MGSC 485 Exam 2: Lean Operations, VSM, and Six Sigma Define Tools

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/65

flashcard set

Earn XP

Description and Tags

Comprehensive vocabulary flashcards covering lean manufacturing formulas, production capacity, value stream mapping concepts, inventory models, and Six Sigma Define tools for MGSC 485 Exam 2.

66 Terms

1
New cards

Takt Time

available production time per day divided by daily customer demand.

2
New cards

Pitch

Required production time per finished-goods pack or tray, calculated as takt time multiplied by finished-goods tray or pack size.

3
New cards

Inventory Days

A measure of inventory calculated as inventory units divided by the daily usage of that inventory item.

4
New cards

BOM-Adjusted Inventory Days

Calculated as component inventory divided by the quantity of finished demand multiplied by components per unit.

5
New cards

Total Inventory Flow Time

The sum of raw materials (RM), all work in process (WIP), and finished-goods (FG) inventory days.

6
New cards

Department Capacity Formula


<p></p>
7
New cards

Promised New-Order


<p></p>
8
New cards

Plant Bottleneck Rule

The operational principle that the department with the lowest daily capacity limits plant output.

9
New cards

Adjusted Step

Cycle time×(1+rework fraction)/operators\text{Cycle time} \times (1 + \text{rework fraction}) / \text{operators}

<p>$$\text{Cycle time} \times (1 + \text{rework fraction}) / \text{operators}$$ </p>
10
New cards

Setup Allowance Per Unit

Setup time per batch/batch quantity\text{Setup time per batch} / \text{batch quantity}

<p>$$\text{Setup time per batch} / \text{batch quantity}$$</p>
11
New cards

Cell Capacity (Kaizen 6)

Available time×product of cell uptimes/[sum adjusted step times/total operators+max setup/max batch]\text{Available time} \times \text{product of cell uptimes} / [\text{sum adjusted step times} / \text{total operators} + \text{max setup} / \text{max batch}]

12
New cards

Maximum Followers Rule

An assembly line balancing rule that prioritizes the task with the most downstream followers among eligible fitting tasks.

13
New cards

Ranked Positional Weight (RPW)

The sum of a task's own task time plus the time of every unique downstream follower.

14
New cards

One-Worker Throughput

Available time/sum of all task times\text{Available time} / \text{sum of all task times}

15
New cards

Target Cycle Time

Available production time/target production rate\text{Available production time} / \text{target production rate}

16
New cards

Theoretical Minimum Stations

The rounded-up integer value of total task time/target cycle time\text{total task time} / \text{target cycle time}.

17
New cards

Common Cycle Without Setup

The least common repeating period of product batch intervals.

18
New cards

Common Cycle With Setup (Years)

Total setup hours per cycle/(annual available hours−annual run hours)\text{Total setup hours per cycle} / (\text{annual available hours} - \text{annual run hours})

19
New cards

Economic Order Quantity (EOQ)

2×daily demand×operating days×order costannual unit holding cost\sqrt{\frac{2 \times \text{daily demand} \times \text{operating days} \times \text{order cost}}{\text{annual unit holding cost}}}

20
New cards

Safety Stock (Variable Demand and Lead Time)

z×L×(daily-demand SD)2+(daily demand)2×(lead-time SD)2z \times \sqrt{L \times (\text{daily-demand SD})^2 + (\text{daily demand})^2 \times (\text{lead-time SD})^2}

21
New cards

Reorder Point (ROP)

Daily demand×lead time+safety stock\text{Daily demand} \times \text{lead time} + \text{safety stock}

22
New cards

Inventory Position (Q,R System)

On-hand+on-order−backlogs\text{On-hand} + \text{on-order} - \text{backlogs}; triggers a reorder of EOQ when inventory position is less than or equal to ROP.

23
New cards

Kaizen

Continuous, incremental improvement of processes.

24
New cards

Kaizen Event

A focused effort to identify and implement process improvements.

25
New cards

Value Stream

All activities and flows required to deliver a product or service.

26
New cards

Value Stream Mapping (VSM)

A visual mapping of material and information flows, processing, waiting, and inventory.

27
New cards

Current-State VSM

A value stream map depicting a picture of how the process operates now.

28
New cards

Future-State VSM

A redesigned process map showing targeted improvements.

29
New cards

Bottleneck

The lowest-capacity resource or stage limiting overall throughput.

30
New cards

Cycle Time

The time elapsed between successive units leaving a process or workstation.

31
New cards

Uptime

The fraction of scheduled time that a machine is available for production.

32
New cards

Scrap or Rework

Defective work requiring correction or replacement, which directly consumes capacity.

33
New cards

Raw Materials (RM)

Inventory of materials held prior to entering production.

34
New cards

Work in Process (WIP)

Inventory located between or within active production steps.

35
New cards

Finished Goods (FG) Inventory

Completed goods awaiting customer delivery or consumption.

36
New cards

Pull System

A production approach that produces items strictly in response to downstream use or actual demand.

37
New cards

Push Production

A production approach that produces goods based on forecasts or plans rather than downstream consumption.

38
New cards

Just-in-Time (JIT)

An operational strategy to supply or produce items near the time they are needed.

39
New cards

Jidoka

Quality at the source: the practice of detecting defects and stopping or correcting them promptly.

40
New cards

Poka-Yoke

Mistake-proofing devices or methods designed to prevent errors from occurring.

41
New cards

Andon

A signal or stop mechanism used to call attention to a production problem.

42
New cards

Single-Minute Exchange of Dies (SMED)

A lean methodology focused on drastically reducing changeover and setup time.

43
New cards

Cellular Layout / Line Flow

An arrangement where related processing steps are grouped together to enable smoother flow and lower WIP.

44
New cards

Level Loading

Smoothing workloads or production rates consistently across time and workstations.

45
New cards

Standardized Work

Consistent, documented methods established to improve process reliability and quality.

46
New cards

Preventive Maintenance

Planned upkeep scheduled to reduce unexpected breakdowns and capacity losses.

47
New cards

Continuous-Flow Cell

A combined set of process steps operating with minimal inventory between them.

48
New cards

Production Control

The entity on a Value Stream Map responsible for coordinating production schedules and information flow.

49
New cards

VSM Inventory Triangle

A symbol on a value stream map indicating inventory or WIP waiting between process steps.

50
New cards

DMAIC

A structured Six Sigma problem-solving methodology standing for Define, Measure, Analyze, Improve, Control.

51
New cards

Define Phase

The initial stage of DMAIC used to set the project objective, scope, stakeholders, and customer requirements.

52
New cards

SMART

An acronym defining criteria for goal setting: Specific, Measurable, Achievable, Relevant, Time-Bound.

53
New cards

SIPOC

A high-level process map and acronym representing Suppliers, Inputs, Process, Outputs, Customers.

54
New cards

In-Scope / Out-of-Scope Tool

A project charter tool that clarifies which specific activities the project will and will not address.

55
New cards

X-Y Map

A preliminary mapping tool listing process inputs (Xs) and process outcomes (Ys).

56
New cards

Critical to Quality (CTQ) Tree

A tool that translates broad customer needs into specific, measurable quality requirements across three levels: broad requirements, specific CTQs, and CTQ specifications.

57
New cards

Kano Analysis

A quality tool that classifies product and service deliverables into dissatisfiers, satisfiers, or delighters.

58
New cards

Kano Dissatisfier

A basic customer requirement whose absence creates dissatisfaction.

59
New cards

Kano Satisfier

A performance requirement where better results generally increase customer satisfaction.

60
New cards

Kano Delighter

An unexpected feature that creates delight when present in a product or service.

61
New cards

Affinity Diagram

A brainstorming and organizing tool that groups many related ideas or complaints into themes or clusters.

62
New cards

Multivoting / Nominal Group Technique

A structured voting method used by teams to narrow options and develop group consensus.

63
New cards

Silent Brainstorming

An idea generation technique where individuals write ideas quietly before group evaluation.

64
New cards

Negative Brainstorming

A brainstorming technique where participants imagine ways to worsen a problem and then reverse those concepts into improvements.

65
New cards

Operational Definition

A precise, consistent definition specifying exactly how a process variable is measured.

66
New cards

Voice of Customer (VOC)

The stated needs, expectations, and concerns expressed by customers.