no project can have multiple MIRRs

true

2
New cards

the IRR of a project is altered by a change in the cost of capital

false

3
New cards

one cannot calculate an IRR for a project will all negative cash flows

true

4
New cards

the NPV method assumes reinvestment of interim cash flows at the cost of capital rate

true

5
New cards

if a project with normal cash flows has an IRR greater than 0%, the NPV of that project can be negative

true

6
New cards

for multiple IRRs to occur, the cash flows of the project must be nonnormal

true

7
New cards

if the NPV of a project with normal cash flows is positive, then both the IRR and MIRR will be greater than k for the project

true

8
New cards

if two mutually exclusive projects have the same size and life, NPV and MIRR will agree as to which project will add the most value to the firm

true

9
New cards

For a project with normal cash flows, the discounted payback period will be longer than the payback period

true

10
New cards

Both the IRR and MIRR assume reinvestment of interim cash flows at the project’s IRR rate

false

11
New cards

the replacement project analysis uses incremental cash flows between keeping the old machine versus going with the new machine to calculate the OCFs for the cash flow line.

true

12
New cards

a local test market’s cost should not be put on the cash flow line when deciding after the test market whether to take the product national or not

true

13
New cards

the “missed sale of the old machine” is put as a negative cash flow because it is no longer going to be received since the old machine is sold earlier

true

14
New cards

all sales of a firm’s new product should be included in the OCF

false

15
New cards

interest expense is not subtracted when calculating OCF for the cash flow line since the cost of debt will be accounted for when NPV discounts the OCFs by the WACC

16
New cards

if a project has normal cash flows (whose sum exceeds zero) and has an MIRR that is less than the IRR, the project whould have to have a k less than the MIRR

true

17
New cards

if the sum of a normal project’s cash flows is zero, the MIRR is zero

false

18
New cards

if the sum of the cash flows of a non-normal project is negative and the cash flow at t= 0 is negative, the project must have two MIRRs

false

19
New cards

an MIRR can be calculated for a project even though the project has all negative cash flows

false

20
New cards

the MIRR will always be less than the IRR because of the reinvestment rate difference

false

21
New cards

as the cost of capital approaches infinity for a non-normal project, the NPV of that project will approach its t=0 cash flow value; this also holds true for a project with normal cash flows

true

22
New cards

if two equal-sized and equal-length profitable normal projects are mutually exclusive, MIRR will definitely agree with NPV as to which project to choose

true

23
New cards

if a project is profitable, all 3 primary methods (NPV, IRR, and MIRR) will agree that it is profitable

true

24
New cards

if a project with normal cash flows has a positive NPV, it will definitely have an MIRR less than the cost of capital

false

25
New cards

if a project with normal cash flows has an IRR that is greater than the cost of capital, then taking on that project would decrease the value of the firm

false

26
New cards

if a profitable project has normal cash flows, then the MIRR has to be greater than the IRR if the project has positive interim cash flows

false

27
New cards

if a project with normal cash flows does not have any interim cash flows, the project’s IRR with equal the project’s MIRR, whether the project is profitable or not

true

28
New cards

if a project has nonnormal cash flows, it can occasionally have multiple MIRRs

false

29
New cards

if the NPV for a project with normal cash flows is positive, then both MIRR and IRR will be greater than the cost of capital

true

30
New cards

The payback method does not consider time value of money

true

31
New cards

the MIRR method does not always choose the better of two mutually exclusive project if the projects are different in size

true

32
New cards

the discounted payback method considers time value of money

true

33
New cards

the IRR of a project will increase if the firm’s cost of capital increase

false