Highway Engineering - Chapters 6 to 10 Study Notes

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/48

flashcard set

Earn XP

Description and Tags

Vocabulary flashcards covering key definitions, road components, failure modes, equipment, and airport terminology from Chapters 6 to 10 of Diploma Highway Engineering.

49 Terms

1
New cards

Hill Road

A road constructed in hilly or mountainous terrain characterized by steep, uneven, and unstable ground, requiring significant cutting into the hill and valley filling.

2
New cards

Motor Roads (Hill)

Hill roads designed specifically for vehicular traffic (cars, buses, and trucks) built with regulated width, gradient, and curvature.

3
New cards

Bridle Paths

Narrow tracks designed exclusively for horses, mules, and pedestrians on foot, which cannot accommodate motor vehicles.

4
New cards

Ruling Gradient (Hill Roads)

The normal standard design gradient adopted for hill roads, specified as 1 in 201\text{ in }20 (5%5\%).

5
New cards

Limiting Gradient (Hill Roads)

A steeper hill road gradient of 1 in 16.71\text{ in }16.7 (6%6\%), permitted where providing the ruling gradient results in excessive construction costs.

6
New cards

Exceptional Gradient (Hill Roads)

A steep gradient of 1 in 14.31\text{ in }14.3 (7%7\%), permitted only for short stretches in extremely difficult topography.

7
New cards

Grade Compensation

The reduction in gradient on a horizontal curve calculated as 30+RR%\frac{30 + R}{R}\%, subject to a maximum of 75R%\frac{75}{R}\%, where RR is the radius of the curve in metres.

8
New cards

Retaining Wall

A masonry or concrete structure built on the valley (downhill) side of a hill road to support and prevent the filled earth from sliding down the slope.

9
New cards

Breast Wall

A masonry or concrete wall built on the hill (uphill) side to support the excavated slope face and prevent soil and rock falls onto the road.

10
New cards

Parapet Wall

A low safety barrier constructed along the outer valley edge of the road, commonly painted in alternating black and white bands to guide drivers at night or in fog.

11
New cards

Catch Water Drain

A ditch or scupper constructed uphill above the cut slope, running parallel to the road to intercept slope runoff before it reaches the roadway.

12
New cards

Hairpin Curve

A sharp hill road bend of approximately 180∘180^\circ with a minimum radius of about 14 m14\,\text{m} and a gradient not exceeding 2.5%2.5\%, utilized to gain altitude in a short distance.

13
New cards

Re-entered Curve

A hill road curve that curves inward into the hill following a natural valley or gully (nala), typically requiring a culvert or bridge at the crossing.

14
New cards

Salient Curve

A hill road curve that bends outward around an existing projecting spur or ridge, requiring widened pavement and horn-sounding boards due to restricted sight distance.

15
New cards

Gabions

Stone-filled wire baskets installed as retaining or protective structures to prevent landslides and soil erosion on slopes.

16
New cards

Camber

The transverse cross slope provided on a road surface to facilitate rapid lateral runoff of rainwater away from the centre.

17
New cards

Side Drain

A longitudinal channel running alongside the road edge to collect surface runoff from the carriageway and adjacent cut slopes.

18
New cards

Interceptor Drain

A sub-surface drain installed on the uphill side of a road cut to capture lateral seepage flow before it penetrates the road formation.

19
New cards

Granular Cut-off Layer

A layer of coarse sand or gravel inserted above the water table whose large pore structure arrests the capillary rise of subsurface water into the subgrade.

20
New cards

Bridge

A cross-drainage structure that conveys a road across an obstacle or river, possessing a linear span exceeding 6 m6\,\text{m}.

21
New cards

Culvert

A small cross-drainage structure designed to convey water underneath a road, having a total span of up to 6 m6\,\text{m}.

22
New cards

Causeway

A low-level cross-drainage structure built across a stream bed designed to allow floodwaters to submerge and pass over the roadway during peak flow.

23
New cards

Potholes

Bowl-shaped hollows formed in a flexible pavement surface resulting from moisture ingress, poor mix stability, and repetitive wheel loads.

24
New cards

Corrugation

A flexible pavement defect consisting of transverse wave-like crests and troughs across the road, caused by unstable mix, excess binder, or vehicle braking and starting forces.

25
New cards

Surface Upheaval

The localized upward swelling of pavement layers caused by expansive clay soils, frost action, or trapped moisture below the pavement.

26
New cards

Map (Alligator) Cracks

A network of interconnected cracks resembling alligator hide caused by fatigue failure of the flexible pavement under repetitive heavy wheel loads.

27
New cards

Ruts

Longitudinal depressions formed along the wheel paths of a flexible pavement due to channelized traffic compaction and layer consolidation.

28
New cards

Through Renewal

Periodic flexible pavement maintenance executed every few years involving the application of a complete renewal coat or surface dressing to restore pavement strength.

29
New cards

Scaling

A rigid pavement failure where the surface mortar of the cement concrete slab peels and flakes off in patches due to high water-cement ratio, over-finishing, or de-icing salts.

30
New cards

Mud Pumping

The violent ejection of saturated subgrade soil through joints and cracks in a concrete pavement under the action of heavy moving wheel loads.

31
New cards

Warping Cracks

Cracks developing in rigid pavement slabs caused by curling stresses induced by temperature and moisture gradients between the top and bottom faces.

32
New cards

Blow-ups

The compressive buckling and upward shattering of concrete pavement slabs at expansion joints during hot weather when joints are choked with incompressible debris.

33
New cards

Crawler Tractor

A heavy power unit moving on continuous steel track chains that provides high traction and low ground pressure on soft, muddy, or rough terrain.

34
New cards

Dumper

A heavy-duty, off-road transport truck with a tilting body used exclusively on construction sites and quarries for hauling massive earth or rock loads.

35
New cards

Tipper

A highway-legal transport truck equipped with a hydraulic tipping body designed for high-speed hauling and dumping of bulk materials on public roads.

36
New cards

Scraper

A self-contained earthmoving machine that independently cuts a thin soil layer, loads it into a bowl, hauls, dumps, and spreads the material.

37
New cards

Angle Dozer

A bulldozer configuration whose blade can be set at an angle to the direction of travel to cast excavated material to the side.

38
New cards

Power Shovel

An excavating machine that excavates and loads material situated above the machine's operating track level.

39
New cards

Dragline

A cable-operated excavator equipped with a long lattice boom designed to dig materials situated below its own ground level or under water.

40
New cards

Motor Grader

A machine equipped with a long, adjustable moldboard blade positioned between its axles, used for surface leveling, spreading, ditching, and final profile shaping.

41
New cards

Sheep Foot Roller

A compaction roller equipped with projecting steel feet designed to compact cohesive clay soils from the bottom of the layer upward.

42
New cards

Pneumatic Tyred Roller

A compaction roller equipped with staggered pneumatic rubber tyres that provides a uniform kneading compaction action across soil and bituminous layers.

43
New cards

Road Paver

A specialized paving machine that accepts bituminous mix in a front hopper and spreads, screeds, and partially compacts it to an even thickness.

44
New cards

Aerodrome

A defined area of land or water used for the arrival, departure, and surface movement of aircraft, including all associated infrastructure, buildings, and installations.

45
New cards

Apron

The paved airport zone in front of the terminal building allocated for parking, boarding, baggage loading, fueling, and servicing aircraft.

46
New cards

Runway

A defined paved rectangular strip oriented with the prevailing wind direction, constructed to support the take-off and landing operations of aircraft.

47
New cards

Taxiway

A paved route established for aircraft movement under their own power connecting the runway with aprons, terminals, and hangars.

48
New cards

Hangar

A large enclosed building designed to house, shelter, service, and repair aircraft.

49
New cards

Glider

A lightweight, non-motorized aircraft that sustains flight through aerodynamic lift and ascending air currents.