Comprehensive vocabulary flashcards covering BS EN 60617 electrical symbols, diagram types, wiring systems, inspection, testing methodologies, fault finding, and electrical safety from Brian Scaddan's 18th Edition IET Wiring Regulations guide.

45 Terms

1
New cards

BS EN 60617

The British and European standard that defines the graphical symbols to be used in all electrical and electronic drawings, aligning with International Electrotechnical Commission (IEC) document 617.

2
New cards

Block Diagram

A diagram that indicates the general operational sequence and function of an electrical installation or system using block symbols and notes, without showing detailed terminal connections.

3
New cards

Interconnection Diagram

A diagram that shows equipment units in block form but includes detailed information on the specific external cable connections and wiring routes between the items.

4
New cards

Circuit Diagram

A schematic diagram showing how a circuit works and its operational sequence (typically from left to right or top to bottom) without regard to the physical layout or geographical location of the components.

5
New cards

Wiring Diagram

A connection diagram that illustrates how components and conductors are physically connected together, displaying accessories in their correct relative geographical locations wherever practicable.

6
New cards

Circuit Convention ("Normal" State)

The standard practice of illustrating all components, contacts, coils, and switches on schematic diagrams in their completely de-energized or unpowered resting state.

7
New cards

Programmable Logic Controller (PLC)

A solid-state, microprocessor-based control unit with no moving parts that processes inputs from sensors or switches and activates outputs according to an internally stored ladder logic program.

8
New cards

Ladder Logic

A graphical programming language for PLCs and relay circuits whose schematic representation resembles the rungs of a ladder, containing input conditions (contacts) on the left and outputs (coils) on the right.

9
New cards

Radial System

An electrical distribution or circuit arrangement that originates at a central supply point and either branches outwards like spokes of a wheel or runs from point to point as a single continuous chain.

10
New cards

Ring Final Circuit

A circuit arrangement common in UK domestic installations that originates at a protective device in the consumer unit, loops through socket outlets, and returns to the same terminals at the origin.

11
New cards

Maintained Emergency Lighting System

An emergency lighting system where luminaires are continuously energized by mains electricity via a step-down transformer during normal conditions and remain illuminated via a battery backup upon mains failure.

12
New cards

Non-Maintained Emergency Lighting System

An emergency lighting system in which luminaires remain extinguished under normal mains conditions and only illuminate via battery power when a total mains failure occurs.

13
New cards

Open-Circuit Alarm System

An alarm circuit in which call points or detectors are connected in parallel, such that operating any sensor completes the circuit to energize the control relay and sounder.

14
New cards

End-of-Line Resistor (EOLR)

A resistor fitted across the final detector in an open-circuit detection loop to permit continuous low-level supervisory current monitoring of cable integrity without triggering an alarm.

15
New cards

Closed-Circuit Alarm System

A self-monitoring alarm circuit where sensors are wired in series with a continuously energized relay, ensuring that any broken wire or opened contact de-energizes the relay and sounds the alarm.

16
New cards

Tamper Loop

A continuous conductor loop wired to every detector in a security installation that is monitored 24 h24\text{ h} a day to immediately trigger an alarm if any detector casing or cable is breached.

17
New cards

Direct-On-Line (DOL) Starter

A motor starter that applies the full supply voltage directly to the motor windings upon starting, controlled by a contactor with hold-on auxiliary contacts and thermal overload protection.

18
New cards

Star-Delta Starter

A motor control system designed to reduce starting current by first connecting motor windings in a star configuration, and then using an electronic timer to transition them into a delta configuration.

19
New cards

Accelerator (Thermostat)

A small internal heating resistor located inside a room thermostat that accelerates the switching response, enhancing temperature regulation accuracy to within 1∘C1^{\circ}\text{C}.

20
New cards

Mid-Position Valve

A three-port, motor-operated diverter valve used in fully pumped central heating systems that directs flow to domestic hot water only, central heating only, or both simultaneously.

21
New cards

Extra Low-Voltage (ELV) Lighting

A lighting system operating at 12 V AC12\text{ V AC} supplied by a 230 V/12 V230\text{ V}/12\text{ V} step-down transformer and utilizing high-performance, low-heat tungsten halogen dichroic lamps.

22
New cards

Master Telephone Socket

The initial incoming line socket in a domestic installation containing overvoltage protection against lightning strikes and a capacitor to prevent telephone tinkling during dialing.

23
New cards
<p>Secondary Telephone Socket Wiring</p>

Secondary Telephone Socket Wiring

The British Telecom CW1308 IDC connection standard: terminal 22 is blue with white stripe, terminal 33 is orange with white stripe, terminal 44 is white with orange stripe, and terminal 55 is white with blue stripe.

24
New cards

Approved Voltage Indicator (GS38)

A robust, dedicated voltage-testing device conforming to HSE Guidance Note GS38 that incorporates fused leads, finger barriers, shrouded terminals, and current-limiting resistors to safely prove circuits dead.

25
New cards

Continuity of Circuit Protective Conductors (R1+R2R_1 + R_2)

A dead test conducted with a low-resistance ohmmeter by linking the line and cpc at the distribution board and probing between line and cpc at each outlet to confirm continuity and record the highest combined resistance value.

26
New cards

Supplementary Bonding Conductor Resistance Rule

The requirement that the resistance (RR) of a supplementary bonding conductor installed between accessible conductive parts must satisfy R≤50IaR \le \frac{50}{I_a}, where IaI_a is the current causing disconnection within 5 s5\text{ s}.

27
New cards

Insulation Resistance ("Meggering")

A test performed with a high-reading ohmmeter at 250 V250\text{ V}, 500 V500\text{ V}, or 1000 V DC1000\text{ V DC} between live conductors and earth, or between live conductors, to confirm insulation integrity and identify deterioration or short circuits.

28
New cards

Polarity Test

A verification test ensuring all fuses and single-pole control devices are installed in the line conductor, socket outlets are wired correctly, and the center contact of Edison screw lampholders connects to line.

29
New cards

Earth Fault Loop Impedance (ZsZ_s)

The total impedance of the closed path traversed by fault current originating at the fault point, through the cpc, earthing terminal, earth return path, transformer winding, and line conductor back to the fault.

30
New cards

0.80.8 Rule of Thumb

A practical calculation rule requiring measured earth fault loop impedance (ZsZ_s) to not exceed 0.80.8 of the tabulated maximum values to allow for higher conductor operating temperatures under fault conditions.

31
New cards

External Earth Fault Loop Impedance (ZeZ_e)

The impedance of the supply network up to the intake point, measured at the origin of an installation with all main protective bonding conductors temporarily disconnected.

32
New cards
<p>Earth Electrode Installation</p>

Earth Electrode Installation

A connection to the general mass of earth via a driven rod housed inside a protective inspection pit with a removable link to facilitate disconnection and periodic testing.

33
New cards

Earth Electrode Resistance Area

The zone of soil surrounding an earth electrode (extending approximately 2.5 m2.5\text{ m} to 3 m3\text{ m} radially outwards) within which nearly all the resistance of the earth return path is concentrated.

34
New cards

Residual Current Device (RCD)

An electromechanical safety device that monitors circuit balance and disconnects supply when earth leakage current reaches a preset value (typically 30 mA30\text{ mA} tripping in under 40 ms40\text{ ms} at 5×IΔn5 \times I_{\Delta n}).

35
New cards

Prospective Fault Current (PFC)

The prospective maximum current that would flow at a given point in an installation if line and neutral (short-circuit) or line and earth (earth fault) were shorted together with negligible impedance.

36
New cards

Rated Breaking Capacity

The maximum short-circuit or fault current that a protective device (such as an MCB or cartridge fuse) is capable of safely interrupting without physical destruction, arcing, or fire risk.

37
New cards

Overload Current

An overcurrent occurring in an electrical circuit that is electrically sound, caused by connecting loads or appliances that exceed the normal design capacity of the circuit.

38
New cards

Short-Circuit Current

An overcurrent resulting from a fault of negligible impedance between live conductors that have a difference in potential under normal operating conditions.

39
New cards
<p>Rewireable Fuse Blown by Overload</p>

Rewireable Fuse Blown by Overload

The failure state of a rewireable fuse element characterized by clean melting of the fuse wire at or near its center without extensive burning or vaporized copper splatter.

40
New cards
<p>Rewireable Fuse Blown by Short-Circuit</p>

Rewireable Fuse Blown by Short-Circuit

The violent failure state of a rewireable fuse element characterized by explosive vaporization of the wire and heavy blackening or molten copper splatter across the carrier.

41
New cards

Murray Loop Test

A bridge test based on the Wheatstone bridge principle used by electricians to pinpoint the exact location of a short-circuit fault along concealed or underground cables.

42
New cards

Electric Shock

The passage of electric current through the body of human or livestock of sufficient magnitude (typically above 10 mA10\text{ mA} for muscular contraction and 50 mA50\text{ mA} for ventricular fibrillation) to cause significant injury or death.

43
New cards

Basic Protection

Measures intended to prevent danger and electric shock from direct contact with parts that are intentionally live during normal operating conditions (such as insulation, barriers, and enclosures).

44
New cards

Fault Protection

Measures intended to prevent electric shock from contact with exposed or extraneous conductive parts that have become live accidentally due to an insulation failure, achieved through earthing, bonding, and automatic disconnection.

45
New cards

Safe Isolation

The statutory safety procedure requiring circuits to be identified, isolated, locked off, and verified dead using an approved test lamp checked against a known proving unit both before and after the test.