1
New cards

Forecasted demand

Company’s best estimate of demand during a particular period.

2
New cards

Booked orders

Confirmed customer demand for products.

3
New cards

Master Production Schedule (MPS)

Amount of finished product scheduled to be available for sale at the beginning of each week.

4
New cards

Material Requirements Planning (MRP)

Detailed planning system that uses the production schedule, bill of materials, and inventory data to determine needed components.

5
New cards

Bill of Materials (BOM)

Product structure or recipe showing the components needed to make a finished good.

6
New cards

Independent demand

Demand for finished products that does not depend directly on demand for another item.

7
New cards

Dependent demand

Demand for components determined by the demand for the finished product.

8
New cards

Gross requirements

Total quantity of an item needed before considering inventory already available.

9
New cards

Net requirements

Quantity still needed after considering available inventory and scheduled receipts.

10
New cards

Projected ending inventory

Inventory expected to remain at the end of a planning period.

11
New cards

Scheduled receipts

Previously ordered materials expected to arrive during a particular period.

12
New cards

Planned order receipts

Planned quantity of materials scheduled to arrive in a particular period.

13
New cards

Planned order releases

Planned quantity of materials that must be ordered or started in a particular period to arrive on time.

14
New cards

MRP nervousness

Small change in requirements for an item at the top of a bill of materials causing large changes for lower-level components.

15
New cards

First Come, First Served (FCFS)

Scheduling jobs in the order in which they arrive.

16
New cards

Earliest Due Date (EDD)

Scheduling jobs according to the earliest promised completion date.

17
New cards

Critical Ratio (CR)

Scheduling priority measure calculated by dividing time remaining until due date by remaining processing time.

18
New cards

Enterprise Resource Planning (ERP)

Integrated software system that connects business functions and shares information across an organization.

19
New cards

Customer Relationship Management (CRM)

Information systems and processes used to manage relationships with customers.

20
New cards

Supplier Relationship Management (SRM)

Information systems and processes used to manage relationships with suppliers.

21
New cards

Decision Support Systems (DSS)

Computer-based systems used to analyze, manipulate, and present data to support higher-level decisions.

22
New cards

Network design applications

Applications used to answer long-term questions about facility locations, facility sizes, and transportation networks.

23
New cards

Warehouse and transportation planning systems

Logistics information systems that allocate fixed warehouse or transportation capacity to meet business needs.

24
New cards

Warehouse management and transportation execution systems

Logistics information systems that initiate and control movement of materials between supply chain partners.

25
New cards

Internet of Things (IoT)

Connected physical devices and sensors that collect and exchange data.

26
New cards

Cloud computing

Access to computing services, software, or data storage through remote internet-based resources.

27
New cards

Cybersecurity

Protection of computer systems, networks, and data from unauthorized access or attacks.

28
New cards

Supply chain planning

Information-system activities that support forecasting, coordination, and future resource decisions.

29
New cards

Supply chain execution

Information-system activities that support carrying out and monitoring supply chain operations.

30
New cards

Lean production

Production philosophy focused on minimizing resources and time by continuously removing waste and simplifying processes.

31
New cards

Just-in-Time (JIT)

Production approach that seeks to provide materials when needed rather than holding unnecessary inventory.

32
New cards

Pull system

Production system in which actual downstream demand triggers work and material movement.

33
New cards

Push system

Production approach in which output is scheduled in advance and moved to later stages regardless of immediate downstream demand.

34
New cards

Kanban

Japanese word meaning card, sign, or billboard used to signal work or material movement.

35
New cards

Kanban system

Production control approach using cards, containers, or visual signals to control the flow of goods.

36
New cards

Static Kanban

Kanban approach in which the quantity or size stays fixed despite changes in demand.

37
New cards

Dynamic Kanban

Kanban approach in which the quantity or size changes to match demand.

38
New cards

Transportation waste

Unnecessary movement of products or materials between locations.

39
New cards

Inventory waste

Excess materials, work in process, or finished goods beyond what is needed.

40
New cards

Motion waste

Unnecessary movement by workers or equipment within a process.

41
New cards

Waiting waste

Delays when people, equipment, or materials sit idle.

42
New cards

Overproduction waste

Producing more units or producing earlier than customers need.

43
New cards

Overprocessing waste

Performing more work or processing than the customer requires.

44
New cards

Defects waste

Errors or faulty products that require correction or replacement.

45
New cards

Unused skills waste

Failure to use employees’ knowledge, abilities, or ideas.

46
New cards

TIMWOODS

Mnemonic for the eight lean wastes: transportation, inventory, motion, waiting, overproduction, overprocessing, defects, and unused skills.

47
New cards

Six Sigma

Methodology focused on reducing process variation and defects.

48
New cards

DMAIC

Five-step improvement cycle: Define, Measure, Analyze, Improve, Control.

49
New cards

Lean Six Sigma

Methodology combining Six Sigma tools with lean waste reduction.

50
New cards

Lean supply chain management

Applying lean principles across supply chain activities beyond the production floor.

51
New cards

Logistics management

Planning and controlling forward and reverse movement and storage of goods, services, and related information from origin to consumption.

52
New cards

Forward logistics

Movement of products from the company or supply chain toward the customer.

53
New cards

Reverse logistics

Movement of returned, defective, recyclable, or repairable products back through the supply chain.

54
New cards

Landed cost

Cost of a product plus transportation, warehousing, handling, customs, and other logistics-related costs.

55
New cards

Warehousing

Operations that store, package, repackage, stage, sort, or centralize goods and materials.

56
New cards

Consolidation warehousing

Combining shipments from several nearby sources into larger, more economical loads.

57
New cards

Cross-docking

Receiving large incoming shipments and separating them into smaller outgoing shipments for different demand points.

58
New cards

Break-bulk warehousing

Breaking a large incoming shipment from a single source or manufacturer into smaller outgoing shipments.

59
New cards

Postponement warehousing

Delaying final assembly, packaging, or customization until the latest practical stage.

60
New cards

Light manufacturing

Simple finishing, assembly, labeling, or packaging tasks performed without making a product entirely from scratch.

61
New cards

Weighted center of gravity method

Facility location technique considering the locations and relative importance of multiple demand points.

62
New cards

Perfect order

Customer order delivered on time, complete, undamaged, and with correct documentation.

63
New cards

Highway / truck

Transportation mode with high flexibility and door-to-door delivery.

64
New cards

Water transportation

Transportation mode suited to heavy, bulky shipments over long distances at relatively low unit cost but slow speed.

65
New cards

Air transportation

Fastest major transportation mode for urgent, high-value goods, but generally the most expensive.

66
New cards

Rail transportation

Transportation mode suited to large, heavy loads over long distances, with less delivery flexibility than trucks.

67
New cards

Pipeline transportation

Transportation mode for liquids and gases with continuous flow and high initial infrastructure costs.

68
New cards

Multimodal solution

Transportation solution combining multiple modes while coordinating physical, information, and monetary flows as seamlessly as possible.

69
New cards

Intermodal transportation

Movement of goods by multiple modes while keeping the cargo in the same loading unit or container.

70
New cards

Roadrailer

Specialized trailer or rail car designed to switch quickly between highway and rail transportation.

71
New cards

Inventory carrying costs

Costs associated with storing, financing, insuring, and managing inventory over time.