Comprehensive practice flashcards defining essential concepts, diagramming methods, workshop formats, and frameworks from Unit 7: Value Engineering and Value Management Practice.

Absence of Process
A condition exemplified by the 'draw an owl' illustration, indicating that an absence of a structured process results in an absence of rigour.
How? and Why? Logic
The relational logic in function analysis where asking 'Why?' moves to superordinate functions to the left, and asking 'How?' moves to subordinate supporting functions to the right.
Customer F.A.S.T. Diagram
A Function Analysis System Technique diagram that organizes functions into a logical hierarchy to express project requirements in purely functional terms for creative problem solving.
How? vs. Why? Axis
The horizontal axis of a F.A.S.T. diagram that establishes the hierarchical relationship of functions and makes the diagram self-validating in both directions.
Needs vs. Wants Axis
The vertical continuum axis of a F.A.S.T. diagram where essential functions are placed near the top ('needs') and desirable functions are placed near the bottom ('wants').
Scope Lines
Vertical boundary lines on a F.A.S.T. diagram that define the limits of the problem, containing all primary and secondary functions between them.
Basic Function
The overall, non-negotiable function positioned outside the left scope line that describes what the solution must achieve; non-performance results in project failure.
Primary Functions
The main functions located directly right of the left scope line that collectively describe the functionality required from key components of the project solution.
Secondary Functions
Supporting functions positioned to the right of primary functions in a functional hierarchy to support, facilitate, or enable them.
Tertiary Functions
Subordinate functions positioned further to the right in a F.A.S.T. diagram that directly support secondary functions.
Technical Solution (F.A.S.T.)
Any physical design element or component positioned to the right of the right scope line, excluded from the functional problem model itself.
Resource Constraint Line
A horizontal line added last to a F.A.S.T. diagram to separate essential 'needs' from sacrificial 'wants' in light of finite project resources.
F.A.S.T. Self-Validation
The verification method where reading left-to-right ensures every function is supported by the one to its right, and reading right-to-left ensures every function supports the one to its left.
Higher-Order Functions
Functions located toward the left of a F.A.S.T. diagram that explain purpose or goals and answer the question 'Why?'.
Lower-Order Functions
Functions located toward the right of a F.A.S.T. diagram that explain operational methods or implementation and answer the question 'How?'.
Value Engineering (VE)
A reactive, problem-solving method with a technical focus deployed during detailed design or construction to optimize existing designs using the Job Plan and function analysis.
Value Management (VM)
A proactive problem-definition method deployed during pre-project or concept design to make functional benefits explicit and appraise them against a client's value system.
Stakeholder (Freeman, 1984)
Any group or individual who can affect or is affected by the achievement of an organization's objectives.
Business Stakeholders vs. Project Stakeholders
The distinction between corporate-level parties concerned with long-term strategic direction and project-level parties focused on short-term tactical execution.
Direct Stakeholders vs. Indirect Stakeholders
The classification of participants based on whether they directly fund/deliver a project or are indirectly impacted by its completed outcome.
Values
Beliefs held by individuals about how the world should be, which frame and determine their subjective value judgements.
Objective View of Value
A theoretical model presuming that value is an intrinsic, measurable quality embodied directly within a product independently of observers.
Subjective View of Value
The principle that value is judged by people through the filter of their personal values, meaning value cannot exist without people.
Value System Conflict
The natural tension among client and stakeholder priorities, classically manifested in balancing Time ('open as soon as possible'), Cost ('make sure it's cheap'), and Quality ('ensure quality').
Whole Life Value
Balancing a project's ongoing costs over an operational life (typically 30–60 years) against the functional benefits delivered, rejecting decisions based solely on initial lowest tender cost.
BS 8534:2011
The British Standards Institution code of practice for construction procurement policies, strategies, and procedures that uses VM to align procurement with client business strategy.

The 'Lever of Value'
A framework developed by Kelly, Male, and Graham (2004) showing value creation moving sequentially through Strategy, Objectives, Functionality, and Operation.
VM0
A strategic value management study held during the Strategic Definition or Preparation and Briefing stage before a built solution is determined.
VM1
A value management study held during Concept Design after a built solution is decided to define spatial allocation and establish the project value system.
VM2
A value management study held during Spatial Coordination when the procurement path is implied, reviewing spaces and key elements before concept sign-off.
VE1
A value engineering study conducted during the Technical Design stage to optimize building elements and components.
VE2
A value engineering study conducted during Manufacturing and Construction focusing on component-level adjustments and construction delivery solutions.
Value Study 1
An early workshop involving the client and facilitator examining business need and spatial concepts before any physical solution is decided.
Value Study 2
A workshop involving the client, facilitator, and independent audit team conducted once a built solution is chosen but before selecting the procurement path.
Value Study 3
A workshop involving the client, facilitator, and project design team examining concept, spaces, and elements under an implied procurement path.
Value Studies 4 & 5
Detailed-phase workshops involving facilitators, design teams, and independent auditors focused strictly on elemental and component optimization.
The Job Plan
The formal five-stage sequential framework (Information, Analysis, Creativity, Judgement, Development) used to structure value workshops and generate auditable outcomes.
Information Stage (Job Plan)
The initial Job Plan stage dedicated to gathering project context, synthesis, team building, identifying core issues, and eliciting the client's value system.
Analysis Stage (Job Plan)
The Job Plan stage focused on functional problem definition through F.A.S.T. diagramming to understand necessary functionality.
Creativity Stage (Job Plan)
The divergent ideation stage of the Job Plan where participants brainstorm purpose, functional requirements, and potential alternative options.
Judgement Stage (Job Plan)
The convergent evaluation stage of the Job Plan involving first-level and refined sorts to select ideas with the highest potential.
Development Stage (Job Plan)
The concluding Job Plan stage where selected proposals are refined, implementation plans are prepared, and recommendations are presented to sponsors.
Orientation Phase
The pre-workshop preparation phase of a value study involving information gathering, synthesis, and agenda production.
Implementation Phase
The post-workshop phase involving action plan sign-off, feedback workshops, report circulation, and monitoring execution.
Double-Diamond Problem Solving
A design-thinking framework matching the Job Plan's divergence and convergence across Discover, Define, Develop, and Deliver stages.
40-Hour Workshop
The traditional, exhaustive value workshop model now largely considered impractical in the UK due to excessive duration, cost, and diary constraints.
Charrette
A condensed, intense UK workshop format running 1 to 1.5 days that adapts the Job Plan to accommodate project constraints and stakeholder availability.
Dual Facilitation
A facilitation technique where two leaders share and alternate workshop roles and agenda duties to maintain pace, rigor, and stakeholder management.
Sensemaking
The cognitive process of connecting new workshop knowledge to existing understanding, requiring periodic reflection and formal breaks.
Satisficing Outcome
A consensus solution rooted in bounded rationality where stakeholders compromise enough for everyone to maintain support without fully satisfying any single individual.