} of home loans up to Rs. 25 lakh\text{Rs. } 25\text{ lakh} (for properties valued up to Rs. 35 lakh\text{Rs. } 35\text{ lakh}), providing a maximum actual benefit of Rs. 1.80 lakh\text{Rs. } 1.80\text{ lakh} released across 5 annual instalments5\text{ annual instalments}.

49
New cards

AMRUT 2.0

A Centrally Sponsored Scheme launched in 20212021 with an indicative outlay of Rs. 2,77,000 crore\text{Rs. } 2,77,000\text{ crore} aimed at achieving universal tap-water coverage in all statutory towns and universal sewerage/septage management across 500 AMRUT cities500\text{ AMRUT cities}.

50
New cards

Non-Revenue Water (NRW)

Treated potable municipal water that is lost before reaching consumers due to physical leaks, unauthorized connections, meter errors, or billing inaccuracies, which AMRUT 2.0 mandates reducing to below 20%20\%.

51
New cards

Pey Jal Survekshan

A performance assessment and ranking survey under AMRUT 2.0 measuring urban service benchmarks including tap-water access, water quantity, drinking water quality, septage management, treated water reuse, and consumer satisfaction.

52
New cards

AMRUT Mitra

A women-led governance initiative under AMRUT 2.0 that actively involves Women Self-Help Groups in water quality testing, demand management, operational monitoring, and community billing across urban local bodies.

53
New cards

PM SVANidhi Loan Tranche Structure

A collateral-free working-capital credit system for street vendors featuring progressive tranches of up to Rs. 15,000\text{Rs. } 15,000 (first), Rs. 25,000\text{Rs. } 25,000 (second upon repayment), and Rs. 50,000\text{Rs. } 50,000 (third), supported by a 7%7\% annual interest subsidy.

54
New cards

SVANidhi se Samriddhi

A socio-economic profiling initiative that links PM SVANidhi beneficiaries and their family members with eight core national welfare programs, including PMJJBY, PMSBY, PM-SYM, and One Nation One Ration Card.

55
New cards

Dumpsite Remediation Accelerator Programme (DRAP)

A targeted intervention under SBM-U 2.0 launched in November 20252025 focusing on 214 priority legacy dumpsites214\text{ priority legacy dumpsites} containing 80%80\% of remaining legacy waste to reach 'Lakshya Zero Dumpsites' by September 20262026 at an assistance baseline of approximately Rs. 550 per tonne\text{Rs. } 550\text{ per tonne}.

56
New cards

Water+ Certification (SBM-U)

The highest urban sanitation certification protocol under Swachh Bharat Mission-Urban verifying that all municipal wastewater and faecal sludge is collected, treated, and safely recycled or reused prior to discharge.

57
New cards

NAMASTE Scheme

National Action for Mechanised Sanitation Ecosystem, an initiative of MoSJE and MoHUA to eliminate hazardous manual cleaning of sewers and septic tanks, ensure zero fatalities, and mechanise all sanitation work across all urban local bodies.

58
New cards

Swachhata Udyami Yojana (Enhanced Subsidy)

The concessional financing vertical of NAMASTE providing upfront capital subsidies of 50%50\% up to Rs. 7.50 lakh\text{Rs. } 7.50\text{ lakh} for individual sanitation projects, up to Rs. 25 lakh\text{Rs. } 25\text{ lakh} for group projects of five workers, and 25%25\% for Private Sanitation Service Organisations.

59
New cards

Emergency Response Sanitation Units (ERSUs)

Specialised institutional response units set up in large municipal corporations and districts under NAMASTE to manage hazardous sanitation operations through trained personnel, mechanised gear, gas detection, and emergency extraction equipment.

60
New cards

CITIIS 2.0

An externally aided urban climate-action programme spanning 2023 to 20272023\text{ to } 2027 with EUR 212 million212\text{ million} funding from AFD, KfW, and the EU, supporting circular economy and integrated solid waste management across 18 selected Smart Cities18\text{ selected Smart Cities}.

61
New cards

Gross Cost Contract (GCC) Model

The operational framework used under PM-eBus Sewa where private operators procure, operate, and maintain electric buses while the Public Transport Authority collects fares and reimburses operators on a specified per-kilometre operational fee basis.

62
New cards

PM-eBus Sewa Operational Assistance

Direct per-kilometre Central financial support for electric bus operations under Segment A, paying Rs. 24 per km\text{Rs. } 24\text{ per km} for standard 12-metre12\text{-metre} buses, Rs. 22 per km\text{Rs. } 22\text{ per km} for midi 9-metre9\text{-metre} buses, and Rs. 20 per km\text{Rs. } 20\text{ per km} for mini 7-metre7\text{-metre} buses for up to 10 years10\text{ years} or up to March 20372037.

63
New cards

PM-eBus Sewa – Payment Security Mechanism

A Rs. 3,435.33 crore\text{Rs. } 3,435.33\text{ crore} dedicated risk-mitigation framework managed by CESL under the Ministry of Heavy Industries that protects e-bus operators against defaults by Public Transport Authorities by ensuring payment reimbursement within 90 days90\text{ days}.

64
New cards

Urban Infrastructure Development Fund (UIDF)

A revolving loan fund managed by the National Housing Bank with an initial corpus of Rs. 10,000 crore\text{Rs. } 10,000\text{ crore} drawn from Priority Sector Lending shortfalls, providing concessional credit to Tier-2 and Tier-3 cities for core municipal infrastructure.

65
New cards

UIDF Concessional Interest Rate

The lending rate charged on UIDF loans to State governments and urban local bodies, pegged at the prevailing Bank Rate minus 1.5%1.5\% percentage points, repayable over 7 years7\text{ years} including a 2-year2\text{-year} moratorium.