Comprehensive vocabulary flashcards covering bulk earthworks, shoring systems, trenching volume calculations, dewatering, backfilling practices, and soil density parameters.
Open Excavation
A large excavation performed to found buildings with underground space (such as basements) or deep foundations.
Pit Excavation
An excavation created to found an individual column base (pad) or an elevator shaft.
Grading
The process of moving earth to achieve a final grade where the existing site grading needs to change.
Rough Grading
Grading performed using large heavy equipment during major construction phases.
Fine Grading
Precision grading completed at the end of a construction project using smaller equipment.
Secant Concrete Piles (Caisson)
The most common shoring system utilized on downtown construction projects abutting adjacent structures.
Anchoring & Nailing (Tiebacks)
The most common shoring system used on downtown projects that do not abut adjacent structures.
Tieback
Several strands of braided steel cable drilled and grouted into the earth at an angle to provide lateral retention.
Soil Nails
Solid metal bars drilled and grouted into the earth at an angle for soil retention.
Dewatering
Temporarily lowering the groundwater table to permit subsurface construction work.
Sump Dewatering
A dewatering method where groundwater is collected in a deeper section of the excavation and pumped away.
Well Point Dewatering
A method to lower the surrounding water table by drilling well points around the excavation and pumping water down.
Sloped Bulk Excavation Volume
The volume calculated using the formula 3H(A+B+A×B), where H is vertical depth, A is top area, and B is bottom area.
Ministry of Environment (MOE) Permits
Required legal permits to take water and discharge water during dewatering, carrying major fines for non-compliance.
Flat Trench Volume Calculation
The volume determination for a flat trench found by: Trench length×Average width×Depth.
Sloped Trench Volume Calculation
The volume calculation for a sloped trench found by: Trench length×Average trench area.
Trenching Cost Factors
Key factors influencing cost per volume, including equipment productivity (size, cycle time), bucket/scoop volume, and material type or bulk factors.
Backfill
The process of placing soils or aggregate materials back into an excavation around a service pipe, foundation, or basement wall.
Lift
A layer of backfill placed horizontally across the bottom of an excavation, typically 6′′ to 8′′ thick (no more than 8′′ to 12′′, and as thin as 2′′).
"Dump and Roll"
An inadequate backfilling method done without distinct lifts, resulting in poor compaction and inevitable eventual settling.
Soil Volume Changes
The volumetric shift of earth across states: 1cy of bank soil expands to 1.25cy of loose excavated soil, which compacts down to 0.9cy.
100% Dense Material
The state when the mass of material in a given volume reaches its maximum capacity, meaning it cannot be compacted any further.
Density Formula
Defined as mass per unit volume, represented as Density (ρ)=Volume (V)Mass (M).
Density Coefficients
Specific soil factors including swell percentage (35%), swell factor (0.74), load factor (0.599), and shrinkage percentage (−7%).
Nuclear Density Meter
A device that emits gamma rays into soil and measures non-absorbed rays to determine the soil's compaction percentage.