5 Major Threat Categories
Malicious Acts
Natural Disasters
Unintentional Acts (accidents)
Dependency/Proximity Hazards
Aging Infrastructure
Malicious Acts
Bomb
Natural Disaster
Flood
Unintentional Acts
Monitoring System Shutdown
Dependency/Proximity Hazards
Power Outage
Chemical Spill
Aging Infrastructure
Pump Failure
Vulnerabilities: Water Supply Quantity
Loss of source water
drought or dam failure
Disruption in distribution system
water main rupture, pump failure
Vulnerabilities: Water Quality
Source water (surface or groundwater) contamination
Treatment System Failure- Improper Treatment
Distribution system (post-treatment) contamination
Injection (malicious acts)
Back flow (accidental)
Single Points of Failure- Lack of Redundancy
Source water from a single source
Single water conveyance pipe
Single supply pump
Single disinfection (treatment) tank
Single storage tank
The 4 R’s or Resilience
Robustness
Redundancy
Rapidity
Resourcefulness
Robustness
Def: ability to withstand stress without loss of service
Application to Water System:
Treatment plants designed to handle peak flows and varying water quality.
Water towers and pipelines built to withstand floods, freezing temperatures, and corrosion.
Backup power systems that keep pumps and treatment processes running during outages.
Redundancy
Def: back-up or alternatives to provide service
Application to Water System:
Multiple pumps instead of a single pump.
Two or more clarifiers, filters, or wells.
Interconnections with neighboring water utilities.
Backup generators and emergency storage tanks.
Rapidity
Def: ability to quickly bring back service
Application to Water System:
Rapid repair of water main breaks.
Quick startup of backup generators after power loss.
Emergency communication systems that alert operators immediately.
Stockpiles of replacement parts.
Resourcefulness
Def: using available material and human resources creatively, effectively, and adaptively
Application to Water System:
Operators adjusting treatment processes when source water quality changes.
Emergency response plans for contamination events.
Availability of trained staff, spare parts, and mutual aid agreements.
Using alternative water sources during drought conditions.
General ways to improve resilience
Planning'
Prioritization
Emergency Preparedness
Communication
Public Education
Funding
Reassessment (after disruption)
Why might a community have multiple potential water sources
Some communities have a access to several water sources such as:
Groundwater aquifers
River
Lakes or reservoirs
having multiple water sources is more likely when a community is near major rivers, lakes, or a productive aquifer.
A community with limited potential water sources is likely to due:
Not being located near large rivers or lakes
Local aquifers have limited yields and cannot supply enough water
The population is too large for a single aquifer to support long term demand. Cities with large populations often cannot rely exclusively on groundwater
Describe the importance of water source diversification
Several supplies can spread out various risks
Water source diversification helps reduce risk because communities are not dependent on a single source. If one source is affected by drought, contamination, over pumping, or infrastructure failure, other sources can continue supplying water
What are potential sources of groundwater pollution
Anthropogenic
Leaky storage tanks '
Old waste sites
Landfills
Agriculture
Injection wells
Fracking
Septic Systems
Atmospheric deposition
Urban Runoff
Non-Anthropogenic
Radium Arsenic
Strontium
Saline
Iron
What geologic and hydrologic features influence susceptibility to contamination
Soil permeability: Sandy soils allow water and contaminants to infiltrate rapidly increasing contamination risk. In clay and silt layers slow infiltration provides more protection
Depth to groundwater and bedrock: Shallow groundwater is generally more vulnerable because contaminants have less material to travel through before reaching the aquifer. Shallow bedrock provides less natural filtration
Type of bedrock: Fractured bedrock can create preferential flow paths that allow contaminants to move quickly into groundwater with little filtration. Areas with fractured limestone and dolomite are particularly susceptible
Recharge and infiltration rates: areas with high recharge rates allow water and any dissolved contaminants to move more rapidly from the surface to the aquifer
Geochemical conditions: natural contaminants such as arsenic and radium are influenced by the geologic deposit, groundwater oxygen conditions, and pH. These conditions affect whether contaminants remain trapped in the rock or dissolve into groundwater
What are the potential sources of pollution to surface waters, compare/contrast those of ground water
Includes many of the same sources that affect groundwater
leaking storage tanks
old waste sites
agriculture
injection wells
fracking
mine tailings
septic systems
sewer exfiltration
saltwater intrusion
Other sources of surface water contamination
runoff of any kind
agricultural, urban, industrial, construction
wastewater discharges
industrial, municipal, overflows (sanitary or combined sewer)
What are the major contaminants of concern with respect to water supply (surface water)
Pathogens (much more so than with gw)
Suspended solids
Dissolved solids
Metals
Nitrates
Organics
Synthetic organic compounds - fertilizer
Volatile organic compounds - benzene
Pharmaceuticals and personal care products
What are the major factors that influence surface water quality within a watershed
Watershed characteristics and land use
Agricultural land use tends to increase suspended solids, nitrogen and phosphorus concentrations in streams
Urban land use contributes runoff containing pollutants
Topography and soils
topography and soil characteristics influence generation and contaminant transport to streams
Location of land use within a watershed
Pollution sources close to streams generally have greater impacts because contaminants have less travel distance and less opportunity
Watershed protection practices
Explain how land use within a watershed determines water quality
Land use determines the type, amount, and pathway of pollutants entering surface water
Agricultural land can contribute ( ) through overland flow
sediment
manure
phosphorus
nitrogen
Urban land adds pollutants through stormwater runoff. Impervious surfaces such as roads, roofs, and parking lots increasing runoff while storm sewers can carry pollutants directly to waterways
Forested or prairie land generally produce lower pollutant loads because vegetation slows runoff, promotes infiltration, and reduces erosion
Point source contaminant
Examples: Wastewater treatment facilities and industries
Discharge from identifiable locations and normally monitor their flow and pollutant concentrations
Non-point Sources
Includes ag runoff and urban runoff septic systems and gw inflow
Distributed throughout the watershed and are more difficult to measure
Describe mehthods and challenges to water quality monitoring
water quality monitoring generally required measurements of:
flow or runoff volume
pollutant concentration
timing during the runoff event
types of sampling
Grab sample: collected manually at one specific time. Labor intensive and may not accurately represent the entire storm
Automated sampler: collect samples throughout a storm
monitoring challenges:
pollutant concentration can change significantly during a storm
storm size and timing are difficult to predict
costly
Explain the determination and applicability of the Unit Area Loading approach to calculate loadings
The UAL approach estimates pollutant loads based on land use. A UAL represents the average mass of a pollutant exported from a unit area over time
UALs depend on
Land slope
soil type
rainfall amount and intensity
timing
type of crop
cropping practices
manure/fertilizer application
To calculate watershed loading
watershed ares is subdivided by land use
determine UAL for each land use
land use area (arces) x UAL (lbs/acre/yr) = loading (lbs/yr)
determine loadings from each land use
sum all for total loading
Key steps and essential elements of watershed planning and implementation
6 essential steps
build partnerships
characterize your watershed
finalize goals and identify solutions
design an implementation program
implement the watershed plan
measure progress and make adjustments
Describe the TMDL process and its goals
TMDL is a federal process, carried out by states in effor to meet water quality goals
Process:
Science and Engineering
determine current loadings (measrue/model) = current water quality
determine target loadings (model) to get desired water quality
margin of safety
Requlatory and political
“distribute” loading reductions between point and non point sources
All stakeholders
develop and implement a plan to achieve desired water quality
Goal: Restore impaired waters so they meet their desired water quality standards
Calibration
changing model variable to get the best fit of the model to existing data
Validation
Testing the calibrated model to check appropriateness to a different set of existing data
Summarize the design process
Thoroughly understand the following before developing a solution
the problem
client needs
and operator requirements
Design facilities to meet max daily demand while still operating efficiently at average daily demand and minimum demand conditions
Estimate capital, operation, and maintenance costs as make recommendations
Good design requires understanding existing conditions, future needs, regulations, process performance, and costs before selecting a preferred alternative
Alternative Analysis
The process of developing and comparing multiple feasible solutions before selecting a final design
Helps engineers identify the most cost effective, reliable, and sustainable solution
Variation in Water Demand Annually and Values Used for Design
For drinking water systems demand is typically highest during the summer (hot and dry months) and lowest during cooler months
Engineers must account for this variation when designing treatment and distribution systems
Design flows used
ADD: average amount of water used per day over a year. This represents normal operating conditions
MDD: the highest daily water demand expected during the year. Treatment and hydraulic capacity are typically designed to meet MDD
MinDD: the lowest demand period during the year
Hardness
Sum of divalent cations primarily due to Ca++ and Mg ++
Softening
precipitating out hardness
Carbonate hardness
Carbonates (carbonate and bicarbonate)
at common pH values bicarbonate dominates
If alkalinity > hardness
Total hardness = carbonate hardness
In this case there is enough carbonate to react with the hardness
If alkalinity < hardness
carbonate hardness = alkalinity
Non-carbonate hardness = total hardness - alkalinity
Traditional Softening Process
Traditional water softening removed hardness causing Ca++ and Mg++ by chemical precipitation. Chemicals are added to the water, causing calcium and magnesium to form soluble solids that can be removed from the treatment process
Primary chemicals used:
Lime to raise pH and promote precipitation of calcium and magnesium
Soda ash when non-carbonate hardness is present because it supplies additional carbonate needed for precipitation
Softening reduced but does not completely eliminate hardness
Coagulation
Addition of one or more chemicals to condition (destabilize) small particles (termed colloids) for subsequent flocculation
Flocculation
The process of aggregation of destabilized particles and precipitation products into flocs
Explain how coagulants destabilize particles
Most colloids in water have a negative surface charge, causing them to repel one another and remain suspended rather than settle
Coagulants destabilize these particles by reducing the repulsive forces between them. When coagulants are added, they lower the energy barrier than prevents particles from coming together.
4 main destabilize mechanisms
Compression of the electric double layer around the particle, reducing repulsive forces
Adsorption and charge neutralization, where positively charged coagulant ions attach to negatively charged particle and neutralize their surface charge
Polymer bridging where long chain organic polymers connect multiple particles together
Enmeshment in precipitates
Importance of mixing and Horizontal Velocity in the flocculation process
Flocculation mixing is slow. The goal is not intense mixing but creating gentle velocity differences that cause particles to collide together with out breaking apart. Typical detention times are greater than 20 min.
Horizontal velocity is also important, and it must be carefully controlled because:
too slow velocity can allow flocs to settle in flocculation tank instead of in clarifier
too fast velocity can shear or break apart flocs that have already been formed
therefore, successful flocculation requires enough mixing to promote particle collisions but not so much that flocs are destroyed
Explain how jar tests can be used to help choose chemicals and design systems
Can be used to
compare different coagulants
determine the optimum chemical dosage for turbidity removal
evaluate the effect of pH on coagulation performance
select the most cost effective chemical and dose
estimate flocculation detention times and mixing requirements for design