surveying
those activities involved in the planning and execution of
measurements for the location, design, construction, maintenance, and
operation of civil and other engineered projects
systematic error
errors for which the magnitude and the algebraic sign can be determined; can be eliminated from measurements when determined
random error
errors associated with the skill and vigilance of the surveyor; magnitude is unknown; tend to cancel out with multiple measurements
DMS
degree minute second (1 degree = 60’ ; 1’ = 60”)
chain
66 feet, 100 links
acre
66 ft x 660 ft (1 chain x 10 chains = 10 square chains)
hectare
100 m x 100 m = 10000 m²
link
0.66 feet (100 = 1 chain)
principle tasks of surveying
determining distance (horizontal, vertical, slope), angles (horizontal, vertical), and position (coordinates, elevation)
systematic and random
types of errors
accuracy
the relationship between the measured value and the true value
mistakes
due to inattention of the surveyor; can and should be eliminated
precision
the degree of refinement with which measurements are made
odometer
measures distance
EDM
electronic distance measurement
GPS
global positioning system
invar
material used for making surveying equipment, specifically tapes and rods
direct read, add tape, cut tape
types of readouts
6.5(10^-6)L/C or 11.7(10^-6)L/F
thermal expansion/contraction conversion factors
elevation
vertical distance above or below a reference datum
NGVD
national geodetic vertical datum
geoid
the shape that the ocean’s surface would take under the influence of gravity and rotation above, which is then extended through the continents
mean sea level
NAVD 88
vertical
aligned with the direction of the pole of earth’s gravity
horizontal
a straight line that is perpendicular to vertical
level
a curved line that is parallel to the geoid
benchmark
a permanent point of known elevation
temporary benchmark
only needed for completion of a project
turning point (TP)
a temporary spot to move level; where the rod is
side shot (same as IS)
intermediate sight taken in between turning points
differential leveling
finding difference in elevation between two points
zenith
angle measured downward from “up“
nadir
angle measured upward from “down“
meridian
longitudinal lines
theodolite (also called transit)
electronically measures angles precisely
(n-2)(180)
sum of interior angles
(n+2)(180)
sum of exterior angles
laying off angles
deflecting from straight line a certain amount/angle