A comprehensive vocabulary collection covering Material Requirements Planning (MRP), capacity planning techniques (RCCP and CRP), bills of materials, and production activity control (PAC).
Material Requirements Planning (MRP)
A computer-based priority planning technique that calculates a time-phased schedule of component parts and raw materials needed at each level of assembly based on lead times and the master production schedule.
Independent Demand
Demand for an item that is unrelated to the demand for other assemblies or products, originating from outside sources and typically estimated using forecasting.
Dependent Demand
Demand for component parts, subassemblies, or raw materials that is directly derived from the production schedule of a parent or end item, calculated rather than forecasted.
Action Bucket
The current time period (the first time bucket) in an MRP record where immediate action, such as releasing an order, must be taken by the planner to prevent a future shortage.
Low-Level Coding
A coding convention where each component is assigned a number corresponding to the lowest level at which it appears across all bills of material, ensuring that all gross requirements are fully accumulated before planning the item.
MRP Explosion
The computational process of calculating gross requirements for lower-level components by multiplying the requirements of their parent items by the usage quantities specified in the bill of materials.
Lead Time Offsetting
The procedure of placing planned order releases in an earlier time bucket by subtracting the item lead time from the required planned order receipt date.
Firm Planned Order (FPO)
An order that is planned but not yet released, frozen in quantity and timing by the MRP planner to reduce system nervousness and prevent automated recalculation by the computer.
MRP Exception Messages
System-generated action notices alerting the planner that intervention is required, such as a planned order release in the current period, a scheduled receipt arriving too early or late, or potential missed due dates.
System Nervousness
Instability and frequent rescheduling across dependent inventory levels in an MRP system caused by minor changes to planning factors, lot-sizing rules, or master production schedule quantities.
Scrap Factor Adjustment Formula
The mathematical correction used to adjust order quantities for expected production scrap: Planned Order Release=1−Scrap FactorPlanned Order Receipt.
Bill of Materials (BOM)
A structured engineering document showing all subassemblies, components, and raw materials required to make one unit of a parent item, along with the relationship between parent and components.
Usage Quantity
The number of units of a component part needed to produce exactly one unit of its immediate parent item.

Indented Bill of Material
A multi-level bill of material format that utilizes progressive horizontal indentations to visually depict parent-component relationships and hierarchical assembly levels.

Planning Bill of Material
An artificial grouping of components and historical usage percentages used to simplify forecasting, planning, and master scheduling, representing an average rather than a buildable product.
Part Commonality
The degree to which a specific component part is utilized across more than one immediate parent product or assembly.
Where-Used Report
A report that lists every parent item or assembly in which a given component part is used across the entire product line.
Pegging Report
An inventory tracing record that displays the specific parent items and orders that generated current requirements for a component.
Gross Requirements
The total unadjusted demand for a component in a period before subtracting inventory or scheduled receipts, derived from MPS start quantities, higher-level planned order releases, or service demand.
Scheduled Receipts
Open, already released shop orders or purchasing orders that are scheduled to be received into inventory at the beginning of a specified time period.
Projected Available
The expected on-hand inventory balance remaining at the end of a given time period after satisfying all gross requirements and incorporating receipts.
Planned Order Release (POR)
The planned order quantity scheduled to be launched in a specific time bucket so that it arrives as a planned order receipt after the required lead time.
Fixed Order Quantity (FOQ)
A lot-sizing rule specifying that replenishment orders must always be placed in a predetermined, fixed batch size (Q) whenever inventory falls below requirements.
Periodic Order Quantity (POQ)
A lot-sizing technique where the order quantity covers the exact cumulative net requirements for a specified number of future periods (P).
Lot-for-Lot (LFL)
A lot-sizing policy where the planned order receipt matches exactly the net requirements for a single time period (P=1), resulting in zero carryover inventory.
Capacity
The rate of doing work in a specified time period, representing the amount of work that can be accomplished rather than the total quantity of output produced.
Capacity Requirements Planning (CRP)
A detailed, time-phased capacity planning process that converts planned order releases and open shop orders from MRP into labor and machine hour loads at specific work centers.
Rough-Cut Capacity Planning (RCCP)
A medium-range capacity planning check performed at the Master Production Schedule level to test feasibility before generating detailed MRP plans.
Capacity Planning using Overall Factors (CPOF)
A rough-cut capacity planning method that multiplies MPS quantities by overall historical labor or machine hours and splits the total among work centers using historical percentages.
Capacity Bill
An RCCP technique that calculates work center capacity requirements by multiplying MPS quantities by direct labor or machine hours per operation extracted from BOMs and routings.
Resource Profile
An RCCP technique that combines capacity bill routing data with production lead time information to project time-phased capacity requirements across specific time periods.
Routing
A manufacturing document that specifies the operational path of an item through a plant, including operation sequence, work centers used, tooling, setup times, and per-unit run times.
Demonstrated Capacity
A measure of historical capacity determined by calculating the average actual production output achieved by a work center over past time periods.
Rated Capacity
The calculated expected output of a work center based on parameters using the formula: Rated Capacity=Available Time×Utilization×Efficiency.
Utilization
The proportion of total available time that a work center is actively working, calculated as: Utilization=Available HoursHours Actually Worked.
Efficiency
A measure of worker or machine performance relative to standard, calculated as: Efficiency=Hours Actually WorkedStandard Hours of Work Produced.
Work Center Load
The total amount of released and planned work (measured in standard hours) assigned to a specific work center for a particular time period.
Production Activity Control (PAC)
The shop floor execution system that plans start and finish dates, releases work orders, dispatches jobs, and controls work in process through feedback and priority adjustments.
Forward Scheduling
A scheduling methodology where operations are planned forward in time starting from the release date to calculate the earliest possible completion date.
Backward Scheduling
A scheduling methodology where operations are planned backward from the order due date to determine the latest allowable start date for each operation.
Infinite Loading
A shop-floor scheduling approach that assigns work to work centers based on due dates without regard to actual capacity limitations.
Finite Loading
A scheduling approach that allocates work up to the maximum capacity limit of a work center, delaying or rescheduling jobs that exceed available hours.
Operation Overlapping
A scheduling method where a batch of parts is split into smaller transfer batches to move to the next operation before the entire batch finishes processing on the preceding machine.
Operation Splitting
A scheduling technique that divides an order into two or more portions to run simultaneously on multiple machines, requiring multiple setups to reduce total order lead time.
Theory of Constraints (TOC)
A management philosophy centered on the premise that system throughput is dictated entirely by its bottlenecks or constraints, requiring focused management and buffer protection.
Bottleneck
A work center, machine, or resource whose available capacity is equal to or less than the demand placed upon it, limiting the output of the entire production process.
Drum-Buffer-Rope (DBR)
The Theory of Constraints scheduling system where the bottleneck sets the pace (drum), inventory buffers protect the bottleneck against disruptions, and material release is controlled (rope).
Input/Output Control (I/O Report)
A PAC monitoring tool that compares planned input and output against actual performance to identify work center variances and track queue growth or backlogs.
Dispatch List
A daily operational priority listing provided to work center supervisors specifying the precise sequence in which open shop orders should be processed.
Critical Ratio (CR)
A priority dispatching rule that indexes jobs based on urgency, calculated as: Critical Ratio=Lead Time RemainingDue Date−Today’s Date.