1) Planning
The first SDLC phase; focuses on understanding why an information system should be built and determining how the project team will build it.
1.1 Project Initiation
A planning step that identifies the system’s business value, creates a system request or vision document, and conducts a feasibility analysis.
1.2 Project Management
A planning step that involves creating and managing the project plan.
1.3 Technical Feasibility
Determines whether the organization has the technical ability and resources to build the system; asks, “Can we build it?”
1.4 Economic Feasibility
Determines whether the system will provide enough business value to justify its costs; asks, “Should we build it?”
1.5 Organizational Feasibility
Determines whether the system will be accepted and used by the organization and its stakeholders; asks, “If we build it, will it be used?”
2) Analysis
The SDLC phase that determines who will use the system, what the system will do, and where and when it will be used.
2.1 Analysis Strategy
The first analysis step; involves understanding the current situation and problems and envisioning ways to create a new system.
2.2 Requirements Gathering
The analysis step that collects information about system needs through interviews, group workshops, or questionnaires.
2.3 Business Analysis Models
Models created during analysis to represent and understand business processes and system requirements.
2.4 System Proposal
The major output of the analysis phase that summarizes the proposed system and its requirements.
3) Design
The SDLC phase that determines how the system will operate, including its infrastructure, user interface, programs, databases, and files.
3.1 Design Strategy
The design step that determines whether the system will be developed internally, outsourced, or purchased.
3.2 Architecture Design
The design step that specifies the system’s hardware, software, network infrastructure, and interface design.
3.3 Database and File Specifications
The design step that defines how data will be organized and stored.
3.4 Program Design
The design step that specifies how individual programs or software components will function.
4) Implementation
The SDLC phase in which the system is built, tested, installed, and supported.
4.1 System Construction
The implementation step in which the system is built and tested.
4.2 System Installation
The implementation step in which the old system is turned off and the new system is turned on.
4.3 System Support
Ongoing support provided after the system has been installed.