Hydroelectric and Geothermal Power Plant Review

0.0(0)
Studied by 0 people
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/41

flashcard set

Earn XP

Description and Tags

A comprehensive practice exam based on Sets 22, 23, and 24 covering hydroelectric and geothermal power plant concepts, components, and theoretical laws.

Last updated 6:12 PM on 7/8/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

42 Terms

1
New cards

Which factor defines the specific speed of turbines?

Speed of geometrically similar turbine under unit head

2
New cards
3
New cards
4
New cards

Which turbine has fixed runner blades and adjustable guide vanes?

Francis turbine

5
New cards

Which factor reduces turbine efficiency at part load?

Flow separation and cavitation

6
New cards

Which factor defines hydro plant firm power?

Minimum guaranteed power output

7
New cards

Which type of load can pumped storage plants handle efficiently?

Peak load

8
New cards

Which term defines the energy per unit volume of water?

Pressure head

9
New cards

Which factor defines unit discharge?

Flow per unit head1/2\text{Flow per unit head}^{1/2}

10
New cards

Which term defines head loss due to sudden closure of a penstock valve?

Water hammer

11
New cards

Which parameter defines the unit power of a turbine?

Power per unit head3/2\text{Power per unit head}^{3/2}

12
New cards

Which efficiency relates the ratio of actual energy generated to the maximum possible energy?

Plant utilization factor

13
New cards

Which dam type is recommended for a soft foundation?

Earthen dam

14
New cards

Which type of dam uses upstream arch action to resist water pressure?

Arch dam

15
New cards

What is the primary energy source of a geothermal power plant?

Heat from Earth's interior

16
New cards

Which fluid is expanded in a binary cycle geothermal plant?

Secondary working fluid (e.g., isobutane, pentane)

17
New cards

What is the function of a separator in geothermal plants?

To separate steam from hot water

18
New cards

What is the role of reinjection wells in geothermal systems?

To dispose of spent geothermal fluids back underground

19
New cards

Which type of geothermal reservoir contains steam only?

Vapor-dominated reservoir

20
New cards

Which law governs heat conduction in rocks?

Fourier's law

21
New cards

Which gas besides H2SH_2S is common in geothermal steam?

CO2CO_2

22
New cards

Which region in the Philippines is a major geothermal producer?

Leyte and Bicol

23
New cards

Which geothermal cycle uses an ammonia-water mixture?

Kalina cycle

24
New cards

Which factor defines geothermal gradient?

Rate of temperature increase with depth (expressed in C/km^\circ C/km)

25
New cards

Which process occurs in a reinjection well?

Spent geothermal fluid is returned underground

26
New cards

Which component in geothermal plants prevents turbine overspeed?

Emergency trip valve (ETV)

27
New cards

Which law governs geothermal reservoir pressure decline and fluid flow?

Darcy's law

28
New cards

Which geothermal field is the largest dry steam field?

The Geysers (USA)

29
New cards

Which plant capacity factor is typical for geothermal power plants?

809580\text{--}95\,%

30
New cards

Which efficiency measures the ratio of actual work done to isentropic work in a turbine?

Isentropic efficiency

31
New cards

Which device is used to measure headwater and tailwater levels accurately?

Staff gauge and level recorder

32
New cards

Which standard commonly guides the testing and performance evaluation of hydro-generators?

IEC 60034 series

33
New cards

Which factor governs the selection between Pelton, Francis, and Kaplan turbines?

Net head and discharge

34
New cards

Which type of hydro plant is used for isolated small communities?

Micro-hydro plant (<100kW<100\,kW)

35
New cards

Which aspect of geothermal power production requires artificial stimulation like fracturing?

Enhanced Geothermal System (EGS) or Hot Dry Rock (HDR)

36
New cards

Which environmental concern is significant in geothermal plants due to odor and toxicity?

Hydrogen sulfide (H2SH_2S) emissions

37
New cards

What is the purpose of cement in geothermal well completion?

To prevent casing collapse

38
New cards

Which turbine efficiency is affected by leakage through labyrinth seals or around guide vanes?

Volumetric efficiency

39
New cards

Which parameter governs the selection of binary cycle working fluids?

Boiling point and heat transfer properties

40
New cards

Which factor limits the sustainability of a geothermal reservoir?

Overproduction and inadequate reinjection

41
New cards

Which device extracts non-condensable gases from the condenser?

Steam ejectors or vacuum pumps

42
New cards

Which strategy ensures the long-term sustainability of geothermal reservoirs?

Balanced production and reinjection strategy