1
New cards

Production processes

Are used to make any manufactured item

  1. Source the parts needed

  2. Make the product

  3. Deliver the product


2
New cards

Lead time

The time needed to respond to a customer order

3
New cards

Customer order decoupling point

Where inventory is positioned to allow entities in the supply chain to operate independently

4
New cards

Lean manufacturing

A means of achieving high levels of customer service with minimal inventory investment

5
New cards

Make-to-Stock Production Process

Serve customers from finished goods inventory (e.g. commodity): standardized; Essential issue in satisfying customers is to balance the level of inventory against the level of customer service

6
New cards

Assemble-to-Order Production Processes

Combine a number of preassembled modules to meet a customer’s specifications (e.g., pizza crust); Define a customer’s order in terms of alternative components since these are carried in eventory

7
New cards

Make-to-Order

Make the customer’s product from raw materials, parts, and components (e.g., Dell computer): Customized (differentiation strategy)

8
New cards

Engineer-to-Order

Work with the customer to design and then make the product (e.g., Boeing)

9
New cards

Production Process Mapping

Develop a high-level map of a supply chain process; Useful to understand how material flows and where inventory is held

10
New cards

Little’s Law

Describes the flow of items through a production process

11
New cards

Inventory equation

Inventory = Throughput rate x Flow time

12
New cards

Throughput

Long term average rate of flow through the process

13
New cards

Flow time

Time for a single unit to traverse the entire process

14
New cards

Inventory

Materials held by the firm for future use

15
New cards

Total average value of inventory

The sum of the value (at cost) of the raw material, WIP, and FG inventory

16
New cards

Inventory turns

The cost of goods sold divided by the average inventory value; not particularly useful for evaluating the performance of a process

17
New cards

Days of supply

The inverse of inventory turns scaled to days

18
New cards

Project

The product remains in a fixed location, equipment is moved to the product

19
New cards

Workcenter (job shop)

Similiar equipment or functions are grouped together

20
New cards

Manufacturing cell

A dedicated area where products that are similar in processing requirements are produced

21
New cards

Assembly line

Work processes are arranged to the progressive steps by which the product is made

22
New cards
23
New cards

Product characteristics

  • One of a kind

  • Low volume-low standardization

  • Multiple products, low volume

  • Few major products, higher volume

  • High volume-high standardization, commodity product


24
New cards

Process characteristics

  • No flow

  • Jumbled flow (job shop)

  • Disconnected line flow (batch)

  • Connected line flow (assembly line)

  • Continuous flow


25
New cards

Project layout

  • Product remains in a fixed location

  • A high degree of task ordering is common

  • A project layout may be developed by arranging materials according to their assembly priority


26
New cards

Workcenter

  • The most common approach to developing this type of layout is to arrange these in a way that optimized the movement of material

  • Drilling, grinding, and painting

  • Optimal placement often means placing these with large interdepartmental traffic adjacent to each other

  • Minimize moving and waiting time

  • Sometimes is referred to as a department and is focused on a particular type of operation


27
New cards

Manufacturing cell

Formed by allocating dissimilar machines to cells that are designed to work on similar products (shape, processing, etc)

28
New cards

Assembly line and continuous layout

Designed for the special purpose of building a product by going through a series of progressive steps

29
New cards

Production system designs

  • Project layout

  • Workcenter

  • Manufacturing cell

  • Assembly line and continuous layout


30
New cards

Manufacturing cell development

  1. Group parts into families that follow a common sequence of steps

  2. Identify dominant flow patterns for each part family

  3. Machines and the associated processes are physically regrouped into cells


31
New cards

Workstation cycle time

A uniform time interval in which a moving conveyor passes a series of workstations; also the time between successive units coming off the line

32
New cards

Assembly-line balancing

Assigning tasks so a series of workstations to that the required cycle time is met and idle time is minimized

33
New cards

Precedence relationship

The order in which tasks must be performed in an assembly process

34
New cards

Assembly line balancing procedure

  1. Specify the sequential relationships among tasks

  2. Determine the required workstation cycle time

  3. Determine the theoretical minimum number of workstations

  4. Assign tasks, one a time, until the sum of the tasks is equal to the workstation cycle time (the actual # of workstations)

  5. Evaluate the efficiency of the balance

  6. Rebalance if needed


35
New cards

Mixed-Model line balancing

Means of scheduling the varied production; most factories produce a number of different products

36
New cards

Break even analysis

  • A means of choosing between two options

  • A way to understand how profits and losses change for each option as the total number of units varies

  • Particularly suitable when processes have a significant initial investment (fixed cost) and when production costs vary in proportion to the number of units produced (variable costs)

  • Total revenue recieved = all costs associated