Internal Challanges
Corporate Objectives
Sales/Marketing Goals
External Challanges
NEW MARKET ENTRANTS
CUSTOMERS
COMPETITION (GLOBALLY)
PROCUREMENT - SUPPLIER RELATIONSHIPS
3 forms of activity
Value Adding
Non-Value Adding, unavoidable
Non-Value Adding, avoidable
value adding
Any operation customer is willing to pay for
non value adding, unavoidable
ANYTHING THAT IS NECESSARY FOR US TO PERFORM VALUE-ADD OPERATIONS BUT UNAVOIDABLE
non value avoidable
ANY OPERATION THAT THE CUSTOMER IS NOT WILLING TO PAY FOR AND/OR IS NOT NECESSARY
types of production waste
DOWNTIME
D - DEFECTS
O - OVERPRODUCTION
W - WAITING
N - NON-UTILIZED TALENT
T - TRANSPORTATION
I - INVENTORY
M - MOTION
E - EXTRA PROCESSING
functional loss
Equipment failure and setup/adjustment
functional reduction
minor stoppages, speed, quality defects/rework, and yield
equipment failure and setup/adjustment losses
Effect availability
minor stopages and speed losses
Effect performance rate
quality defect and rework; yield
Effect quality rate
OEE
Overall Equipment Effectiveness
Measures the percentage of scheduled production time that was truly productive or a machine/line
3 components of OEE
Availability, performance, and quality
Standard cycle time
It is the observed minimum cycle time that produces quality products while the process is running at the best achievable standard operating conditions. Not mathematically derived
Production Capacity
Demonstrated capacity/OEE
demonstrated capacity
Total good parts
installed capacity
Total Possible Calendar Time / Std. Cycle Time
OEE Benefits
Measure Equipment Performance
Large Capacity Issues into small solvable problems
Stability
Machine View
Operator Usable - Track performance vs Standard
Improvement Project - Root cause, ideas
Value Stream
ANY ACTIVITY THAT IS REQUIRED TO DESIGN, ORDER, PRODUCE, AND DELIVER A PRODUCT TO THE CUSTOMER
3 Components of Value Stream
FLOW OF MATERIALS
TRANSFORMATION OF RAW MATERIALS INTO FINISHED PRODUCT
FLOW OF INFORMATION TO SUPPORT FIRST TWO
Value Stream Mapping
GRAPHICS AND ICONS ARE GROUPED TOGETHER TO ILLUSTRATE THE SEQUENCE AND MOVEMENT OF INFORMATION, MATERIALS, AND ACTIONS WITHIN A VALUE STREAM.
3 Sections of Value Stream Mapping
Information flows (top), material flows (middle), lead time ladder (bottom)
Process of Value Stream Mapping
ONLY WORK WITH A VALUE SIREAM WHERE YOU INTEND TO MAKE AN IMPLEMENIATION.
HAVE ONE PERSON DO THE MAPPING - DON'T SPLIT IT UP.
IT IS IMPORTANT TO LIMIT THE SCOPE OF YOUR WORK TO A SINGLE PRODUCT FAMILY.
Product Family
A GROUP OF PRODUCTS THAT PASS THROUGH SIMILAR PROCESSING STEPS AND THROUGH COMMON EQUIPMENT IN YOUR DOWNSTREAM PROCESSES.
Value Stream Mapping Objectives
FLEXIBLE PROCESSES TO RESPOND QUICKLY TO CHANGING CUSTOMER REQUIREMENTS
SHORTEN LEAD TIME (FROM ORDER TO DELIVERY)
CONNECTED PROCESS WITH FLOW AND PULL
SIMPLIFY THE FLOW OF INFORMATION WITHIN THE VALUE STREAM
A CLEAR UNDERSTANDING OF CUSTOMER REQUIREMENTS; REQUIRED RATE, VOLUME, MIX, SEQUENCE
CREATE A PACE SETTER PROCESS
Value Stream Mapping Benefits
HELPS WITH VISUALIZING BEYOND THE PROCESS LEVEL - SEEING FLOW
HELPS YOU SEE THE SOURCES OF WASTE
PROVIDES A COMMON LANGUAGE FOR TALKING ABOUT MANUFACTURING PROCESSES
HELPS MAKE DECISIONS ABOUT FLOW APPARENT - EASY TO DISCUSS
TIES TOGETHER LEAN CONCEPTS AND TECHNIQUES
CAN BECOME THE BLUEPRINT FOR LEAN IMPLEMENTATION - FUTURE STATE PLAN
SHOWS HOW INFORMATION FLOW AND MATERIAL FLOW ARE LINKED TOGETHER
QUALITATIVE TOOL THAT HELPS IN HOW YOUR FACILITY SHOULD OPERATE TO CREATE FLOW
Value Stream Mapping Tips
USE THE CURRENT STATE MAP ONLY AS A FOUNDATION FOR FUTURE STATE MAP
FUTURE STATE MAP ONLY REPRESENTS THE CONCEPT
FUTURE STATE MAP CREATION NEEDS SO FACILITATION FROM LEAN EXPERT
THE PURPOSE OF MAPPING IS ACTION
DON'T DEVELOP ANY MAP BEFORE ITS TIME
SOMEONE WITH MANAGEMENT CLOUT HAS TO LEAD
PLAN DO CHECK ACT