What does CM stand for?

Configuration Management

2
New cards

What’s the main goal of CM?

Keeping the product and its documentation matching at all times

3
New cards

What does CM control?

Changes to a product’s performance, functional, and physical characteristics

4
New cards

When is CM applied?

Throughout the product’s life cycle

5
New cards

How many CM functions does the EIA-649 define?

Five

6
New cards

Which CM function describes the CM plan?

Planning and Management

7
New cards

What does a CM plan describe?

What activities, schedules, baselines, approvals, and audits will be done

8
New cards

Which CM function assigns unique IDs to CIs?

Configuration Identification

9
New cards

Which CM function defines baselines?

Configuration Identification

10
New cards

Which CM function approves or rejects changes?

Configuration change management

11
New cards

Which CM function records current and past versions of every item?

Configuration Status Accounting

12
New cards

Which CM function checks that the product matches its documentation?

Configuration Verification and Audit

13
New cards

Configuration Item (CI)

Any item tracked under CM. Could be software, hardware, or a document.

14
New cards

According to EIA-649, why does CM matter?

Poor CM can release incorrect, ineffective, or unsafe products

15
New cards

How does CM benefit stakeholders?

Gives them current data to make decisions from

16
New cards

Baseline

An approved snapshot of a configuration at a point in time

17
New cards

How can a baseline be changed?

Through formal change control

18
New cards

What is an approved baseline used for?

Reference point where all changes are measured against

19
New cards

How many baselines does the DoD use?

Three

20
New cards

What are the baselines the DoD uses?

Functional, allocated, product

21
New cards

How many baselines does NASA use?

Four

22
New cards

What are the baselines that NASA uses?

Functional, allocated, product, as-deployed

23
New cards

What does the functional baseline describe?

What the whole system does. Describes expectations of performance, interfaces, and how it would be verified

24
New cards

What does the allocated baseline describe?

Requirements assigned to each CI

25
New cards

What does the product baseline describe?

Detailed documentation required to build and support each CI

26
New cards

What does the as-deployed baseline describe?

Final configuration in its ready to operate state, with all changes incorporated

27
New cards

Where is the functional baseline set?

SDR (NASA)/SFR (DoD)

28
New cards

Where is the allocated baseline set?

PDR

29
New cards

Where is the product baseline set?

CDR

30
New cards

Where is the as-deployed baseline set?

ORR

31
New cards

Which baseline covers form, fit, and function details?

Product baseline

32
New cards

Which baseline breaks top-level requirements down to each CI?

Allocated baseline

33
New cards

What does SRR stand for?

System Requirements Review

34
New cards

What does SDR stand for?

System Definition Review

35
New cards

What does SDR stand for?

System Definition Review

36
New cards

What does SFR stand for?

System Functional Review

37
New cards

What does PDR stand for?

Preliminary Design Review

38
New cards

What does CDR stand for?

Critical Design Review

39
New cards

What does ORR stand for?

Operational Readiness Review

40
New cards

What order do the reviews go in?

SRR, SDR/SFR, PDR, CDR, ORR

41
New cards

What’s the question that SRR answers?

Do we know exactly what the system must do?

42
New cards

What’s the question that SDR/SFR answers?

Does the overall plan meet the requirements?

43
New cards

What’s the question that PDR answers?

Is the design approach sound for each part?

44
New cards

What’s the question that CDR answers?

Is the detailed design complete enough to build?

45
New cards

What’s the question that ORR answers?

Is it built, tested, and ready to operate?

46
New cards

What is PDR?

Making sure the approach is right

47
New cards

What is CDR?

The details are done and it’s ready to build

48
New cards

What does BOM stand for?

Bill of Materials

49
New cards

What is a BOM?

The structured list of every part, assembly, and document needed to build a product

50
New cards

What does EBOM stand for?

Engineering Bill of Materials

51
New cards

What does MBOM stand for?

Manufacturing Bill of Materials

52
New cards

What are the fields in a BOM?

Level, part number, name, description, quantity, unit of measure, revision

53
New cards

What is a BOM level?

Where a part sits in the hierarchy

54
New cards

What are the levels in part hierarchy?

top assembly, subassembly, or component

55
New cards

What is a multi-level (indented) BOM?

shows assemblies and the subassemblies and parts inside them

56
New cards

Why share only the latest released BOM revision?

So suppliers and manufacturing don't build from outdated parts lists

57
New cards

What is a revision?

A new approved version of an item or document

58
New cards

What is a release?

Making an approved version official and available for use

59
New cards

What does ECR stand for?

Engineering Change Request

60
New cards

What does ECO stand for?

Engineering Change Order

61
New cards

What does ECN stand for?

Engineering Change Notice

62
New cards

What does ECP stand for?

Engineering Change Proposal

63
New cards

What is the purpose of an ECR?

Proposes a change and explains why it's needed

64
New cards

What is the purpose of an ECO?

Formal review and approval of a proposed change

65
New cards

What is the purpose of an ECN?

Communicates that an approved change is happening

66
New cards

What does CCB stand for?

Configuration Change Board

67
New cards

What does the CCB do?

Approves or rejects proposed changes

68
New cards

Who is the chair of the CCB?

Someone with program or project change authority

69
New cards

Who sits on a CCB?

Representatives of the stakeholders affected by changes

70
New cards

What’s the first step in the change process?

Proposing the change

71
New cards

What’s the second step in the change process?

Evaluating the impact of the change on cost, schedule, and other items

72
New cards

What’s the third step in the change process?

The CCB approves/denies changes

73
New cards

What’s the fourth step in the change process?

Implement and release it as a new revision

74
New cards

What’s the fifth step in the change process?

Verify the change was made correctly

75
New cards

What’s the sixth step in the change process?

Update the records

76
New cards

What does a major change affect?

spec, cost, safety, interfaces, or interchangeability

77
New cards

What does a minor change affect?

documentation or processes without affecting interchangeability

78
New cards

What’s the DoD term for a major change?

Class I

79
New cards

What’s the DoD term for a minor change?

Class II

80
New cards

What’s a waiver?

Permission to accept something that doesn't meet a requirement

81
New cards

Do waivers change the baseline?

No

82
New cards

What is a deviation?

Permission to depart from a requirement

83
New cards

When do deviations go into effect?

Before the work is done

84
New cards

When do waivers go into effect?

after or during implementation

85
New cards

What is effectivity?

The point where a change takes effect, by serial number, date, or lot

86
New cards

What is form?

An item's shape, size, and physical characteristics

87
New cards

What is fit?

How an item connects or interfaces with other items

88
New cards

What is function?

What an item does

89
New cards

What kind of change affects form, fit, or function?

A major change

90
New cards

Who must approve a change to an external interface?

All affected stakeholders

91
New cards

What does FCA stand for?

Functional Configuration Audit

92
New cards

What does PCA stand for?

Physical Configuration Audit

93
New cards

What question does the FCA answer?

Does the item perform as its requirements say?

94
New cards

What question does the PCA answer?

Does the item built match its documentation?

95
New cards

What is As-Designed?

What the documentation says the product is

96
New cards

What is As-built?

What was actually made

97
New cards

What does the CM keep matching?

The as-designed and as-built configurations

98
New cards

What is a redline?

hand-marked change on a drawing, waiting to be formally incorporated

99
New cards

What is status accounting?

records what the configuration is

100
New cards

What is an audit?

checks that records are true