NJATC Apprentice Lineman Outside 2nd Year Level IV Exam Review

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/49

flashcard set

Earn XP

Description and Tags

Flashcards covering key concepts and exam questions from the NJATC Apprentice Lineman Outside 2nd Year, Level IV test material.

Last updated 12:51 AM on 10/6/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

50 Terms

1
New cards

What are the lines or waves of magnetic force produced by an inductor called?

Lines of flux

2
New cards

What term describes the ability of a moving or changing magnetic field to induce a voltage into a conductor?

Inductance

3
New cards

What happens to the voltage drop if the current to the load is increased?

It will increase.

4
New cards

What is the voltage drop per 1,000 feet1,000\text{ feet} of 1/01/0 copper wire (resistance = 0.122 ohms per 1,000 feet0.122\text{ ohms per }1,000\text{ feet}) when 40 amperes40\text{ amperes} of current are flowing through the wire?

4.88 V4.88\,V

5
New cards

In the equation EVD=K×I×LAE_{VD} = \frac{K \times I \times L}{A}, what does the variable KK represent?

Resistivity constant of material

6
New cards

Which number on a residential meter's faceplate refers to watt-hours per turn of the disc?

KhK_h

7
New cards

What causes the metal disc in electromechanical meters to turn due to induction from the potential coil?

Eddy currents

8
New cards

Power factor is the ratio between which two peak values?

kW peak and kVA peak

9
New cards

What is the overall demand a customer puts on a system over a given period known as?

Maximum demand

10
New cards

Power factor is a ratio of peak ____ to peak ____.

kW to kVA

11
New cards

What two main types of faults, other than lightning surges, cause circuit breakers to operate on transmission systems?

Ground and phase

12
New cards

Which low voltage switches are responsible for circuit breaker activation?

Relays

13
New cards

How many types of faults, or combinations of faults, can show up and be measured at a terminal where relays detect them?

55

14
New cards

What does the acronym BIL stand for in relation to insulator flashover voltage?

Basic impulse level

15
New cards

If so equipped and properly interrogated, SCADA systems and OCR controls can give what information about a fault from the breaker?

The mileage

16
New cards

How are many FCIs built to prevent tripping due to back-feed currents?

With a high degree of immunity

17
New cards

With directional FCIs on overhead lines, where will the fault be located?

Between the last green indicator and first red indicator, unless the FCI is set on an unfused lateral tap

18
New cards

To prevent false readings, many FCIs have a high degree of what to back-feed currents?

Immunity

19
New cards

What is one method used to ground a transmission steel tower?

Counterpoise

20
New cards

When backfilling an excavation, what compaction to relative density is required for granular soil?

70%70\%

21
New cards

When a helicopter is building a tower in sections, what are placed on the tower?

Temporary brackets

22
New cards

Before another section of a steel tower is placed, what minimum percentage of the bolts must be in place and tightened on the previous section?

At least 50%50\%

23
New cards

Besides socket wrenches, what other tools are normally used on steel tower construction?

Spud wrenches

24
New cards

What do manufacturers use to protect steel after a tower has been cut and drilled?

Dip galvanizing

25
New cards

When joining copper and aluminum conductors, what rule must always be followed?

Always put aluminum on the top

26
New cards

When checking conductor sag on an existing line, what is the best method to use?

Return wave method

27
New cards

What can a phasing tester be used as?

A potential, insulator, or Hipot tester

28
New cards

What should be prepared in case of a worker's faulty memory, ensuring the tester is removed from the line and not left hanging?

Phasing diagram

29
New cards

When testing corresponding energized lines, what reading should the tester indicate?

00

30
New cards

What must be done to voltage regulators prior to closing in disconnects that will tie in two circuits?

Set on neutral position and locked out

31
New cards

What percentage of their nameplate rating capacity are transformers designed to hold for a short period?

125%125\%

32
New cards

How does overload capacity benefit a customer?

By sparing them from paying for the equipment they do not need

33
New cards

Overload capacity is a feature that allows power companies to offset what to some extent?

Cost and labor

34
New cards

Every piece of equipment has what type of built-in capacity that far exceeds its kilovolt-ampere rating?

Short-term

35
New cards

What action will reverse the rotation of a 3-phase motor?

Interchanging any two leads

36
New cards

What phase designations and markers are used by utilities?

ABC, XYZ, 123

37
New cards

When should phase rotation be known?

When a service is taken down to repair or replace a 3-phase bank

38
New cards

How do you verify that a rotation meter is working correctly?

Swap two leads and verify the meter is turning the other direction

39
New cards

Through what mechanism can back-feed occur?

Load-supplied power

40
New cards

If a meter has been pulled due to nonpayment, what should be done prior to setting a new meter?

Perform a proper voltage check.

41
New cards

If a main line neutral must be cut, what safety precaution must be taken?

A jumper must be in place before cutting the neutral.

42
New cards

What equipment will take longer to reset in cold weather or if not properly maintained?

Sectionalizers

43
New cards

What should be removed when working on a downed line fed from a single-phase OCR?

Primary leads

44
New cards

Why should Qualified Electrical Workers never assume the operating handle of an OCR is correct?

The operating handle is a mechanical device, which may be defective.

45
New cards

What capacitor-discharge device operates by building up a capacitor charge and discharging it through the cable?

Thumper

46
New cards

What are the two most popular types of primary fault locators?

Thumpers and radar

47
New cards

A thumper operates by building up what type of charge?

Capacitor charge

48
New cards

Once the sectionalizing device has de-energized the fault line, what is the next step?

Conducting a drive-through patrol

49
New cards

Since thumpers are capacitor-discharge devices, what two safety protocols are extremely important when using this device?

Grounding and barricading

50
New cards

What type of circuit is created when one or more conductors have separated and are usually laying on the ground?

Open circuit