PAES 289:2019 Farm to Market Road - Concrete

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/227

encourage image

There's no tags or description

Looks like no tags are added yet.

228 Terms

1
New cards

What does the standard cover?

Design, construction, operation, and maintenance of one-lane and two-lane concrete FMRs.

2
New cards

Maximum ADT covered?

400 vehicles/day or less.

3
New cards

Farm to Market Road

A road connecting agricultural and fisheries production areas, coastal landing points, and postharvest or processing facilities to local roads, national highways, and markets.

4
New cards

Where should FMRs be located?

Within key production areas, marginal lands, or new lands within SAFDZs, CLUPs, and other convergence initiative areas.

5
New cards

What is the main purpose of an FMR?

To improve the movement of agricultural and fisheries products between production areas and markets.

6
New cards

California Bearing Ratio

ratio of test load to an arbitrarily defined standard load, expressed as a percentage.

7
New cards

Equivalent Single Axle Load

conversion of expected axle loads into an equivalent number of 18-kip single-axle loads.

8
New cards

Field Density Test

determines the degree of soil compaction.

9
New cards

What is crossfall?

Transverse slope that allows water to drain from the carriageway.

10
New cards

What is superelevation?

Cross slope provided on horizontal curves to partially counteract centrifugal force.

11
New cards

What is a turnout?

A widened, unobstructed shoulder area where slow-moving vehicles can pull over to allow other vehicles to pass.

12
New cards

What is a weep hole?

An opening in a retaining wall or similar structure that drains water behind or beneath it, reducing hydrostatic pressure.

13
New cards

Meaning of shall?

Indicates a mandatory requirement.

14
New cards

Meaning of should?

Indicates a recommended practice.

15
New cards

Minimum embankment height above flood level?

At least 0.6 m higher than the area's flood level.

16
New cards

Where should roads preferably be constructed?

On elevated portions; avoid swampy, logged-over, and flood-prone areas whenever possible.

17
New cards

What investigations are required before preparing plans?

Traffic analysis, field survey, and geotechnical investigation.

18
New cards

What should determine the road design?

Anticipated traffic volume, design speed, vehicle characteristics, and terrain.

19
New cards

What safety features should be provided?

Traffic signs, side rails, road markings, and other appropriate safety structures.

20
New cards

Level – ADT below 50

50 kph

21
New cards

Level – ADT 50–250

50 kph

22
New cards

Level – ADT 250–400

60 kph

23
New cards

Rolling – ADT below 50

30 kph

24
New cards

Rolling – ADT 50–250

50 kph

25
New cards

Rolling – ADT 250–400

50 kph

26
New cards

Mountainous – all ADT categories

30 kph

27
New cards

Recommended minimum horizontal curve radius?

30 m.

28
New cards

Minimum radius when superelevation is provided at 30 kph?

May be reduced, but should not be less than 25 m.

29
New cards

Maximum grade for level terrain?

8% at 30 kph; 7% at 40, 50, and 60 kph.

30
New cards

Maximum grade for rolling terrain?

11% at 30 and 40 kph; 10% at 50 and 60 kph.

31
New cards

Maximum grade for mountainous terrain?

16% at 30 kph; 15% at 40; 14% at 50; 13% at 60 kph.

32
New cards

Minimum grade for paved surfaces?

0.30%, to facilitate drainage on curbed and cut sections.

33
New cards

When are vertical curves required?

When the algebraic difference in grade is greater than 0.5%.

34
New cards

Minimum vertical curve length?

40 m.

35
New cards

Maximum superelevation?

8%.

36
New cards

Maximum shoulder rollover?

8%.

37
New cards

Minimum tangent for superelevation runoff?

30 m.

38
New cards

Minimum widening on sharp curves?

0.60 m.

39
New cards

Critical lengths of upgrades of 3%

500 m

40
New cards

Critical lengths of upgrades of 4%

340 m

41
New cards

Critical lengths of upgrades of 5%

240 m

42
New cards

Critical lengths of upgrades of 6%

200 m

43
New cards

Critical lengths of upgrades of 7%

170 m

44
New cards

Critical lengths of upgrades of 8%

150 m

45
New cards

One-lane minimum pavement width?

2.5 m

46
New cards

One-lane minimum shoulder width?

0.75 m

47
New cards

Two-lane minimum pavement width?

5.0 m

48
New cards

Two-lane minimum shoulder width?

1.5 m

49
New cards

When is a one-lane roadway appropriate?

For light vehicles and ADT below 50.

50
New cards

Turnout width and length?

Approximately 1 m wide × 60 m long.

51
New cards

Minimum distance between consecutive turnouts?

1,000 m.

52
New cards

Minimum shoulder width in constrained mountainous areas?

May be reduced to 0.6 m.

53
New cards

Shoulder material?

At least gravel surfacing.

54
New cards

Shoulder compaction in the reduced-width case?

100% density, certified by an accredited laboratory.

55
New cards

Minimum carriageway crossfall?

1.5%.

56
New cards

Shoulder slope?

3% from the edge of the carriageway.

57
New cards

Normal side slope?

04:01

58
New cards

Maximum side slope?

02:01

59
New cards

Preferred intersection angle?

90° (right angle).

60
New cards

Acceptable intersection angle in special situations?

45°–65°.

61
New cards

Angles strongly discouraged?

Less than 45°.

62
New cards

Maximum approach grade where practical?

2%.

63
New cards

Minimum length of relatively flat approach?

30 m.

64
New cards

Visibility requirement for roadway speed not exceeding 30 kph?

40 m.

65
New cards

Recommended pavement material?

Portland Cement Concrete (PCC).

66
New cards

Pavement thickness design reference?

AASHTO 1993 Guide for Design of Pavement Structures.

67
New cards

Minimum pavement thickness?

200 mm.

68
New cards

Maximum slab length?

4.5 m.

69
New cards

Recommended slab width-to-length ratio?

Should not exceed 1.25.

70
New cards

General joint spacing guide?

In feet, spacing should not greatly exceed twice the slab thickness in inches.

71
New cards

Weak subgrade CBR?

2% or less.

72
New cards

Minimum subbase thickness for weak subgrade?

150 mm.

73
New cards

Normal subgrade subbase thickness?

80 mm.

74
New cards

Very stable subgrade CBR?

15% or more.

75
New cards

Minimum subbase thickness for very stable subgrade?

0 mm (subbase may not be required).

76
New cards

Additional subbase for CBR 4% or less when heavy construction vehicles use it?

Additional 150 mm.

77
New cards

Additional subbase for other normal subgrades under heavy construction traffic?

Additional 80 mm.

78
New cards

When may a subbase layer be unnecessary?

When roadbed soil is equal in quality to subbase, or design traffic is below 1,000,000 18-kip ESAL.

79
New cards

Purpose of dowel bars?

Transfer loads across transverse joints while allowing joint movement.

80
New cards

Dowel diameter rule of thumb?

Slab thickness × 1/8.

81
New cards

Typical dowel spacing?

300 mm on center.

82
New cards

Typical dowel length?

450 mm.

83
New cards

When should dowels be installed at every contraction joint?

For pavement thickness exceeding 200 mm due to heavy traffic loading.

84
New cards

Purpose of tie bars?

Hold adjacent slabs or lanes together at longitudinal joints.

85
New cards

Tie bar diameter in the referenced spacing table?

12 mm.

86
New cards

Tie bar spacing for slab thickness 200–230 mm?

750 mm.

87
New cards

Tie bar spacing for slab thickness 240–280 mm?

600 mm.

88
New cards

When is an expansion/isolation joint used?

To accommodate differential horizontal movement between pavement and another structure, such as at intersections.

89
New cards

Expansion joint width?

19–25 mm.

90
New cards

How long should an expansion cap cover the dowel?

At least 50 mm.

91
New cards

When is a construction joint required due to interruption?

When paving is interrupted for more than 30 minutes.

92
New cards

When should saw-cut contraction joints generally be made?

Usually 4–24 hours after concrete placement, once sufficiently hardened for sawing.

93
New cards

Minimum design flood of Culvert

20-year

94
New cards

Minimum design flood of Roadside ditches and inlets

5-year

95
New cards

Minimum design flood of Median ditches and inlets

5-year

96
New cards

Minimum design flood of Curb drop inlets

5-year

97
New cards

Minimum check flood of Culvert

50-year

98
New cards

Minimum check flood of Roadside ditches and inlets

10-year

99
New cards

Minimum check flood of Median ditches and inlets

10-year

100
New cards

Minimum check flood of Curb drop inlets

10-year