5 Major Threat Categories

  1. Malicious Acts

  2. Natural Disasters

  3. Unintentional Acts (accidents)

  4. Dependency/Proximity Hazards

  5. Aging Infrastructure


2
New cards

Malicious Acts

Bomb

3
New cards

Natural Disaster

Flood

4
New cards

Unintentional Acts

Monitoring System Shutdown

5
New cards

Dependency/Proximity Hazards

Power Outage

Chemical Spill

6
New cards

Aging Infrastructure

Pump Failure

7
New cards

Vulnerabilities: Water Supply Quantity

  • Loss of source water

    • drought or dam failure

  • Disruption in distribution system

    • water main rupture, pump failure


8
New cards

Vulnerabilities: Water Quality

  • Source water (surface or groundwater) contamination

  • Treatment System Failure- Improper Treatment

  • Distribution system (post-treatment) contamination

    • Injection (malicious acts)

    • Back flow (accidental)


9
New cards

Single Points of Failure- Lack of Redundancy

  • Source water from a single source

  • Single water conveyance pipe

  • Single supply pump

  • Single disinfection (treatment) tank

  • Single storage tank


10
New cards

The 4 R’s or Resilience

  1. Robustness

  2. Redundancy

  3. Rapidity

  4. Resourcefulness


11
New cards

Robustness

Def: ability to withstand stress without loss of service

Application to Water System:

  • Treatment plants designed to handle peak flows and varying water quality.

  • Water towers and pipelines built to withstand floods, freezing temperatures, and corrosion.

  • Backup power systems that keep pumps and treatment processes running during outages.


12
New cards

Redundancy

Def: back-up or alternatives to provide service

Application to Water System:

  • Multiple pumps instead of a single pump.

  • Two or more clarifiers, filters, or wells.

  • Interconnections with neighboring water utilities.

  • Backup generators and emergency storage tanks.


13
New cards

Rapidity

Def: ability to quickly bring back service

Application to Water System:

  • Rapid repair of water main breaks.

  • Quick startup of backup generators after power loss.

  • Emergency communication systems that alert operators immediately.

  • Stockpiles of replacement parts.


14
New cards

Resourcefulness

Def: using available material and human resources creatively, effectively, and adaptively

Application to Water System:

  • Operators adjusting treatment processes when source water quality changes.

  • Emergency response plans for contamination events.

  • Availability of trained staff, spare parts, and mutual aid agreements.

  • Using alternative water sources during drought conditions.


15
New cards

General ways to improve resilience

  1. Planning'

  2. Prioritization

  3. Emergency Preparedness

  4. Communication

  5. Public Education

  6. Funding

  7. Reassessment (after disruption)


16
New cards

Why might a community have multiple potential water sources

Some communities have a access to several water sources such as:

  • Groundwater aquifers

  • River

  • Lakes or reservoirs

having multiple water sources is more likely when a community is near major rivers, lakes, or a productive aquifer.


17
New cards

A community with limited potential water sources is likely to due:

  • Not being located near large rivers or lakes

  • Local aquifers have limited yields and cannot supply enough water

  • The population is too large for a single aquifer to support long term demand. Cities with large populations often cannot rely exclusively on groundwater


18
New cards

Describe the importance of water source diversification

  • Several supplies can spread out various risks

  • Water source diversification helps reduce risk because communities are not dependent on a single source. If one source is affected by drought, contamination, over pumping, or infrastructure failure, other sources can continue supplying water


19
New cards

What are potential sources of groundwater pollution

Anthropogenic

  • Leaky storage tanks '

  • Old waste sites

  • Landfills

  • Agriculture

  • Injection wells

  • Fracking

  • Septic Systems

  • Atmospheric deposition

  • Urban Runoff

Non-Anthropogenic

  • Radium Arsenic

  • Strontium

  • Saline

  • Iron


20
New cards

What geologic and hydrologic features influence susceptibility to contamination

  • Soil permeability: Sandy soils allow water and contaminants to infiltrate rapidly increasing contamination risk. In clay and silt layers slow infiltration provides more protection

  • Depth to groundwater and bedrock: Shallow groundwater is generally more vulnerable because contaminants have less material to travel through before reaching the aquifer. Shallow bedrock provides less natural filtration

  • Type of bedrock: Fractured bedrock can create preferential flow paths that allow contaminants to move quickly into groundwater with little filtration. Areas with fractured limestone and dolomite are particularly susceptible

  • Recharge and infiltration rates: areas with high recharge rates allow water and any dissolved contaminants to move more rapidly from the surface to the aquifer

  • Geochemical conditions: natural contaminants such as arsenic and radium are influenced by the geologic deposit, groundwater oxygen conditions, and pH. These conditions affect whether contaminants remain trapped in the rock or dissolve into groundwater


21
New cards

What are the potential sources of pollution to surface waters, compare/contrast those of ground water

Includes many of the same sources that affect groundwater

  • leaking storage tanks

  • old waste sites

  • agriculture

  • injection wells

  • fracking

  • mine tailings

  • septic systems

  • sewer exfiltration

  • saltwater intrusion

Other sources of surface water contamination

  • runoff of any kind

    • agricultural, urban, industrial, construction

  • wastewater discharges

    • industrial, municipal, overflows (sanitary or combined sewer)


22
New cards

What are the major contaminants of concern with respect to water supply (surface water)

  • Pathogens (much more so than with gw)

  • Suspended solids

  • Dissolved solids

  • Metals

  • Nitrates

  • Organics

    • Synthetic organic compounds - fertilizer

    • Volatile organic compounds - benzene

  • Pharmaceuticals and personal care products


23
New cards

What are the major factors that influence surface water quality within a watershed

  1. Watershed characteristics and land use

    1. Agricultural land use tends to increase suspended solids, nitrogen and phosphorus concentrations in streams

    2. Urban land use contributes runoff containing pollutants

  2. Topography and soils

    1. topography and soil characteristics influence generation and contaminant transport to streams

  3. Location of land use within a watershed

    1. Pollution sources close to streams generally have greater impacts because contaminants have less travel distance and less opportunity

  4. Watershed protection practices


24
New cards

Explain how land use within a watershed determines water quality

  • Land use determines the type, amount, and pathway of pollutants entering surface water

    • Agricultural land can contribute ( ) through overland flow

      • sediment

      • manure

      • phosphorus

      • nitrogen

    • Urban land adds pollutants through stormwater runoff. Impervious surfaces such as roads, roofs, and parking lots increasing runoff while storm sewers can carry pollutants directly to waterways

    • Forested or prairie land generally produce lower pollutant loads because vegetation slows runoff, promotes infiltration, and reduces erosion


25
New cards

Point source contaminant

Examples: Wastewater treatment facilities and industries

Discharge from identifiable locations and normally monitor their flow and pollutant concentrations


26
New cards

Non-point Sources

Includes ag runoff and urban runoff septic systems and gw inflow

Distributed throughout the watershed and are more difficult to measure

27
New cards

Describe mehthods and challenges to water quality monitoring

  • water quality monitoring generally required measurements of:

    • flow or runoff volume

    • pollutant concentration

    • timing during the runoff event

  • types of sampling

    • Grab sample: collected manually at one specific time. Labor intensive and may not accurately represent the entire storm

    • Automated sampler: collect samples throughout a storm

  • monitoring challenges:

    • pollutant concentration can change significantly during a storm

    • storm size and timing are difficult to predict

    • costly


28
New cards

Explain the determination and applicability of the Unit Area Loading approach to calculate loadings

  • The UAL approach estimates pollutant loads based on land use. A UAL represents the average mass of a pollutant exported from a unit area over time

  • UALs depend on

    • Land slope

    • soil type

    • rainfall amount and intensity

    • timing

    • type of crop

    • cropping practices

    • manure/fertilizer application

  • To calculate watershed loading

    • watershed ares is subdivided by land use

    • determine UAL for each land use

    • land use area (arces) x UAL (lbs/acre/yr) = loading (lbs/yr)

    • determine loadings from each land use

    • sum all for total loading


29
New cards

Key steps and essential elements of watershed planning and implementation

6 essential steps

  1. build partnerships

  2. characterize your watershed

  3. finalize goals and identify solutions

  4. design an implementation program

  5. implement the watershed plan

  6. measure progress and make adjustments


30
New cards

Describe the TMDL process and its goals

  • TMDL is a federal process, carried out by states in effor to meet water quality goals

  • Process:

    • Science and Engineering

      • determine current loadings (measrue/model) = current water quality

      • determine target loadings (model) to get desired water quality

      • margin of safety

    • Requlatory and political

      • “distribute” loading reductions between point and non point sources

    • All stakeholders

      • develop and implement a plan to achieve desired water quality

  • Goal: Restore impaired waters so they meet their desired water quality standards


31
New cards

Calibration

changing model variable to get the best fit of the model to existing data

32
New cards

Validation

Testing the calibrated model to check appropriateness to a different set of existing data

33
New cards

Summarize the design process

  • Thoroughly understand the following before developing a solution

    • the problem

    • client needs

    • and operator requirements

  • Design facilities to meet max daily demand while still operating efficiently at average daily demand and minimum demand conditions

  • Estimate capital, operation, and maintenance costs as make recommendations

  • Good design requires understanding existing conditions, future needs, regulations, process performance, and costs before selecting a preferred alternative


34
New cards

Alternative Analysis

The process of developing and comparing multiple feasible solutions before selecting a final design

  • Helps engineers identify the most cost effective, reliable, and sustainable solution


35
New cards

Variation in Water Demand Annually and Values Used for Design

  • For drinking water systems demand is typically highest during the summer (hot and dry months) and lowest during cooler months

  • Engineers must account for this variation when designing treatment and distribution systems

  • Design flows used

    • ADD: average amount of water used per day over a year. This represents normal operating conditions

    • MDD: the highest daily water demand expected during the year. Treatment and hydraulic capacity are typically designed to meet MDD

    • MinDD: the lowest demand period during the year


36
New cards

Hardness

Sum of divalent cations primarily due to Ca++ and Mg ++

37
New cards

Softening

precipitating out hardness

38
New cards

Carbonate hardness

Carbonates (carbonate and bicarbonate)

  • at common pH values bicarbonate dominates


39
New cards

If alkalinity > hardness

  • Total hardness = carbonate hardness

  • In this case there is enough carbonate to react with the hardness


40
New cards

If alkalinity < hardness

  • carbonate hardness = alkalinity

  • Non-carbonate hardness = total hardness - alkalinity


41
New cards

Traditional Softening Process

  • Traditional water softening removed hardness causing Ca++ and Mg++ by chemical precipitation. Chemicals are added to the water, causing calcium and magnesium to form soluble solids that can be removed from the treatment process

  • Primary chemicals used:

    • Lime to raise pH and promote precipitation of calcium and magnesium

    • Soda ash when non-carbonate hardness is present because it supplies additional carbonate needed for precipitation

  • Softening reduced but does not completely eliminate hardness


42
New cards

Coagulation

Addition of one or more chemicals to condition (destabilize) small particles (termed colloids) for subsequent flocculation

43
New cards

Flocculation

The process of aggregation of destabilized particles and precipitation products into flocs

44
New cards

Explain how coagulants destabilize particles

  • Most colloids in water have a negative surface charge, causing them to repel one another and remain suspended rather than settle

  • Coagulants destabilize these particles by reducing the repulsive forces between them. When coagulants are added, they lower the energy barrier than prevents particles from coming together.

    • 4 main destabilize mechanisms

      • Compression of the electric double layer around the particle, reducing repulsive forces

      • Adsorption and charge neutralization, where positively charged coagulant ions attach to negatively charged particle and neutralize their surface charge

      • Polymer bridging where long chain organic polymers connect multiple particles together

      • Enmeshment in precipitates


45
New cards

Importance of mixing and Horizontal Velocity in the flocculation process

  • Flocculation mixing is slow. The goal is not intense mixing but creating gentle velocity differences that cause particles to collide together with out breaking apart. Typical detention times are greater than 20 min.

  • Horizontal velocity is also important, and it must be carefully controlled because:

    • too slow velocity can allow flocs to settle in flocculation tank instead of in clarifier

    • too fast velocity can shear or break apart flocs that have already been formed

  • therefore, successful flocculation requires enough mixing to promote particle collisions but not so much that flocs are destroyed


46
New cards

Explain how jar tests can be used to help choose chemicals and design systems

Can be used to

  • compare different coagulants

  • determine the optimum chemical dosage for turbidity removal

  • evaluate the effect of pH on coagulation performance

  • select the most cost effective chemical and dose

  • estimate flocculation detention times and mixing requirements for design