1/84
Looks like no tags are added yet.
project
a series of related activities designed to accomplish a major, non-routine objective.
project management
planning, directing, and controlling resources to complete a project while meeting time, cost, and performance requirements.
pure project structure
a dedicated team works full-time on a project under one project manager.
ex: a construction company assigns a team exclusively to build a hospital.
functional project structure
a project is managed within one department, usually using employees who also have other responsibilities
ex: the marketing department handles a new advertising campaign
matrix project structure
employees from different departments work together on a project and may report to multiple managers.
ex: finance, marketing and operations employees collaborate on a product launch
statement of work
a written description of the objectives that a project must achieve
work breakdown structure
divides a large project into smaller tasks, subtasks, and work packages.
ex: building a restaurant is divided into construction, hiring, equipment installation, and training.
work package
a group of related activities assigned to one organizational unit or team
project milestone
a significant event or achievement during a project
gantt chart
a visual schedule showing when project activities start, finish, and overlap.
precedence diagram
a network diagram showing the order of activities and which activities must be completed before others begin.
ex: a building must be constructed before equipment can be installed.
critical path
the longest duration path through a project network. it determines the shortest time needed to complete the project.
early start
the earliest time an activity can begin based on the completion of its predecessors.
early finish
the earliest time an activity can finish.
ef = es + activity duration
late start
the latest an activity can begin without project completion.
late finish
the latest an activity can finish without delaying project completion
forward pass
a method used to calculate early start and early finish.
when multiple activities must finish before the next begins, use the largest predecessors EF.
backward pass
a method used to calculate late start and late finish.
important: when an activity has multiple successors, use the smallest successor LS.
slack
The amount of time an activity can be delayed without delaying the overall project.
LS - ES or LF - EF.
critical activity
An activity with zero slack. Delaying it can delay the entire project.
noncritical activity
An activity with positive slack, meaning it can be delayed somewhat without affecting project completion.
project crashing
Shortening a project's duration by spending additional resources or money.
Example: Paying employees overtime to finish construction earlier.
crash cost slope
The additional cost required to shorten an activity by one unit of time.
Formula: (Crash Cost − Normal Cost) ÷ (Normal Time − Crash Time)
Example: Spending $600 extra to save three days means $200 per day.
crashing multiple critical paths
When a project has multiple critical paths, all critical paths must be shortened to reduce total project duration.
Example: If two paths both take 20 days, shortening only one path will not reduce the overall project below 20 days.
quality
how well a product or service meets customer needs and expectations.
design quality
Definition: How well a product or service is designed to satisfy customer needs.
conformance quality
Definition: How consistently a product or service meets its design specifications.
Example: Every office chair is assembled correctly according to the design.
specifications
Definition: Targets and acceptable tolerances established by product or service designers.
Example: A bottle must contain between 490 and 510 mL of water.
total quality management
An organization-wide approach emphasizing customer satisfaction, continuous improvement, and everyone's responsibility for quality.
Example: At a restaurant, cooks, cashiers, servers, and managers all contribute to quality.
top management’s quality responsibility
Senior leaders must establish quality priorities, provide resources, and support continuous improvement.
Important: Quality management starts at the top, but everyone participates.
customer focus
Understanding customer needs and designing goods or services to satisfy those needs.
continuous improvement
Constantly analyzing and improving processes to reduce defects, waste, and inefficiency.
Example: A restaurant changes its order-taking process to reduce mistakes.
prevention costs
Costs incurred to prevent defects before they occur.
Examples: Employee training, equipment maintenance, and quality planning.
appraisal costs
Costs incurred to inspect or test products and processes for defects.
Examples: Product inspections and quality testing.
internal failure costs
Costs associated with defects discovered before the product reaches the customer.
Examples: Scrapping damaged products or remaking an incorrect order before serving it.
external failure costs
Costs associated with defects discovered after reaching the customer.
Examples: Refunds, warranties, and lost customers.
traditional cost-of-quality view
Assumes total quality costs are minimized at an optimal quality level that still allows some defects.
Perfect quality is NOT worth the cost. A few defects are acceptable if eliminating them costs more than fixing them.
contemporary cost of quality view
Suggests total quality costs can be minimized near zero defects through continuous improvement and prevention.
Important: A steady investment in prevention reduces costly failures.
six sigma
A quality management approach focused on reducing defects and process variation to achieve consistent performance.
pareto chart
A bar chart that ranks problems from most frequent to least frequent to identify the biggest issues.
Example: A restaurant discovers that late orders cause most customer complaints.
Cause-and-Effect (Fishbone) Diagram
A diagram that organizes possible causes of a problem to help identify its root causes.
Example: Investigating whether late deliveries are caused by staffing, equipment, or transportation.
checksheet
A simple form used to record and count how frequently events or problems occur.
Example: Employees make tally marks whenever an order is incorrect.
statistical quality control
Using statistical techniques to measure, monitor, and manage variation in the quality of products or services.
common cause variation
Natural or random variation that is inherent in a process.
Example: Slight differences in pizza cooking times under normal conditions.
assignable cause variation
Variation caused by a specific, identifiable factor that can be investigated and managed.
Example: A malfunctioning oven causes pizzas to burn.
process capability
The ability of a process to consistently produce outputs that meet customer or design specifications.
process limits
the range of variation a process naturally produces
boundaries that tell you what is considered acceptable or normal for a process.
In simple terms, they show how much a process is allowed to vary before something may be wrong.
example:
Imagine a boba tea machine is designed to fill cups with 16 oz of tea.
Because machines aren't always perfect, some cups might have 15.8 oz, while others might have 16.2 oz.
The process naturally varies between 15 oz and 17 oz.
Lower process limit: 15 oz
Upper process limit: 17 oz
As long as the machine is consistently filling cups within that range, the process is behaving normally.
But if one cup suddenly has 19 oz, that is outside the process limits. The manager should investigate why the machine is dispensing too much tea.
statistical process control
monitoring a process over time using statistical techniques to identify unusual variation.
example: monitoring daily bottle fill volumes to identify equipment problems.
process capability index (cpk)
Measures process capability while accounting for whether the process is centered within specification limits
Basically, it tells you how capable a business is of making products correctly without defects.
Important: A process can have a high Cp but low Cpk if its average is shifted toward one specification limit.
example:
Imagine your shop has a machine that fills cups.
The acceptable amount is 15–17 oz.
The target is 16 oz.
You notice the machine usually fills cups around 16.8 oz.
Even though the machine is consistent, it's filling cups very close to the upper limit of 17 oz.
What does Cpk tell you?
It tells you whether the machine is:
Consistent enough (not varying too much).
Properly centered between the acceptable limits.
moment of truth
an interaction between a customer and service provider that influences the customer’s opinion of the service.
a cashier greeting a customer and taking an order
reliability
the ability to perform a promised service accurately and dependably.
delivering the correct food order every time.
responsiveness
The willingness to help customers promptly.
Example: Quickly responding when a customer needs assistance.
assurance
Employees' knowledge, courtesy, and ability to inspire trust and confidence.
Example: A knowledgeable bank employee confidently explaining financial services
empathy
Showing customers individualized attention, care, and understanding.
Example: Helping a customer who has special dietary restrictions.
tangibles
The physical facilities, equipment, appearance, and materials associated with a service.
Example: Clean dining tables and professional employee uniforms.
servqual
A service-quality measurement tool that compares customer expectations with customer perceptions.
Important: Measures reliability, responsiveness, assurance, empathy, and tangibles.`
Positive SERVQUAL Gap
Occurs when perceived service exceeds expected service.
Example: A customer expects average service but receives outstanding service.
Negative SERVQUAL Gap
Occurs when perceived service falls below expected service.
Example: A customer expects a 10-minute wait but waits 30 minutes.
walk through audit (wta)
Evaluating a service process step by step from the customer's perspective.
Example: A restaurant manager experiences the ordering process as if they were a customer to identify problems.
unconditional service guarantee
A promise to correct service failures without restrictive conditions.
Five features: Unconditional, understandable, meaningful, easy to invoke, and easy to collect.
Example: A restaurant offers a refund if customers are dissatisfied with their meal.
service recovery
Actions taken to correct a service failure and restore customer satisfaction.
Example: Apologizing for an incorrect order, replacing it, and offering a refund.
server task error
A service failure caused by performing a task incorrectly.
Example: Preparing a customer's order incorrectly.
server treatment error
A service failure caused by treating a customer poorly.
Example: An employee ignores a customer's complaint.
server tangible error
A service failure involving the physical appearance or condition of the service.
Example: An employee wearing a dirty uniform.
forecasting
Estimating future outcomes using historical information, mathematical models, or judgment.
Example: A restaurant predicts how many pizzas it will sell tomorrow.
qualitative forecasting
Forecasting based on opinions, experience, and expert judgment rather than numerical models.
Example: Asking industry experts to estimate demand for a new product.
quantitative forecasting
Forecasting using historical numerical data and mathematical models.
Example: Using sales figures from previous months to predict next month's sales.
time series forecasting
Using historical patterns of a variable to predict future values.
Example: Predicting next month's sales based on previous monthly sales.
casual forecasting
Predicting an outcome based on variables believed to influence it.
Example: Using temperature to predict ice cream sales.
naive forecasting
A method that assumes the next period's demand will equal the most recent actual demand.
Example: If this week's sales were 200 units, next week's forecast is 200 units.
simple moving average
A forecasting method that averages demand over a specified number of previous periods.
Example: Sales of 100, 120, and 140 produce a three-period moving average of 120.
helps you predict the FUTURE
weighted moving average
A forecasting method that assigns different weights to historical observations.
Example: Giving the most recent month greater importance than older months.
exponential smoothing
A forecasting method that adjusts the previous forecast using recent actual demand and a smoothing constant.
Formula: New Forecast = Previous Forecast + α(Actual − Previous Forecast)
smoothing constant (alpha)
A value between 0 and 1 that controls how quickly exponential smoothing responds to new demand.
Important: Higher alpha responds faster to recent changes. Lower alpha produces smoother forecasts.
trend
A long-term increase or decrease in demand over time.
Example: A company's annual sales consistently increasing.
seasonality
A predictable pattern in demand that repeats at regular intervals.
Example: Ice cream sales increasing during summer months.
cyclical variation
Longer-term changes in demand associated with economic or business cycles.
Example: Car sales declining during a recession.
random variation in demand
Unpredictable changes in demand that cannot be explained by a regular pattern.
Example: An unexpected large customer order.
forecast error
The difference between actual demand and forecast demand.
Formula: Actual − Forecast
Example: Actual demand 120 and forecast 100 gives an error of +20.
positive and negative forecast error
A positive error means demand was underforecasted; a negative error means demand was overforecasted.
Example: Actual 120 versus forecast 100 = +20; actual 80 versus forecast 100 = −20.
cumulative forecast error
The running algebraic sum of forecast errors over multiple periods.
Formula = Sum of (Actual − Forecast)
Example: Errors of +10, −5, and +8 produce CFE = +13.
this is the same thing as RSFE
MAD
Average absolute forecast error; smaller MAD indicates greater accuracy.
measures how BIG your mistakes are.
MAPE
Average absolute forecast error expressed as a percentage of actual demand.
measures how far off your forecasts are on average, expressed as a percentage.
tracking signal
tells you whether your forecasts are consistently too high or too low.
Basically, it checks whether your forecasting method is making the same mistake over and over.
CFE divided by MAD; helps detect accumulating forecast bias.
forecast bias
A persistent tendency to overforecast or underforecast demand.