Vocabulary flashcards covering the Philippine Standards of Professional Practice (SPP 201 through SPP 206), roles of the Project Architect versus Project Manager, and the fundamental elements of Office Project Management.

20 Terms

1
New cards

Comprehensive Architectural Services (CAS)

The extended range of professional architectural services covering Pre-Design (SPP 201), Regular Design (SPP 202), Specialized (SPP 203), Construction (SPP 204-A/B), and Post-Construction (SPP 205) to ensure project viability.

2
New cards

Pre-Design Services (SPP Document 201)

The initial architectural activities performed before actual design to help identify problems, study site and client needs, evaluate feasibility, and develop possible design solutions.

3
New cards

Regular Design Services (SPP Document 202)

The standard sequence of architectural phases consisting of Project Definition, Schematic Design, Design Development, Contract Documents, Bidding / Negotiation, and Construction.

4
New cards

RA 9266 Foreign Architect Compliance

The legal mandate requiring foreign architects practicing in the Philippines to secure a Temporary/Special Permit (TSP), a DOLE work permit, and partner with a local Registered and Licensed Architect (RLA).

5
New cards

Specialized Architectural Services (SPP Document 203)

Expertise-focused design services within and outside a building that enhance its interior, exterior, systems, or performance beyond standard regular design.

6
New cards

Full-Time Supervision Services (SPP 204-A)

Continuous on-site supervision during construction focused on conformity and workmanship, utilized when close field presence is the primary requirement.

7
New cards

Construction Management Services (SPP 204-B)

Broader delivery oversight during construction that controls cost, schedule, and quality, primarily intended for complex project teams, multiple packages, or phased delivery.

8
New cards

Post-Construction Services (SPP Document 205)

Services that take place following project completion, encompassing Building and Facilities Administration and Post-Construction Evaluation.

9
New cards

Project Management (SPP Document 206)

Management activities over and above normal architectural and engineering (A&E) services carried out across pre-design, design, and construction to exercise overall control over time, cost, and quality.

10
New cards

Project Manager (PM)

A professional or firm operating within the Owner-Architect-Engineer-Contractor team whose primary responsibility is overall cost control, planning, scheduling, and advising on materials and construction methods.

11
New cards

Project Architect

The professional primarily focused on the design and creative aspects of a project, responsible for overseeing architectural elements and developing detailed drawings and plans.

12
New cards

Project Manager Compensation (1979 UAP Docs)

Compensation calculated on a percentage basis ranging from 2% to 5% of the estimated Project Cost.

13
New cards

Architectural Management

The strategic management of a design firm's business and projects to balance high design quality with commercial profitability.

14
New cards

Office Project Management

The internal practice within an architectural firm to plan, organize, and oversee the execution of architectural projects from inception through final completion.

15
New cards

Design Management

A core pillar of architectural management focusing on concept development, multidisciplinary design coordination, and Building Information Modeling (BIM).

16
New cards

Practice Management

The administration of the business side of an architectural firm, encompassing business operations, client relations, legal and regulatory compliance, and human resources.

17
New cards

Building Information Modeling (BIM)

Digital tools and processes utilized within design management to facilitate design development, 3D visualization, and interdisciplinary coordination.

18
New cards

Form and Space

A fundamental architectural element pertaining to the physical space, volume, and enclosure of a building and its interior areas.

19
New cards

Context (Architectural Element)

A fundamental architectural element that evaluates and defines how a proposed building relates to and integrates with its surrounding environment.

20
New cards

Inter-Professional Relationships

Collaborative interactions among multidisciplinary stakeholders that foster enhanced communication, efficiency, trust, and problem-solving while minimizing project conflicts.