1/175
Looks like no tags are added yet.
What does BIM stand for?
Building Information Model / Modelling, or Building Information Management.
Give the basic definition of BIM.
A process used to design, understand and demonstrate the key physical and functional characteristics of a facility using a virtual, computerised model.
Give the holistic definition of BIM.
A set of interacting policies, processes and technologies that generate a methodology to manage essential building design and project data in digital format throughout the building's life cycle.
Are Revit and ArchiCAD "BIM"?
No. BIM is not a software application or merely a technology. These are tools that support BIM, which is about enabling stakeholders to collaborate and share information through the project life cycle.
What are the three fields of BIM?
Policy, process and technology.
What is the policy field of BIM?
Written regulations, principles and standards that support AECO industry players in decision making. Involves regulatory bodies and educational institutes.
What is the aim of the Australasian BIM Advisory Board (ABAB)?
To provide leadership on the adoption of BIM in Australia.
What is the process field of BIM?
The ordering of work activities across time and place with clearly defined inputs and outputs. Examples: developing architectural, mechanical and electrical models, drawings, and supplier/manufacturer documents.
What is the technology field of BIM?
Developing software, hardware and networking systems (BIM software and hardware companies).
What do "BIM dimensions" refer to?
The particular kinds of data or information linked to a BIM model.
What is 3D BIM?
Creating graphical and non-graphical information and sharing it in a central database (the Common Data Environment, CDE).
What is a Common Data Environment (CDE)?
A central database including a project server, extranet or file-based retrieval system. Ownership of information within the CDE remains with the generator of the model.
What does 4D add to a model?
Scheduling data (3D + time).
What does 5D add to a model?
Cost information (3D + cost), used to calculate purchasing, installing and maintenance cost.
What does 6D add to a model?
Information supporting facilities management and operation, to drive better business outcomes in the operation phase.
What does the UK BIM maturity model do?
Lets stakeholders assess BIM adoption and implementation at project and industry level. Maturity at project level represents the extent of collaboration and data integration. Level 3 = fully integrated, seamless collaboration.
What does the Client's BIM Adviser (BIM lead) do?
An independent adviser appointed by the client early on. Formulates the employer's/project's information requirements (EIR/PIR), supports the client in assessing suppliers' BIM competency, and develops the BIM strategy (BIM brief).
What does the BIM data/information manager do?
Appointed by the client. Establishes the CDE and maintains/validates information flow, determines file exchange methods and formats, locates a central shared repository for drawings, establishes the origin point for model alignment, and runs scheduled reviews and quality checks.
What does a BIM manager do?
Exists at organisational and project level. Organisational: develops/restructures internal processes and trains personnel. Project: implements and manages BIM through design, construction and handover, supports the client on BIM deliverables, manages BIM standards, and trains project teams.
What does a BIM coordinator do?
Model coordination (architectural, structural, MEP) and clash detection, maintaining the collection of models from different sources, quality control of discipline models, and coordinating model handover at agreed milestones.
What does a BIM technician / modeller / originator do?
Works within a single discipline. Creates the project information model (3D models, drawings, 4D schedules), liaises with other teams on technical issues, reports to the BIM manager, and must be proficient in BIM software.
What is the formula for ROI?
ROI = return (benefits) / investment (cost).
What are the solutions for cultural issues in BIM implementation?
Provide training and examples of successful implementation. The client's BIM adviser monitors the collaborative approach.
Solutions for technical issues in BIM implementation?
Software companies are addressing data-transfer issues. The BEP is a response to issues around the level of detail of models.
Solutions for client-demand issues in BIM implementation?
Government BIM mandates for public and private projects, and incentives for clients implementing BIM.
Solutions for skill-related issues in BIM implementation?
Train employees, recruit staff with the required skills, and assess suppliers before appointment.
Solutions for cost-related issues in BIM implementation?
Cost-benefit analysis against the potential value of BIM, review process and software requirements, and get management support.
Why is BIM implementation at organisation level challenging?
It introduces transformative concepts and tools, which requires changes to existing business processes. It is a stage-based process.
How is BIM maturity assessed at organisation level?
By interviewing employees to find the company's BIM maturity (different assessment types can be used). Goals are then staged as short, medium and long term.
What are the levels of capability when matching staff competency to BIM roles?
Individual competency, group competency, organisational capability, team capability, project team capability and organisational team capability.
Name the four BIM information/contract documents.
OIR (Organisational Information Requirements), AIR (Asset Information Requirements), EIR (Employer's Information Requirements) and the BEP (BIM Execution Plan). The BEP is the only one used in this course.
What is the OIR?
Data and information needed to achieve the client organisation's objectives. An organisation-level strategy developed by the client that catalogues the information required for its asset management system and other functions. It generates the AIR.
What is the AIR?
Defines the graphical and non-graphical information and documentation needed for the lifetime operation and management of a built asset.
What is the EIR?
Defines the information the employer requires from their internal team and suppliers to develop the project and operate the built asset. States deliverables (documents, model files, structured information) and how/when information is exchanged. Suppliers respond with a pre-contract BEP.
What is the flow between OIR, AIR and EIR?
OIR generates the AIR; the EIR sets what suppliers must provide, and suppliers respond to the EIR with a BEP.
What is the project BIM brief and who writes it?
Defines the client's requirements for BIM on the project. Developed by the BIM adviser to support the client's BIM strategy. Covers client-specified BIM uses, deliverables, software file formats and reference documents.
What is the BEP and what is its other name?
Also called the BIM Management Plan (BMP). The key document created at project start to track, coordinate, manage and monitor all BIM activities per the BIM brief, and to make sure all organisations know their BIM responsibilities. It is a live document.
Why is the BEP a "live" document?
Because client requirements, project personnel and project processes change.
Pre-contract vs post-contract BEP?
Pre-contract: the initial plan in tendering where the supplier sets out their proposed approach and capacity in response to the EIR. Post-contract: drawn up after the contract is awarded to confirm supply chain capabilities and fix details going forward.
List the 12 sections of a BEP.
1 Overview/purpose, 2 Project details and information, 3 Key project personnel, 4 Model authoring requirements, 5 BIM data exchange protocol, 6 BIM processes, 7 Project delivery methods, 8 Collaboration, 9 Quality control, 10 Technology infrastructure, 11 Facility data requirement, 12 Project deliverables.
What goes in BEP section 2 (project details)?
Land location and size, GFA, number of levels, function, budget, project name/number, milestones (concept design, schematic design, design development etc.) and key terms/abbreviations.
What goes in BEP section 3 (key project personnel)?
Decision makers with BIM roles and responsibilities: client BIM members, the BIM team, the design team and technical team members.
What goes in BEP section 4 (model authoring requirements)?
A table showing how models are shared/delivered, model quality, and the timeframe for model delivery.
What goes in BEP section 5 (BIM data exchange protocol)?
How data is exchanged between disciplines, e.g. IFC, COBie.
What goes in BEP section 8 (collaboration)?
Platforms for sharing information and models, BIM file formats (e.g. IFC) for coordination and quality checks, and BIM meetings and roles.
Name the four BIM meeting types in the BEP.
BIM initiation meeting (all parties understand BIM relevance and strategy), BIM coordination meetings, design team meetings (BEP reviewed by all members) and client engagement meetings (show the team is delivering to the client's BIM strategy).
⭐ What is Level of Information (LOI)?
The amount of non-graphical data (properties of an object) in an information model at a given stage. Example: material specification.
⭐ What is Level of Detail?
The amount of graphical / 3D data in a model at any point in a project (how much detail a model element includes).
⭐ What is Level of Development (LOD)?
The level of completeness to which a model element is developed (AIA E202). It describes the minimum dimensional, spatial, quantitative, qualitative and other data in a model element (AIA G202).
Why is LOD used?
To reduce challenges in information exchange and so improve communication and coordination, and because model elements develop at different rates during design.
What are the pre-design activities?
Understanding client needs (functionality), phasing and expansion requirements, assessing site conditions and context, assessing project viability (site, regulatory, financial), and building code and zoning constraints.
What happens in the Schematic Design (SD) phase?
Preliminary design with building plans to set the building idea and spatial organisation. Design options in sketches show shape and early concept rendering. Candidate materials/finishes and building sub-systems are identified.
What happens in the Design Development (DD) phase?
Detailed floor plans including all major construction systems and subsystems (walls, facades, floors, structure, lighting, mechanical, electrical, acoustic) with general details, plus materials and finishes, site drainage, site systems and landscaping.
What happens in the Construction Detailing (CD) phase?
Detailed plans for demolition, site preparation and grading, specifications of systems and materials, test and acceptance criteria, technical drawings with all intersystem connections, and the building permit.
What are the challenges of the current design process?
Information flow issues, communication needed across all teams, design errors, lost time, lower quality and RFIs.
How is BIM used in the Schematic Design phase?
The architect builds a schematic model for massing and volume (test shapes, heights, site fit), spatial coordination (pathways and room layouts) and data integration (link initial GFA calculations to model elements). A walkthrough or renderings are presented to the client.
How is BIM used in the Design Development phase?
The model holds all design information (material type and location of walls, doors, windows etc.). Weekly or fortnightly 3D coordination meetings (architects, engineers, PM, estimator, scheduler, construction manager) and clash detection / coordination reviews take place.
What is constructibility?
The evaluation of whether a design can actually be built by a construction team, and how. A constructibility review simulates and analyses construction issues while they are still cheap to fix, and removes interface problems before construction starts.
Why does a constructibility review need in-depth installation knowledge?
Because design intent in SD and DD does not carry the LOD needed for fabrication or installation.
How does design communication work in a BIM environment?
All communication goes to the BIM model rather than between project groups. The model is the central point for all information.
What is design authoring software?
3D modelling software used to create and manage building information models. Authoring tools create 3D models; audit and analysis tools study or add richness to the model's information.
What is conceptual massing?
3D mass modelling, generally by architects, used to create models of complex-shaped buildings. Architects can extract 2D plans, elevations and sections from the mass model.
What are parametric objects?
The 3D objects (used by Revit, ArchiCAD) that BIM models are built from. They can include manufacturer and model number, material and finish, cost, and program and code requirements.
What is a BIM object library (or "family")?
A set of object classes. BIM design tools like Revit provide predefined libraries of fixed-geometry and parametric objects.
What is IFC?
Industry Foundation Class. A common, open data exchange format for transferring model data between different BIM software. Represents geometry, relations, processes, materials, performance, fabrication and other properties.
What is a Revit Model Element and what are its two types?
Represents the actual geometry of the building. Host element: receives/supports other elements (e.g. walls, floors). Component element: an inserted item that is pre-manufactured, purchased and installed (free-standing or needs a host).
What is a Revit View Element?
An item in the interface that lets you see and interact with all other elements.
What is a Revit Datum Element?
Levels, Grids and Reference Planes. They establish project context, limits and extents. Their families and types cannot be edited.
What are Revit View-Specific Elements?
Elements that document or describe a view and appear only in that view (copy/paste to reuse). Detail elements: 2D families showing a model element at a level of detail impractical to model; keep their size regardless of view scale. Annotation elements: text, dimensions, tags, symbols.
What is Dynamo?
A visual programming tool that works with Revit.
Mono-discipline vs multi-discipline models?
Mono-discipline: built by one discipline, often for its own purposes. Multi-discipline: each discipline produces its own model, then they are integrated or federated into one shared model. Coordination happens through the combined model; changes are made in the individual discipline models.
Integrated model vs federated model?
Integrated: aggregates several mono-discipline models into one (merges all properties into a single database). Federated: links (does not merge) several mono-discipline models together.
Why split discipline models on large projects?
Into multiple smaller models to keep file sizes manageable.
What is model quality checking?
Checking the quality and internal consistency of a BIM.
Verification vs validation?
Verification: the manual process of checking deliverables (outputs) against requirements (inputs). Validation: the automated process of checking a digital deliverable (e.g. a 3D model) for consistency/errors or against information requirements. They are sometimes used interchangeably depending on context.
Which software audits and analyses models?
Solibri and Navisworks, in a semi-automated process for geometric inconsistencies and other criteria.
What makes a model good quality (fit for purpose)?
It is well structured (right tool used, objects geometrically precise, structured for intended analysis or exchange), adheres to project requirements and standards, and has the information the receiver needs so it is a reliable representation usable downstream (construction, fabrication, FM).
What else does model checking cover?
Geometric interference / clash detection, LOD alignment, correctness of object types and properties, version comparison (revisions), and compliance with codes, client requirements and regulations.
What is interoperability?
The ability to effectively transfer project data between different domains and platforms without data loss. Can refer to file formats (IFC) and systems (CDE).
Proprietary vs non-proprietary file formats?
Proprietary: readable only by their own (and permitted) software, e.g. RVT, DWG, NWD. Non-proprietary / open: vendor-neutral, readable by any software, e.g. IFC, COBie, gbXML.
What is the purpose of a CDE?
Lets cross-functional team members work on a project regardless of office location or project size; supports collaboration and efficient sharing, reuse and communication of data without loss or misinterpretation.
What is materials management?
Planning, identification, procurement, storage, receiving and distribution of materials. The aim is the right materials, in the right quantities, in the right place when needed; it supports safety, productivity and schedule performance.
Problems with conventional material delivery?
Crews search large stockpiles instead of working, hidden stockpile costs, stockpiles block workflow and risk quality and safety, and early bulk delivery hurts cash flow.
Complexities of construction material management?
Poor coordination and communication between parties, and unrealistic delivery dates: materials arriving too early (inventory cost, deterioration) or too late (lost productivity).
Approaches to effective material management?
Proper logistics planning, just-in-time delivery, and ICT: BIM software, RFID, barcodes, and GPS/GIS.
Benefits of effective material management?
Continuity of supply, reduced lead time, better coordination, lower transport costs, higher quality materials, less wastage, minimised inventory costs and optimised inventory control.
What three functions make up material supply management?
Delivery time management (activities and durations), storage area management (site division, lot number, area size, occupied or not) and quantity management (material name, dosage per phase).
How does 4D BIM help with delivery time management?
The 4D schedule updates automatically when the Revit project or building component properties are changed.
Materials schedule vs BOQ?
A materials schedule lists the types, sizes, quantities, quality specs and sometimes price of all materials; it deals only with materials. A BOQ gives brief details of all items of work and their costs. A materials schedule does not give work items or processes. A schedule is a table extracted from element properties.
What data does BIM-based site layout planning need?
Large equipment (machinery, cranes), social services and office equipment (containers, sanitary), traffic areas and routes (roads, storage), supply and disposal (electricity, garbage containers), site safety (fences, scaffolding) and temporary pit systems (excavation support, slope).
What is RFID and how is it used with BIM?
Radio frequency identification: a tag on an object transfers data by radio waves to a reader. BIM + RFID monitors procurement of materials, movement of materials and equipment on site, and locates materials/components on site or in the factory.
What is offsite construction / prefabrication?
Assembling components of a structure in a factory or other manufacturing site, then transporting the assemblies to the construction site. Also called OSC, offsite prefabrication (OSP) and offsite manufacturing (OSM).
How does prefabrication control costs?
By economising time, wages and materials.
Examples of prefabricated units?
Doors, wall panels, floor panels, stairs, windows, roof trusses, room-sized components, and sometimes entire buildings.
What documents are required for prefabrication?
Contracts, drawings/models, specifications and estimates (BOQ).
Drawings vs specifications?
Drawings: dimensions, notes, assembly details, plans, elevations. Specifications: detailed instructions not usually on drawings (standards, project-specific selections, schedules for windows, doors, finishes, hardware). Together they fully describe the materials and form part of the building contract.
What are MTS components?
Made-to-stock: production planned on forecast demand to meet future demand. Examples: standard plumbing fixtures, drywall panels and studs, pipe sections.
What are MTO components?
Made-to-order: produced only in response to a confirmed customer order. Examples: pre-stressed hollow core planks, catalogue windows and doors.
What are ETO components?
Engineer-to-order: unique, complex products needing engineering analysis for specific customer requirements. Examples: structural frame members, structural precast pieces, facade panels.
What are the three key requirements for BIM-based offsite construction?
(1) Scenarios for information exchange, (2) information requirements and evaluation metrics, (3) definitions of data exchange functional requirements and workflow.