Activity list
Master record of each unit of work: ID, verb-noun description, predecessors/successors, resources, and assumptions/constraints; each activity is sized at roughly 8–80 hours of effort
Work package vs. activity
Lowest WBS level describing what is delivered vs. the decomposed unit describing how the work gets done
Finish-to-Start (FS)
B can't begin until A ends; the most common dependency (e.g., testing after coding)
Start-to-Start (SS)
B can't begin until A begins (e.g., documentation once drafting begins)
Finish-to-Finish (FF)
B can't end until A ends (e.g., quality review closes after inspections)
Start-to-Finish (SF)
B can't end until A begins; rare (e.g., night shift ends when day shift starts)
Mandatory dependency
Hard logic; cannot be changed
Discretionary dependency
Soft logic based on best practice; can be changed, and is the only kind that allows overlapping activities
External dependency
Relationship driven by something outside the team's control (e.g., permits); carries risk
Precedence Diagramming Method (PDM)
Network diagram format where activities are nodes; each node shows duration, ES, EF, LS, LF, and float
Analogous duration estimate
Based on similar past projects; fast and cheap but least accurate, so suited to early stages
Parametric duration estimate
Statistical rate applied to quantity (e.g., 100 m of cable = 2 days, so 500 m = 10 days)
Three-point (PERT) estimate
Expected time = (O + 4M + P) ÷ 6; standard deviation = (P − O) ÷ 6
Duration estimate: expert judgment
Use experienced people to validate other estimates or when the work is new
Forward pass
Left-to-right calculation (EF = ES + duration) that yields the earliest project finish
Backward pass
Right-to-left calculation (LS = LF − duration) that yields the latest dates that don't delay the project
Total float
LS − ES (or LF − EF); slack shared along an entire path
Free float
ES of the successor − EF of the activity; slack belonging to one activity alone
Critical path
Longest path through the network; zero slack, so any delay pushes the end date
Crashing
Compressing the schedule by adding resources or overtime; always raises cost; main risk is diminishing returns; do the cheapest cost-per-day first
Fast-tracking
Compressing the schedule by overlapping activities planned in sequence; no direct cost increase; main risk is rework
Which activities get schedule compression?
Critical-path activities only
Milestone
Zero-duration event marking a point in the project (e.g., "Go-Live")
Gantt chart
Most common schedule format; bars plotted on a timeline
Schedule baseline
Approved schedule; altered only via formal change control; basis for SV and SPI
Cost estimate: analogous
Uses similar past projects; used at initiation; accuracy −25% to +75%
Cost estimate: parametric
Uses a statistical rate such as $/sq ft; used in planning; accuracy −10% to +25%
Cost estimate: bottom-up
Estimate each work package, then roll up; detailed planning; accuracy −5% to +10%
Contingency reserve
Covers known unknowns (identified risks); controlled by the PM; included in the cost baseline
Management reserve
Covers unknown unknowns; controlled by senior management/sponsor; excluded from cost baseline but included in total project budget
Cost aggregation sequence
Work package estimates → control accounts → project estimate → + contingency = cost baseline → + management reserve = total project budget
Funding-limit reconciliation
Rescheduling work so planned spending fits within the tranches in which funds are released
PV (BCWS)
Budget for work scheduled to be done by now ("what should be done?")
EV (BCWP)
Budget for work actually completed ("what was done?")
AC (ACWP)
Actual cost of the work completed
Reading EVM variances and indices
Variances (CV, SV) negative = bad; indices (CPI, SPI) below 1.0 = bad; SV is in dollars, not days
Quality vs. grade
Meeting requirements (low is always a problem) vs. a category of features (low can be fine; a budget hotel can be high on the first)
Prevention costs
Training, quality planning, design reviews; usually the best return
Appraisal costs
Testing, inspections, audits; finds defects but doesn't stop them from occurring
Internal failure costs
Rework and scrap found before delivery
External failure costs
Warranty claims and returns after delivery; the most expensive cost-of-quality category
Plan Quality
Sets standards and metrics; outputs are the management plan for meeting requirements and the measures used to judge it
Manage Quality
Process-focused and proactive; audits how work is done
Control Quality
Product-focused and reactive; inspects deliverables; output feeds Validate Scope
Fishbone (Ishikawa) diagram
Root-cause tool organized by Man, Machine, Method, Material, Measurement, Mother Nature
Quality checklist
Standardizes required steps using lessons learned
Control chart
Plots process data against limits set at ±3σ from the mean
Rule of seven
7+ consecutive points on one side of the mean signal an assignable cause to investigate
Control limits vs. specification limits
Process behavior vs. customer requirements
Pareto chart
Descending bars plus a cumulative % line; shows the vital few causes (80/20)
PDCA
Plan-Do-Check-Act cycle (Deming); the improvement method
Kaizen
"Change for the better"; small daily gains by everyone; the improvement mindset
Verification
Building the product right: internal check against specs
Validation
Building the right product: done with the customer (e.g., UAT)
Acceptance criteria
Measurable conditions agreed on during planning, before work begins
Risk vs. uncertainty
Specific event with estimable probability and impact (plan for it) vs. vague lack of knowledge with no probability (handle with buffers and adaptability)
Opportunity
Positive uncertain event; logged in the same register as threats
Risk management loop
Identify → Analyze → Plan Responses → Monitor → back to Identify; revisit at every milestone
Risk brainstorming
Most common identification technique; quantity first, judge later, with a facilitator
Risk checklist
Built from past projects; fast but misses new risks; a starting point only
Assumptions analysis
Asking "what if this assumption is wrong?"; unstable assumptions become risks
Best-practice order for identifying risks
Start with checklists, expand with brainstorming, pressure-test with assumptions analysis
Probability-impact matrix
Qualitative tool scoring each risk by likelihood and severity; scales defined up front; high-high needs action now, low-low can be accepted and monitored
Risk register
Living log of each item's description, probability, impact, response, one named owner, and status
Avoid (threat)
Change the plan so the risk can't occur
Transfer (threat)
Shift the impact to a third party (insurance, contracts)
Mitigate (threat)
Reduce probability and/or impact; the most common response
Accept (threat)
Take no proactive action; document and monitor
Exploit (opportunity)
Make sure the opportunity happens
Share (opportunity)
Partner with a third party better able to capture it
Enhance (opportunity)
Increase the opportunity's probability and/or impact
Accept (opportunity)
Don't pursue it, but still document it
Choosing a risk response
Compare response cost to expected loss; consider risk appetite; re-score what's left afterward
Residual risk
Exposure remaining after a response is applied
EMV
Probability × impact, summed across risks; one way to size contingency (others: 5–15% of budget, or expert judgment + historical data)
RAID log
Risks, Assumptions, Issues, Dependencies; each entry needs owner, due date, status; reviewed at kickoff, weekly, at milestones; archived at close
Risk vs. issue
Future and uncertain (plan for it) vs. present and certain (resolve it); a risk that occurs with no plan becomes the latter
Communications matrix
Answers who needs what information, when, in what format, from whom, and by which method
Interactive communication
Two-way, real time (meetings, calls); best for complex issues and decisions
Push communication
Sent to specific recipients (email, memos, reports); best for status updates
Pull communication
Recipients retrieve it when needed (portals, wikis, shared drives); best for large audiences
Communication channels formula
n(n − 1) ÷ 2; 10 people = 45, 20 people = 190
Status report
Where the project stands right now
Progress report
What was completed this period
Forecast report
Where the project is heading (EAC, ETC)
Variance report
Deviation from baseline plus root cause
Dashboard
Displays KPIs with red/yellow/green status
Information radiator
Large visible display (Kanban board, burndown chart); common in Agile
Make (vs. buy)
Choose when work is core, sensitive/proprietary, or you have idle capacity
Buy (vs. make)
Choose when you need special expertise, lack capacity, need speed, or the work is one-time
Procurement process
Plan (needs, SOW, selection criteria) → Conduct (solicit, evaluate, award) → Control (performance, changes, payments) → Close (acceptance, final payment, lessons learned)
Statement of Work (SOW)
Defines scope, location, period of performance, and acceptance criteria; vagueness here is the root cause of most disputes
Source selection criteria
Price, technical capability, past performance, management approach; set before bidding
RFI
Learn about the market; no commitment
RFP
For complex needs; asks vendors for both a technical and a cost proposal
RFQ
For a well-defined item; price is the main factor
IFB
Government sealed bidding; lowest responsive, responsible bidder wins
Fixed-price contract
Seller bears cost risk; best for well-defined scope; highest buyer cost certainty. Variants: FFP, FPIF (target + ceiling), FP-EPA (inflation adjustment)
Cost-reimbursable contract
Buyer bears cost risk; best for uncertain scope; lowest buyer cost certainty. Variants: CPFF (fixed fee), CPIF (fee tied to cost vs. target), CPAF (subjective award fee)
Time & materials contract
Hourly rate plus materials; cost risk mostly on buyer; limited certainty; best for low-to-medium scope clarity; capped by a not-to-exceed (NTE) limit