3.3.3. Flood management

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/29

encourage image

There's no tags or description

Looks like no tags are added yet.

30 Terms

1
New cards

What is the term for the flat area surrounding a river channel where water spills during a flood?

Floodplain

2
New cards

How does steep valley relief affect the  speed  of rainwater reaching a river?

Increases speed

3
New cards

Which geological rock types are impermeable and increase surface run-off?

  • Granite

  • Shale


4
New cards

How does urbanisation impact flooding?

Creates impermeable surfaces like tarmac

5
New cards

How does deforestation impact flooding?

Reduces interception and evapo-transpiration

6
New cards

What type of river management involves constructing artificial, man-made structures?

Hard engineering

7
New cards

What large artificial lake is created behind a dam to trap water?

Reservoir

8
New cards

What is the purpose of a flood relief channel?

Divert excess water

9
New cards

What are benefits of dams and reservoirs?

  • Generating hydroelectric power

  • Storing drinking water

  • Providing leisure opportunities


10
New cards

What material are hard engineering structures typically built from, offering long-term security?

Concrete and steel

11
New cards

What do dams do?

Regulate river flow and hold back heavy rainfall

12
New cards

What does channelisation do?

Speeds up water flow away from high-risk areas

13
New cards

What does embankments do?

Increases the volume of water the channel can hold

14
New cards

What approach works with natural river processes rather than using artificial structures?

Soft engineering

15
New cards

What soft engineering strategy involves restricting land use according to flood risk?

Floodplain zoning

16
New cards

What strategy returns an artificially straightened channel back to its natural, meandering course?

River restoration

17
New cards
18
New cards

What actions can residents take following a flood warning?

  • Deploy sandbags

  • Move valuables upstairs

  • Evacuate


19
New cards

What are the ecological benefits of soft engineering?

  • Creates wildlife habitats

  • Increases biodiversity

  • Absorbs carbon dioxide


20
New cards

Which soft engineering method relies entirely on clear communication and timely public action?

Flood warnings

21
New cards

What is a drawback to flood warnings?

Does not physically block floodwaters

22
New cards

What is a drawback to afforestation?

Requires decades of growth to be effective

23
New cards

What is a drawback to floodplain zoning?

Restricts valuable commercial development

24
New cards

On the floodplain of which river is the market town of Banbury located?

River Cherwell 

25
New cards

In what year was the £18.5 million Banbury flood alleviation scheme completed?

2012

26
New cards

How much water can the Banbury flood storage area can temporarily store, during peak river  discharge?

up to 3 million m3

27
New cards

How long is the earth embankment constructed as part of the Banbury scheme?

2.9 km

28
New cards

What are the social positives of the Banbury flood alleviation scheme?

  • Reduces anxiety for local residents

  • Keeps important transport links open


29
New cards

What is a major economic negative of large flood management schemes like Banbury's?

High capitol costs

30
New cards

Which environmental positives were created by the soft engineering elements in Banbury?

  • Wetlands

  • Ponds

  • Tree-planting zones