1/10
Vocabulary flashcards covering key standards, conventions, sheet references, and markup instructions from the electrical drafting and panel scheduling coordination meeting.
Name | Mastery | Learn | Test | Matching | Spaced | Call with Kai | Chat |
|---|
No analytics yet
Send a link to your students to track their progress
Individual Line Clouding
A drafting method used when a room is not rectangular, allowing the user to trace the room boundary perfectly without overlapping adjacent spaces.
Dedicated Circuit
An electrical circuit reserved for a single piece of equipment (such as a washer or refrigerator) that must explicitly identify the specific device and room number in the panel schedule.
MLB Panel
The panel board located at the bottom of page e zero seven zero two where long load descriptions were getting cut off and turning into dots.
Starting to Ending Room Number Method
A condensing format suggested by David where multiple rooms on a single circuit are identified by only the first room number dash the last room number (e.g., 8001 through the highest room number) to save space in the load description.
Fully Controlled Outlet
A receptacle placed on a dedicated controlled circuit that must be modeled as fully controlled per the master comment, even if shown as half-controlled or unhatched on the markup plan.
October 10 Furniture Plans
The progress set used by Mariam to verify furniture layouts and determine electrical equipment loads when elevations or links do not display them.
Page Seven Zero Seven
The drawing sheet containing the Level 3 double section panels (section 1 and section 2 below P3) used to demonstrate how isolated poles like Pole 7 and Pole 17 should be individually clouded.
Consecutive Pole Clouding
The convention allowing multiple affected panel poles in unbroken numerical sequence (e.g., Poles 35 and 37) to be grouped into one large cloud, whereas non-consecutive modified poles require separate, individual clouds.
Panel Load Description Standard
The established labeling rule requiring drafters to eliminate room names and format entries using only the room number followed by the equipment/item served.
Purple Markups
The markup color selected for questions directed exclusively between Mariam, David, and Divya that the drafting team is instructed to ignore.
WSHP
Water Source Heat Pump equipment whose shared circuit descriptions on Level 2 were shortened in panel schedules due to space limitations.