Cost D101.1: Managerial Accounting and Cost Concepts

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/60

flashcard set

Earn XP

Description and Tags

Vocabulary flashcards covering product costing systems, CVP analysis, budgeting, standard cost variances, differential analysis, capital budgeting, and performance measurement.

61 Terms

1
New cards

Job-Order Costing

A product costing system designed for custom or unique batch products.

2
New cards

Flow of Costs in Job-Order Costing

Raw Materials →\rightarrow Work in Process (WIP) →\rightarrow Finished Goods →\rightarrow Cost of Goods Sold (COGS).

3
New cards

Predetermined Overhead Rate (POHR)

A rate established prior to the start of a period to allocate estimated manufacturing overhead based on an estimated activity base.

4
New cards

Predetermined Overhead Rate (POHR) Formula

=Estimated Total OverheadEstimated Allocation Base=\frac{\text{Estimated Total Overhead}}{\text{Estimated Allocation Base}}

5
New cards

Applied Overhead

The amount of manufacturing overhead allocated to work in process inventory based on actual activity recorded.

6
New cards

Applied Overhead Formula

=POHR×Actual Base Used=\text{POHR}\times\text{Actual Base Used}

7
New cards

Underapplied or Overapplied Overhead

The difference between actual overhead incurred and overhead applied to jobs, which is reconciled directly to Cost of Goods Sold (COGS).

8
New cards

Process Costing

A product costing system utilized for mass, continuous production of identical or homogeneous goods.

9
New cards

Equivalent Units of Production (EUP)

A metric that translates partially completed units into the equivalent count of whole, finished units.

10
New cards

Weighted-Average Method EUP Formula

Units Completed and Transferred Out + (Ending WIP Units × % Completion)


11
New cards

Cost per Equivalent Unit Formula

=Total Accumulated CostsTotal EUP=\frac{\text{Total Accumulated Costs}}{\text{Total EUP}}

12
New cards

Activity-Based Costing (ABC)

A costing approach that replaces a single plantwide rate with multiple activity cost pools and specific cost drivers.

13
New cards

Activity Rate (AR) Purpose

Assigns overhead more accurately across activities to reduce product cost distortion.

14
New cards

Activity Rate (AR) Formula

=Total Cost in Activity PoolTotal Activity Level=\frac{\text{Total Cost in Activity Pool}}{\text{Total Activity Level}}

15
New cards

Contribution Margin (CM)

The amount of sales revenue remaining after deducting variable expenses, available to cover fixed expenses and yield profit.

16
New cards

Contribution Margin (CM) Formula

=Sales−Variable Costs=\text{Sales}-\text{Variable Costs}

17
New cards

Contribution Margin Ratio (CM Ratio)

The percentage of each sales dollar remaining after variable costs to cover fixed costs and contribute to operating income.

18
New cards

Contribution Margin Ratio (CM Ratio) Formula

=CMSales=\frac{\text{CM}}{\text{Sales}}

19
New cards

Break-Even Point (Units)

The sales volume in units at which total revenue equals total expenses, yielding zero profit.

20
New cards

Break-Even Point (Units) Formula

=Total Fixed CostsUnit CM=\frac{\text{Total Fixed Costs}}{\text{Unit CM}}

21
New cards

Target Income (Units)

The unit sales volume necessary to cover all fixed costs and achieve a designated target profit.

22
New cards

Target Income (Units) Formula

Target Income (Units)=Total Fixed Costs+Target ProfitUnit CM\text{Target Income (Units)} = \frac{\text{Total Fixed Costs} + \text{Target Profit}}{\text{Unit CM}}

23
New cards

Master Budget Sequence

Sales Budget →\rightarrow Production Budget →\rightarrow Direct Materials / Direct Labor / Overhead Budgets →\rightarrow Cash Budget →\rightarrow Budgeted Financial Statements.

24
New cards

Required Production Units Formula

Required Production Units=Budgeted Sales+Desired Ending Inventory−Beginning Inventory\text{Required Production Units} = \text{Budgeted Sales} + \text{Desired Ending Inventory} - \text{Beginning Inventory}

25
New cards

Flexible Budget

A budget that dynamically adjusts revenue and expense benchmarks according to the actual level of activity achieved.

26
New cards

Materials Price Variance (MPV) Formula

=(AQ×AP)−(AQ×SP)=AQ(AP−SP)=(AQ\times AP)-(AQ\times SP)=AQ(AP-SP)

27
New cards

Materials Quantity Variance (MQV) Formula

=(AQ×SP)−(SQ×SP)=SP(AQ−SQ)=(AQ\times SP)-(SQ\times SP)=SP(AQ-SQ)

28
New cards

Labor Rate Variance (LRV) Formula

=AH(AR−SR)=AH(AR-SR)

29
New cards

Labor Efficiency Variance (LEV) Formula

=SR(AH−SH)=SR(AH-SH)

30
New cards

Favorable Variance Condition

Occurs when the actual cost incurred is lower than the standard cost allowed.

31
New cards

Unfavorable Variance Condition

Occurs when the actual cost incurred is higher than the standard cost allowed.

32
New cards

Differential Analysis (Relevant Costing)

A decision-making methodology focusing solely on future costs and revenues that differ between viable alternatives.

33
New cards

Costs Strictly Ignored in Differential Analysis

Sunk costs (past expenditures already incurred) and unavoidable allocated fixed costs.

34
New cards

Common Differential Analysis Decision Scenarios

Special orders, make-or-buy decisions, and keep-or-drop decisions.

35
New cards

Special Orders Decision Rule

Accept the order if incremental revenue exceeds incremental cost (accept if incremental revenue > incremental cost)

36
New cards

Payback Period Method

A capital budgeting assessment measuring the time required to recover an initial cash outlay while ignoring the time value of money.

37
New cards

Payback Period Formula

=Initial InvestmentAnnual Cash Inflow=\frac{\text{Initial Investment}}{\text{Annual Cash Inflow}}

38
New cards

Net Present Value (NPV) Decision Rule

Present value of future cash inflows minus initial cash outflow; projects are acceptable if NPV≥0NPV \ge 0.

39
New cards

Internal Rate of Return (IRR)

The specific discount rate at which the Net Present Value of an investment project equals zero (NPV=0NPV = 0).

40
New cards

Balanced Scorecard

A strategic performance measurement system that evaluates an organization across four comprehensive operational perspectives.

41
New cards

Four Perspectives of the Balanced Scorecard

Financial, Customer, Internal Business Processes, and Learning & Growth.

42
New cards
  • What account is debited when purchasing raw materials on account?


Raw Materials Inventory
(Increases the asset account for materials on hand)


43
New cards

What account is debited when using raw materials as indirect materials?

Manufacturing Overhead
(Indirect costs accumulate in overhead before being applied to products)



44
New cards

What account is debited when applying overhead to the manufacturing process?

Work-in-Process (WIP) Inventory
(Adds overhead cost into active production)

45
New cards

What account is debited when transferring completed goods to the warehouse?

Finished Goods Inventory
(Moves completed products from WIP to finished inventory)

46
New cards

What account is debited when selling completed goods?

Cost of Goods Sold (COGS)
(Recognizes the product cost as an expense upon sale)

47
New cards

Direct labor

directly adds value to products currently in production and creates a liability for wages owed.

48
New cards

What increases Work-in-Process Inventory

Debit- adds direct labor cost directly to production

49
New cards

What cost is a Sales office rent?

period/administrative cost

50
New cards

When overhead is applied to production jobs, what account is credited?

Debit Work-in-Process, Credit Manufacturing Overhead

51
New cards

To close overhead that was under applied at year-end, what should you do to Cost of Goods Sold (COGS)?

_____ means too little overhead was charged. To fix it, add the expense by Debit COGS

52
New cards

What is included in total manufacturing costs?

Direct labor + direct materials + manufacturing OH (applied)

53
New cards

What is included in manufacturing OH Costs?

Indirect materials, indirect labor, building rent, depreciation product equipment

54
New cards

What is allocation base?

Direct labor hours

55
New cards

COGM formula

____= Beginning WIP + total manufacturing costs - ending WIP

56
New cards

What is Work-in-Process (WIP) Inventory?

An asset account that tracks the cost of goods currently being manufactured but not yet completed

57
New cards

What costs are added to WIP?

Direct Materials Used, Direct Labor, Applied Manufacturing Overhead


58
New cards

When is WIP credited?

When goods are completed and transferred to Finished Goods Inventory (Cost of Goods Manufactured)

59
New cards

How do you calculate Direct materials used?

____= beg. Raw materials + purchases - ending raw materials

60
New cards

Unadjusted COGS Formla

_____= beg. Finished goods + COGM - ending finished goods

61
New cards

Adjust for OH

Applied OH - actual OH

(If + it’s over applied / if - it’s under applied)