MG395 Managing Inventory Quiz

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/19

encourage image

There's no tags or description

Looks like no tags are added yet.

20 Terms

1
New cards

Planning Horizon

The amount of time an organization looks into the future when creating a plan

2
New cards

Why does the Planning Horizon Matter?

It dictates how far ahead resources must be secured and aligns short-term operations with long-term strategic goals

3
New cards

Time Buckets

Specific time intervals (days, hours, weeks, months) used to summarize, group, and track data in forecasting and material requirements planning (MRP)

4
New cards

Limited Quantity (Inventory Systems)

Constrained by physical space or capital

5
New cards

Fixed Quantity/Fixed-Order Quantity (Inventory Systems)

Reorders the same set amount every time stock hits a threshold

6
New cards

Economic Quantity/EOQ (Inventory Systems)

Calculates mathematically optimal order size to minimize total holding and setup costs

7
New cards

Forecasting: Smoothing (How)

By averaging past data using moving averages or exponential smoothing

8
New cards

Forecasting: Smoothing (Why)

To remove random fluctuations (noise) from the data, making underlying trends and patterns easier to see

9
New cards

Periodic Review Approach

An inventory management system where stock levels are checked at fixed time intervals (ex, every Friday). An order is then placed to bring inventory up to a predetermined target level

10
New cards

Reorder Point (ROP)

The specific inventory level that triggers a new order

11
New cards

Reorder Point (ROP) Calculation

ROP = Expected Demand during Lead Time + Safety Stock

12
New cards

Replenishment Triggers

The conditions that initiate a restock
- Continuous Systems Trigger: hitting the reorder point
- Periodic Systems Trigger: the arrival of the scheduled review date

13
New cards

Underage Cost

The cost of stocking out

14
New cards

Underage Cost Calculation

Lost Profit = Selling Price - Cost

15
New cards

Overage Cost

The cost of ordering too much

16
New cards

Overage Cost Calculation

Overage Cost = Cost - Salvage Value

17
New cards

Optimal Order Quantity Calculation

Continuous Inventory: Q = (square root of) 2DS / H
Single-Period Items: Cu / Cu + Co

18
New cards

Dependent Demand

Demand for components driven by the production of finished goods (ex: the wheels needed for a bike)

19
New cards

Independent Demand

Demand for finished goods driven by the external market (ex: a bike)

20
New cards

Safety Stock & Quantity Needed

Extra inventory held as a buffer against demand variability and lead time delays. The amount needed depends on the desired service level (Z-score), lead time length, and standard deviation of demand