Product based layout (continuous flow and production lines)

Where resources are arranged sequentially, according to the steps required to make a product. This is used for products with identical or highly similar designs.

2
New cards

Functional layout (job shop and batch manufacturing)

Where resources are physically grouped by function. This is used for products with high degrees of customization or expertise required.

3
New cards

Continuous Flow Processes

Produces highly standardized products using a tightly-linked, paced sequence of steps.

4
New cards

Production Line

A process used to produce a narrow range of standard items with identical or highly similar designs.

5
New cards

Job Shops

A process used to make a wide variety of highly customized products in quantities as small as one.

6
New cards

Batch Process

A process where items are moved through different manufacturing steps in groups

7
New cards

Functional Layout

Work areas are arranged by function (identical machines and functions are located in “departments”)

8
New cards

When are functional layouts best suited?

Where a wide range of product configurations or customization is required

9
New cards

Functional Layout Caveat

Highly flexible, but requires extensive coordination between functions to be effective

10
New cards

Product in Job or Batch Shop

Large variety & low volume

11
New cards

Product in Production Line/Continuous

Low variety & high volume

12
New cards

Job or Batch Layout & Equipment Type

Functional layout with general purpose equipment

13
New cards

Production Line/Continuous Shop Layout & Equipment Type

Product layout of specialized equipment

14
New cards

Product Variety in Job or Batch Shop

High

15
New cards

Product Variety in Production Line/Continuous

Relatively Low

16
New cards

Material Handling in Job or Batch Shop

Manual (by hand, forklift)

17
New cards

Material Handling in Production Line/Continuous

Automated (Conveyor)

18
New cards

Worker skills in Job or Batch Shop

High

19
New cards

Worker skills in Production Line/Continuous

Low

20
New cards

Scheduling in Job or Batch Shop

Complex, Changes Routinely

21
New cards

Scheduling in Production Line/Continuous

Fixed Over a Time Horizon

22
New cards

Product Documentation and Specifications in Job or Batch Shop

Changes Often

23
New cards

Product Documentation and Specifications in Production Line/Continuous

Stable

24
New cards

Work Load in Job or Batch Shop

Variable

25
New cards

Work Load in Production Line/Continuous

Stable

26
New cards

Costs & cost system in Job or Batch Shop

High unit cost, job cost system

27
New cards

Costs & cost system in Production Line/Continuous

High overhead & depreciation, product cost system

28
New cards

Forecasting in Job or Batch Shop

Product Family

29
New cards

Forecasting in Production Line/Continuous

Individual Item

30
New cards

Fixed Position Layout

A type of manufacturing process in which the position of the product is fixed and doesn’t move

31
New cards

Hybrid Manufacuring Process

A group of processes that seeks to combine the characteristics, and hence advantages, of more than one of the classic processes

32
New cards

Machining centers

Machines or series of machines that complete several manufacturing steps

33
New cards

Group technology/Cellular Layout

Dedicating equipment and people to producing all the products within a product family

34
New cards

Product Family

A set of products that require similar processing

35
New cards

Make-to-stock (MTS)

Products that require no customization

36
New cards

Assemble-to-order (ATO)

Products that are customized only at the very end of the manufacturing process

37
New cards

Make-to-order (MTO)

Products that use standard components but the final configuration of those components is customer-specific. Customized from a Standard “Menu” of options

38
New cards

Engineer-to-order (ETO)

Products are designed and produced from the start to meet unusual customer needs or requirements. Completely Customized

39
New cards

When customization occurs early in the supply chain:

-Flexibility in response to unique customer needs will be greater.

-Lead times to the customer will tend to be longer.

-Products will tend to be more costly.

40
New cards

When customization occurs late in the supply chain:

-Flexibility in response to unique customer needs will be limited.

-Lead times to the customer will tend to be shorter.

-Products will tend to be less costly.

41
New cards

Pure Manufacturing Nature vs Pure Services Nature

Tangible vs Intangible Products

42
New cards

Pure Manufacturing with Customers

Low Contact and Involvement

43
New cards

Pure Services with Customers

High Contact and Involvement

44
New cards

Markets in Pure Manufacturing

Typically Large

45
New cards

Markets in Pure Services

Typically Small

46
New cards

Quality measurement in Pure Manufacturing

Objective

47
New cards

Quality measurement in Pure Services

Subjective

48
New cards

The dimensions on which services can differ and compete?

Nature of Service Package, Degree of Customization, and Level of customer contact.

49
New cards

Service Package

All physical and intangible activities that a service organization provides

50
New cards

Physicality in Service Package

Requires capital expenditures, material costs, tangible assets

51
New cards

Intangibility in Service Package

Requires training, skill development, knowledge assets

52
New cards

Lower customization allows for what?

Standardized processes

53
New cards

Higher customization requires what?

Flexible processes

54
New cards

Primary measurements in lower vs higher customization

Productivity and Cost; Customer Satisfaction

55
New cards

Front Room

Direct customer interface, high customer contact. Activities designed to guide the customer through the process. (onstage activities)

56
New cards

Back Room

Activities done away from the customer, low customer contact. Activities carried out much like a manufacturing process.

57
New cards

How is level of customer contact mapped?

Using service blueprinting

58
New cards

Service processes challenge

Communicating customer needs throughout it

59
New cards

Layouts are designed to minimize what?

Movement of Materials and People

60
New cards

Layouts are designed to maximize what?

Utilization, productivity, and quality of Machines and People

61
New cards

Layouts are designed to manage what?

Complexity where they improve management of processes; interactions between machines, people, customers, and stakeholders

62
New cards

Project Management

The application of knowledge, skills, tools, and techniques to project activities to meet project requirements

63
New cards

Project

A temporary endeavor undertaken to create a unique product, service, or result

64
New cards

What makes planning in projects difficult?

They are non-routine

65
New cards

Why are projects complex?

It’s involving a variety of skills and capabilities

66
New cards

Projects typically require?

Significant levels of cross-functional and inter-organizational coordination

67
New cards

Projects are clear on what?

Their starting and ending points after which the people and resources dedicated to the project are reassigned

68
New cards

Concept Phase

The first of five phases of a project where project planners develop a broad definition of what the project is and what its scope will be

69
New cards

Primary Performance of a Project

Time, Scope, Money

70
New cards

Scope

Description of the desired outcomes of a project

71
New cards

Scope Creep

The tendency for the scope to change throughout the duration of a project

72
New cards

Project Definition Phase

The second of five phases of a project where project planners identify how to accomplish the work, how to organize for the project, the key personnel and resources required to support the project, tentative schedules, and tentative budget requirements. Budget estimates become more accurate.

73
New cards

Planning Phase

The third of five phases of a project where project planners prepare detailed plans that identify activities, time and budgets targets, and the resources needed to complete each task, while also putting into place the organization that will carry out the project.

74
New cards

Milestones

Performance , Time, & Budget targets scheduled throughout the project timeframe used to track whether the project is progressing as planned

75
New cards

Performance Phase

The fourth of five phases of a project where the organization actually starts to execute the plan

76
New cards

Costs, Quality, and Speed in Performance Phase

A function of how well managers have completed the first three phases of the project.

77
New cards

Postcompletion Phase

The fifth of five phases of a project where the project manager or team confirms the final outcome, conducts a postimplementation meeting to critique the project and personnel, and reassigns project personnel

78
New cards

Critical Path

A sequence of tasks for which there is no extra time available. Delays here will delay the entire project.

79
New cards

Slack

Extra time that is available for task completion. Tasks with this available may be delayed without delaying the entire project.

80
New cards

Crashing

Efforts to shorten the duration of a project or to make up delays that have occurred

81
New cards

What will always compromise on the overall Project?

Project delays or errors

82
New cards

Gantt Chart

A graphical tool used to show expected start and end times for project activities and to track actual progress against these time targets.

83
New cards

CPM: Critical Path Method

A network-based technique in which there is a single time estimate for each activity.

84
New cards

Outcomes of CPM

Provides a graphical display of project complexity, Provides a graphical display of activity or task precedence, Provides an estimate of the earliest completion-time of the project, Indicates which activities or tasks are “critical” and cannot be delayed, Indicates which activities are non-critical and how long they can be delayed without delaying the entire project (slack).