Managing Production/Operations and Outbound Logistics

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/49

flashcard set

Earn XP

Description and Tags

Comprehensive vocabulary flashcards covering operations management, productivity, quantitative and qualitative forecasting, scheduling, work study, and outbound logistics from Chapter 11.

50 Terms

1
New cards

Production

The creation (manufacturing) of goods and services via a process of transformation of resources into desired outputs.

2
New cards

Operations Management

The set of activities designed to manage the direct resources required to create goods and services.

3
New cards

Efficiency

How well a task is performed, using the least resources and with a minimum amount of waste (doing a job well).

4
New cards

Effectiveness

Developing and using the correct manufacturing strategy in order to do the right thing.

5
New cards

Productivity

The ratio of output (products and services) divided by one or more resource inputs (such as land, labour, capital, and management).

6
New cards

Total Productivity

Output relative to the five major resource inputs of a business: OutputLabour+capital+materials+entrepreneurship+knowledge\frac{\text{Output}}{\text{Labour} + \text{capital} + \text{materials} + \text{entrepreneurship} + \text{knowledge}}.

7
New cards

Partial Productivity Measures

Measures that calculate output relative to only one, two, or three inputs (such as output per labour hour, tons shipped per employee, or units produced per kilowatt hour).

8
New cards

Long-Term Production and Operations Planning

Futuristic decision-making covering aspects such as the location selection and size of the operating unit, business size, optimal production quantities, layout design, product design, technology, machinery, and job design.

9
New cards

Medium-Term Production and Operations Activities

Operations management decision-making covering a period of between one and five years, concerned with inventory management, sales forecasts, developing the production plan, production and quality control, and the production budget.

10
New cards

Short-Term Production and Operations Activities

Day-to-day activities covering a period spanning from one day to less than one year, dealing with compiling and implementing the work plan, materials management, quality control, maintenance, replacement, and worker safety.

11
New cards

Forecasting

Both an art and a science that attempts to predict future events as accurately as possible, using historical data, mathematical models, and extrapolation.

12
New cards

Sales Forecast

An estimate of consumer demand that projects future achievable sales revenue, also known as the sales budget, which forms the foundation of a business plan.

13
New cards

Quantitative Forecasting

A forecasting approach using mathematical models that rely on historical data and/or causal variables to forecast demand.

14
New cards

Qualitative Forecasting

A subjective forecasting approach that incorporates factors such as the decision-maker's intuition, emotions, personal experiences, and value system.

15
New cards

Naïve Approach

A quantitative forecasting technique that assumes historical performance will be repeated, implying that demand in the next period will equal demand in the immediately preceding period.

16
New cards

Moving Averages

A quantitative forecasting method that calculates an average of past-period data for a specific time series (nn periods) to smooth out short-term irregularities and forecast the next period's demand.

17
New cards

Exponential Smoothing

A time-series forecasting method that uses only the most recent forecast and actual value along with a smoothing constant or alpha (αt\alpha_t) between 00 and 11: Ft=Ft−1+αt(At−1−Ft−1)F_t = F_{t-1} + \alpha_t (A_{t-1} - F_{t-1}).

18
New cards

Linear Regression Analysis

A straight-line mathematical causal model describing functional relationships between independent variables and a dependent response variable (such as sales).

19
New cards

Delphi Method

A qualitative forecasting approach that relies on a panel of experts whose feedback is collected, statistically summarised, and deliberated across several rounds until consensus is reached.

20
New cards

Production Plan

A master scheduling document based on demand forecasts that incorporates a production units budget and a production costs budget.

21
New cards

Production Units Budget

A budget expressing predicted product demand in quantitative terms, calculated as budgeted sales volume plus closing inventory minus opening inventory.

22
New cards

Production Costs Budget

A budget that makes provision for costs arising from planned production volume, comprising direct raw materials, direct labour, and general manufacturing costs budgets.

23
New cards

Routing

The documentation of the path of raw materials through the production process on a routing sheet, detailing operations, sequence, setup and run times, personnel, inspection, and scrap rates.

24
New cards

Loading

Assigning tasks to work or processing centres to minimise costs, idle time, or completion times, based on available machine capacity and required human skills.

25
New cards

Scheduling

Assigning due dates to specific jobs to establish the timing of operations and match operations with capacity and performance.

26
New cards

Forward Scheduling

A scheduling category where production activities begin as soon as job requirements are received and delivery dates are calculated in advance.

27
New cards

Backward Scheduling

A scheduling category that begins with the final due date and schedules operations in reverse order by subtracting lead times to determine the start time.

28
New cards

Dispatching

The final release of job orders to workers for completion according to a planned sequence or established priority rules.

29
New cards

Expediting

Devoting special attention and shifting workstation priorities to speed up an unsatisfactory or urgent job ahead of others (frowned upon in a JIT environment).

30
New cards

Total Quality Management (TQM)

A quality assurance management philosophy that permeates every action and intent of the firm to meet the predetermined quality standards of the customer.

31
New cards

Organising

The process of combining individuals, groups, and facilities into a formal structure of tasks, authority, and information relationships.

32
New cards

Waiting Line Theory (Queuing)

An optimisation approach used for capacity decisions that balances customer waiting time against system utilisation.

33
New cards

Linear Programming

A mathematical modelling technique used for optimisation comprising linear relationships for resource trade-offs and a single objective function evaluated under resource restrictions.

34
New cards

Simulation

Solving an operational problem by re-enacting real-world activities, often using computers, to optimise scheduling and capacity.

35
New cards

Breakeven Analysis

An optimisation technique used to calculate the point where total production cost equals sales revenue (income).

36
New cards

Programme Evaluation and Review Technique (PERT)

A project management technique using network diagrams or flow sheets to determine the critical path through several activities.

37
New cards

Quality Circles

Small groups of employees who regularly meet voluntarily to analyse work-related issues and improve operations, quality, safety, and productivity.

38
New cards

Gantt Chart

A horizontal bar chart used in operations or project scheduling showing required activities alongside their starting and finishing times.

39
New cards

Work Study

A detailed, systematic, and critical analysis of all variables affecting the efficiency and economy of a work situation in order to eliminate waste and make improvements.

40
New cards

Method Study

A component of work study that systematically records and critically evaluates existing and proposed methods of performing a task to determine easiest and most effective methods.

41
New cards

Work Measurement

The application of techniques designed to establish the time for a qualified worker to carry out a specified job at a defined level of performance.

42
New cards

Standard Time

The total allowed time to complete a job under specific circumstances, calculated by summing the basic time and the relaxation allowance.

43
New cards

Basic Time

The time taken by a qualified worker to perform a specified job at a standard performance expressed as an average of the working period.

44
New cards

Relaxation Allowance

A time allowance added to basic time during which a worker has time for personal needs, relaxation, and rest.

45
New cards

Customer Service

The support that businesses offer customers before and after buying products to create an easy and enjoyable experience and establish reliability.

46
New cards

Pre-Transaction Elements

Customer service elements related to corporate policies, organizational structures, or service programmes established before transactions occur.

47
New cards

Transaction Elements

Customer service variables directly involved in performing the physical distribution function, such as product availability and delivery reliability.

48
New cards

Post-Transaction Elements

Customer service elements supportive of the product while in use, including product guarantees, parts and repair service, complaint procedures, and product replacements.

49
New cards

Acceptable Quality Level (AQL)

A service standard threshold that businesses should avoid establishing below 100%100\%, as doing so limits rather than encourages superior performance.

50
New cards

Place (in Outbound Logistics)

The element of the marketing mix where logistics and marketing converge, encompassing customer service levels, transportation, warehousing, inventory holding, and order processing.