A comprehensive vocabulary collection covering Material Requirements Planning (MRP), capacity planning techniques (RCCP and CRP), bills of materials, and production activity control (PAC).

50 Terms

1
New cards

Material Requirements Planning (MRP)

A computer-based priority planning technique that calculates a time-phased schedule of component parts and raw materials needed at each level of assembly based on lead times and the master production schedule.

2
New cards

Independent Demand

Demand for an item that is unrelated to the demand for other assemblies or products, originating from outside sources and typically estimated using forecasting.

3
New cards

Dependent Demand

Demand for component parts, subassemblies, or raw materials that is directly derived from the production schedule of a parent or end item, calculated rather than forecasted.

4
New cards

Action Bucket

The current time period (the first time bucket) in an MRP record where immediate action, such as releasing an order, must be taken by the planner to prevent a future shortage.

5
New cards

Low-Level Coding

A coding convention where each component is assigned a number corresponding to the lowest level at which it appears across all bills of material, ensuring that all gross requirements are fully accumulated before planning the item.

6
New cards

MRP Explosion

The computational process of calculating gross requirements for lower-level components by multiplying the requirements of their parent items by the usage quantities specified in the bill of materials.

7
New cards

Lead Time Offsetting

The procedure of placing planned order releases in an earlier time bucket by subtracting the item lead time from the required planned order receipt date.

8
New cards

Firm Planned Order (FPO)

An order that is planned but not yet released, frozen in quantity and timing by the MRP planner to reduce system nervousness and prevent automated recalculation by the computer.

9
New cards

MRP Exception Messages

System-generated action notices alerting the planner that intervention is required, such as a planned order release in the current period, a scheduled receipt arriving too early or late, or potential missed due dates.

10
New cards

System Nervousness

Instability and frequent rescheduling across dependent inventory levels in an MRP system caused by minor changes to planning factors, lot-sizing rules, or master production schedule quantities.

11
New cards

Scrap Factor Adjustment Formula

The mathematical correction used to adjust order quantities for expected production scrap: Planned Order Release=Planned Order Receipt1−Scrap Factor\text{Planned Order Release} = \frac{\text{Planned Order Receipt}}{1 - \text{Scrap Factor}}.

12
New cards

Bill of Materials (BOM)

A structured engineering document showing all subassemblies, components, and raw materials required to make one unit of a parent item, along with the relationship between parent and components.

13
New cards

Usage Quantity

The number of units of a component part needed to produce exactly one unit of its immediate parent item.

14
New cards
<p>Indented Bill of Material</p>

Indented Bill of Material

A multi-level bill of material format that utilizes progressive horizontal indentations to visually depict parent-component relationships and hierarchical assembly levels.

15
New cards
<p>Planning Bill of Material</p>

Planning Bill of Material

An artificial grouping of components and historical usage percentages used to simplify forecasting, planning, and master scheduling, representing an average rather than a buildable product.

16
New cards

Part Commonality

The degree to which a specific component part is utilized across more than one immediate parent product or assembly.

17
New cards

Where-Used Report

A report that lists every parent item or assembly in which a given component part is used across the entire product line.

18
New cards

Pegging Report

An inventory tracing record that displays the specific parent items and orders that generated current requirements for a component.

19
New cards

Gross Requirements

The total unadjusted demand for a component in a period before subtracting inventory or scheduled receipts, derived from MPS start quantities, higher-level planned order releases, or service demand.

20
New cards

Scheduled Receipts

Open, already released shop orders or purchasing orders that are scheduled to be received into inventory at the beginning of a specified time period.

21
New cards

Projected Available

The expected on-hand inventory balance remaining at the end of a given time period after satisfying all gross requirements and incorporating receipts.

22
New cards

Planned Order Release (POR)

The planned order quantity scheduled to be launched in a specific time bucket so that it arrives as a planned order receipt after the required lead time.

23
New cards

Fixed Order Quantity (FOQ)

A lot-sizing rule specifying that replenishment orders must always be placed in a predetermined, fixed batch size (QQ) whenever inventory falls below requirements.

24
New cards

Periodic Order Quantity (POQ)

A lot-sizing technique where the order quantity covers the exact cumulative net requirements for a specified number of future periods (PP).

25
New cards

Lot-for-Lot (LFL)

A lot-sizing policy where the planned order receipt matches exactly the net requirements for a single time period (P=1P = 1), resulting in zero carryover inventory.

26
New cards

Capacity

The rate of doing work in a specified time period, representing the amount of work that can be accomplished rather than the total quantity of output produced.

27
New cards

Capacity Requirements Planning (CRP)

A detailed, time-phased capacity planning process that converts planned order releases and open shop orders from MRP into labor and machine hour loads at specific work centers.

28
New cards

Rough-Cut Capacity Planning (RCCP)

A medium-range capacity planning check performed at the Master Production Schedule level to test feasibility before generating detailed MRP plans.

29
New cards

Capacity Planning using Overall Factors (CPOF)

A rough-cut capacity planning method that multiplies MPS quantities by overall historical labor or machine hours and splits the total among work centers using historical percentages.

30
New cards

Capacity Bill

An RCCP technique that calculates work center capacity requirements by multiplying MPS quantities by direct labor or machine hours per operation extracted from BOMs and routings.

31
New cards

Resource Profile

An RCCP technique that combines capacity bill routing data with production lead time information to project time-phased capacity requirements across specific time periods.

32
New cards

Routing

A manufacturing document that specifies the operational path of an item through a plant, including operation sequence, work centers used, tooling, setup times, and per-unit run times.

33
New cards

Demonstrated Capacity

A measure of historical capacity determined by calculating the average actual production output achieved by a work center over past time periods.

34
New cards

Rated Capacity

The calculated expected output of a work center based on parameters using the formula: Rated Capacity=Available Time×Utilization×Efficiency\text{Rated Capacity} = \text{Available Time} \times \text{Utilization} \times \text{Efficiency}.

35
New cards

Utilization

The proportion of total available time that a work center is actively working, calculated as: Utilization=Hours Actually WorkedAvailable Hours\text{Utilization} = \frac{\text{Hours Actually Worked}}{\text{Available Hours}}.

36
New cards

Efficiency

A measure of worker or machine performance relative to standard, calculated as: Efficiency=Standard Hours of Work ProducedHours Actually Worked\text{Efficiency} = \frac{\text{Standard Hours of Work Produced}}{\text{Hours Actually Worked}}.

37
New cards

Work Center Load

The total amount of released and planned work (measured in standard hours) assigned to a specific work center for a particular time period.

38
New cards

Production Activity Control (PAC)

The shop floor execution system that plans start and finish dates, releases work orders, dispatches jobs, and controls work in process through feedback and priority adjustments.

39
New cards

Forward Scheduling

A scheduling methodology where operations are planned forward in time starting from the release date to calculate the earliest possible completion date.

40
New cards

Backward Scheduling

A scheduling methodology where operations are planned backward from the order due date to determine the latest allowable start date for each operation.

41
New cards

Infinite Loading

A shop-floor scheduling approach that assigns work to work centers based on due dates without regard to actual capacity limitations.

42
New cards

Finite Loading

A scheduling approach that allocates work up to the maximum capacity limit of a work center, delaying or rescheduling jobs that exceed available hours.

43
New cards

Operation Overlapping

A scheduling method where a batch of parts is split into smaller transfer batches to move to the next operation before the entire batch finishes processing on the preceding machine.

44
New cards

Operation Splitting

A scheduling technique that divides an order into two or more portions to run simultaneously on multiple machines, requiring multiple setups to reduce total order lead time.

45
New cards

Theory of Constraints (TOC)

A management philosophy centered on the premise that system throughput is dictated entirely by its bottlenecks or constraints, requiring focused management and buffer protection.

46
New cards

Bottleneck

A work center, machine, or resource whose available capacity is equal to or less than the demand placed upon it, limiting the output of the entire production process.

47
New cards

Drum-Buffer-Rope (DBR)

The Theory of Constraints scheduling system where the bottleneck sets the pace (drum), inventory buffers protect the bottleneck against disruptions, and material release is controlled (rope).

48
New cards

Input/Output Control (I/O Report)

A PAC monitoring tool that compares planned input and output against actual performance to identify work center variances and track queue growth or backlogs.

49
New cards

Dispatch List

A daily operational priority listing provided to work center supervisors specifying the precise sequence in which open shop orders should be processed.

50
New cards

Critical Ratio (CR)

A priority dispatching rule that indexes jobs based on urgency, calculated as: Critical Ratio=Due Date−Today’s DateLead Time Remaining\text{Critical Ratio} = \frac{\text{Due Date} - \text{Today's Date}}{\text{Lead Time Remaining}}.