1/69
Looks like no tags are added yet.
Core CVP/breakeven Formula
CM × units − fixed costs
Linear Cost Model Equation
TC = F + Vx
High-Low Method: Slope (V) formula
Cost change divided by volume change using the highest and lowest volume observations.
Regression vs High-Low Method
uses all data points via least squares; uses only two extreme points.
Contribution Margin (CM)
net sales rev minus VARIABLE costs
Contribution Margin Ratio Formula
CM as a % of rev
CM Income Statement Format
Revenue − Variable Costs = CM. CM − Fixed Costs = operating income
Margin of Safety
Expected sales minus breakeven sales
Weighted-Average Contribution Margin
contribution of 1 "avg" unit, weighed by sales mix
Explain in one or two sentences why a contribution margin income statement is more useful than a traditional one for CVP analysis.
It classifies costs by behaviour (variable vs fixed) rather than by function, so the contribution margin — the figure CVP relies on — is shown directly.
Give one reason the regression estimate is usually more reliable, and one caution that applies to both equations
fits every data point instead of relying on judgement or two extremes; hold only inside the relevant range.
Define prime costs.
Direct materials plus direct labour.
Define conversion costs.
Direct labour plus manufacturing overhead.
Job order costing vs process costing
unique products; identical units.
What is the formula for the POHR?
Total estimated overhead costs / total estimated quantity of the base.
What is an allocation base?
A measurable yardstick connecting overhead to jobs, like labour or machine hours.
What is activity-based costing (ABC)?
Costing each activity first, then letting products pay for activities used.
why unit cost matters for running the biz
mgrs use unit cost 2 decide WHICH products 2 keep, WHT price 2 charge, n HW MANY 2 make. get cost wrong n every 1 of those decisions is wrong w it
why unit cost matters for reporting the biz
financial statements frm topics 1-5 need it too: unit cost values COGS on incoem statement n unsold inv on bal sheet
what is a cost driver
the base tht actly CAUSES MOH 2 rise — the fairest yardstick 2 use
how firms with no factory still use job costing
same skeleton as the factory: find direct labour rate, trace what u cn (fox's DL $), allocate what u cant (the office MOH), use POHR to set predetermined rate (office MOH / DL $ base)
how to record overhead gap in journal when MOH underallocated
DR COGS / CR MOH
how to record overhead gap in journal when MOH overallocated
DR MOH / CR COGS
State reasons activity-based costing can give a more accurate product cost than a single plantwide rate.
it uses a separate rate per activity tied to the real cost driver; it stops high-volume products subsidising low-volume complex ones; it captures overhead caused by setups, tests and inspections rather than just labour or machine hours.
A factory uses $9,000 of materials ($7,000 direct, $2,000 indirect) and $11,000 of factory labour ($8,000 direct, $3,000 indirect) during the period. Give the two journal entries to record the USE of materials and labour, routing each amount to the correct account.
dr wip inv 7000, moh 2000 // cr RM 9000 dr wip inv 8000, moh 3000 // cr wages payable 11000
why overhead gaps occur
The POHR is an estimate made before the period, so allocated overhead rarely equals the actual overhead later incurred.
Product vs. Period Costs
(DM, DL, MOH) are held in inventory until sold; expensed in the period incurred.
Explain why the same factory rent can be a direct cost of one cost object and an indirect cost of another.
Direct/indirect is defined relative to a cost object: rent can be traced directly to the production department (or whole company), but cannot be traced to a single product unit, where it is indirect
State two differences between financial and management accounting.
financial managements are primarily for internal managers while management accounting is primarily for external stakeholders. financial management focuses mainly on historical results while management accounting focuses on plans and decisions using past and forecast data
Capital Asset
An operational asset used over a long period, such as a truck, building, or software platform.
Capital Investment
The acquisition of a capital asset.
Capital Budgeting
Planning which long-term investments to make to maximise a company's profitability.
Capital Rationing
Ranking and selecting projects when investment funds are limited.
Payback Period Formula
Amount invested divided by expected annual net cash inflow (ignore residual value).
Payback Period Limitations
It ignores the time value of money and all cash flows after initial cost recovery.
Accounting Rate of Return (ARR) %
Average annual operating income (inflows-depreciation) divided by average amount invested.
Average Amount Invested Formula
asset cost + residual value, divided by two.
Time Value of Money
The principle that money today is worth more than the same amount later because it can earn interest.
Present Value (PV)
What a future amount of money is worth today after discounting.
Future Value (FV)
What a present amount of money will grow to at a future date through compounding.
Annuity
A series of equal cash payments made at equal intervals.
Net Present Value (NPV) formula
annuity PV of net cash inflows − Initial investment (+ residual PV if any)
NPV Decision Rule
Accept projects with a positive NPV because they add value above the required return.
Profitability Index (PI)
PV of net cash inflows / Initial investment
Profitability Index Decision Rule
Accept projects with a PI greater than 1.0.
Internal Rate of Return (IRR) %
The discount rate at which a project's Net Present Value equals zero.
IRR Decision Rule
Accept a conventional project if its IRR is greater than or equal to the required return.
Discounting
Converting a future amount into its present value by multiplying by a PV factor.
steps to interpolation
$ difference = higher $ - lower $
% of way across the line before NPV reaches 0 = higher $ value / $ difference
higher rate% + (% of way x rate% difference)
In one sentence each, distinguish NPV from IRR.
NPV gives the dollar value a project adds above the required return — PV of inflows minus cost. IRR gives the project's own percentage return — the discount rate that makes NPV zero
Why does capital budgeting screen with payback/ARR before analysing with NPV/IRR?
Payback and ARR are quick and cheap to compute, so they filter out weak projects before the more demanding time-value analysis is applied to the promising few.
Two-question relevance test
Is it in the future? 2. Does it differ between alternatives?
Constraint (limiting factor)
Anything that restricts production or sales, such as machine hours or shelf space.
Product/sales mix decision rule
Rank products by contribution margin per unit of the resource constraint and fill capacity first.
steps in differential analysis
define decision, identify alts, gather RELEVANT info, evaluate n choose
steps in deciding to outsource or buy
remove fixed costs that wont go away, add avoidable fixed costs, minus opportunity cost, compare net costs
steps in deciding to drop a product
determine whether to remove fixed costs, compare revenue lost with variable costs and avoidable fixed costs saved to find change in operating income
Four-step loop
Develop strategies, plan actions, carry out plans, and correct course/compare results.
Five jobs of a budget doc
Planning, communication, resource allocation, controlling operations, and evaluating/motivating.
Budgetary slack
Deliberately understating revenues or overstating costs to make targets easy (padding).
Continuous/rolling budget
Always keeps a full horizon ahead by adding a month as each one closes.
Master budget components
Operating budget, capital expenditures budget, and financial budget.
The grocery-list rule to calculate how much to buy
what you'll use + desired ending − beginning
how budget helps control operations
hold mgrs responsible ONLY 4 wht they cn actly ctrl. blame 4 unctrllable breeds gaming
financial budget formula
cash budget + budgeted income statement n bal sheet
master budget definition
full set of budgeted financial statements n sping schedules 4 the whole org.
order of cash budget's 3 sections
cash receipts, cash payments, short-term financing
order of master budget's 3 components
op-ing budget, capEx, financial budget
State where end-of-period “leftovers” appear on the budgeted balance sheet.
These balances carry the amounts still to be collected or paid into the next period. They are distinct from this 6,000 period’s revenue and expenses.
State two reasons a participative budget tends to succeed where a top-down one may fail.
Those affected help create it, so targets are realistic/achievable; and involvement increases buy-in and motivation to meet the budget.