1
New cards

Site Plan (Plot Plan)

A view from above that shows property outlines, building locations, bearings, setbacks, and easements on a lot.

2
New cards

Bearing

The direction of a line expressed in degrees, minutes, and seconds (e.g., N 40° 28' 36" W).

3
New cards

Plan North vs. True North

Plan North is an orientation aligned to the building walls when they do not run true North/South, differing slightly from True North.

4
New cards

Contour Line

A line on a site plan connecting points of equal ground elevation; closely spaced lines indicate a steep slope, while widely spaced lines indicate a gradual slope.

5
New cards

Benchmark (BM)

A permanent reference marker of known elevation

6
New cards

Setback

The minimum required distance between a building and the property boundaries.

7
New cards

Floor Plan

A horizontal section cut typically 42" to 48" above the finished floor, showing room layouts

8
New cards

Reflected Ceiling Plan (RCP)

A plan displaying items on or in the ceiling layout, such as light fixtures, diffusers, structural framing, and ceiling grids.

9
New cards

Demolition Plan

A floor plan indicating existing components to be removed or modified during remodeling

10
New cards

Architectural Elevation

A vertical projection of an interior or exterior building face

11
New cards

Building Section vs. Wall Section

Building sections cut through the entire structure; wall sections detail a specific wall assembly

12
New cards

Schedule (Architectural)

A systematic table specifying item marks, sizes, quantities, materials, and hardware (e.g., Door, Window, Room Finish, Equipment schedules).

13
New cards

Footing

The concrete base that distributes structural building loads directly onto firm, undisturbed soil below the frost line.

14
New cards

Keyway

A groove molded into the top of a concrete footing to provide a shear key and secure lock for the foundation wall.

15
New cards

Slab-on-Grade (Monolithic / Floating)

A ground-level concrete slab; a monolithic/floating slab incorporates thickened, turned-down footings poured as a continuous unit.

16
New cards

Grade Beam

A reinforced concrete beam spanning from footing to footing or pile cap to pile cap across weak or disturbed soil pockets.

17
New cards

Auger Cast Pile

A deep foundation pile installed by drilling a 12"-14" continuous hole with an auger and pumping concrete under pressure as the auger withdraws.

18
New cards

Caisson

A large-diameter (typically 18" to 72") drilled deep-foundation shaft inspected at base grade, reinforced with a rebar cage, and filled with concrete.

19
New cards

Expansion Joint (Foundation)

A compressible joint (typically 1/2") placed between a slab and wall or around columns to allow thermal movement and prevent cracking.

20
New cards

Waterstop

A flexible PVC or elastomeric strip embedded across cold/construction joints in concrete foundation walls to block underground water infiltration.

21
New cards

Cast-in-Place Concrete

Concrete poured and cured inside custom formwork built directly at the construction jobsite.

22
New cards

Precast Concrete

Concrete cast and cured in a controlled plant/factory, then transported to the job site (often pretensioned or posttensioned).

23
New cards

Pretensioning vs. Posttensioning

Pretensioning stretches tendons before concrete is placed; posttensioning tensions cables through cast-in tubes after concrete hardens.

24
New cards

One-Way Slab System

A cast concrete floor slab system where main reinforcing bars span in one direction supported by parallel beams or joists.

25
New cards

Two-Way Slab (Flat Plate / Flat Slab)

A concrete slab system reinforced to span loads in two directions; flat slab includes drop panels and column capitals to resist punching shear.

26
New cards

Waffle Slab

A two-way joist concrete floor system created by square domes/pans arranged in a grid with solid concrete column heads.

27
New cards

Rebar Size Designation

Rebar sizes are numbered in eighths of an inch (e.g., #4 = 4/8" or 1/2" diameter, #5 = 5/8" diameter).

28
New cards

Stirrup

A vertical loop or U-shaped bar reinforcing concrete beams against shear forces

29
New cards

Bolsters and Chairs

Wire or plastic supports that hold rebar at the correct height in formwork

30
New cards

W-Shape (Structural Steel)

Wide-flange steel beam designation where the first number is nominal depth in inches and the second is weight in lb/ft (e.g., W21x147).

31
New cards

Open-Web Steel Joist

A lightweight shop-fabricated truss joist with top and bottom chords and zig-zag web angles, standardized by the Steel Joist Institute (SJI).

32
New cards

Metal Decking

Corrugated steel sheet panels installed across structural steel beams to act as permanent forms and support for concrete floor slabs.

33
New cards

Sill Plate (Mud Sill)

A horizontal wood plate anchored with anchor bolts directly to the top of the concrete foundation wall.

34
New cards

Rim Joist (Header Joist)

The perimeter framing member nailed to the sill plate on edge, into which the ends of floor joists are fastened.

35
New cards

Trimmer Stud vs. King Stud

A king stud runs continuous from sole plate to top plate on the side of an opening; a trimmer stud sits inside the king stud directly underneath the header to support it.

36
New cards

Cripple Stud

Short wood framing studs positioned between the top plate and header or between the rough sill and sole plate.

37
New cards

Rough Sill

The horizontal framing member framing the bottom of a rough window opening.

38
New cards

Platform Framing (Western Framing)

Framing method where each floor is built as a complete subfloor platform upon which the next story of stud walls is erected.

39
New cards

Balloon Framing

Framing technique where exterior wall studs run continuous from the foundation sill to the roof top plate, using notched ribbons to support joists.

40
New cards

Rafter vs. Ridge Board

A rafter is an angled structural member supporting roof sheathing; the ridge board is the horizontal apex board connecting rafter tops.

41
New cards

Bird's Mouth

A notched cutout (consisting of a plumb cut and seat cut) enabling a rafter to seat flat on the stud wall top plate.

42
New cards

Roof Pitch / Slope

The ratio of vertical rise to horizontal run, traditionally designated per 12 inches of run (e.g., 4" rise / 12" run).

43
New cards

Stringer

The inclined structural beam member supporting the treads and risers of a stairway.

44
New cards

Stair Tread vs. Riser

A tread is the horizontal walking surface of a stair; a riser is the vertical board between steps (number of risers = treads + 1).

45
New cards

Rough-in Plumbing (Stage 2)

The installation of water supply, drain, waste, and vent piping before pouring slabs or closing wall framing.

46
New cards

DWV System

Drain-Waste-Vent piping network that directs waste away while venting gases and maintaining equalized atmospheric pressure.

47
New cards

Cleanout (CO)

A capped, accessible fitting on a drainage pipe allowing cleanout tools to enter and clear blockages.

48
New cards

PEX Tubing

Cross-linked polyethylene flexible plastic tubing commonly used for residential hot and cold potable water distribution.

49
New cards

PVC vs. CPVC

PVC is rigid plastic used for cold water and DWV systems; CPVC is chemically chlorinated plastic approved for hot and cold pressure piping.

50
New cards

Hydronic Heating System

A closed-loop system where water heated in a central boiler is circulated via pumps through pipes to terminal convectors or radiant coils.

51
New cards

Duct Size Callout (e.g., 20x14)

20" Width by 14" Depth

52
New cards

Ceiling Diffuser vs. Floor Register

A ceiling diffuser distributes supply air laterally in multiple directions; a floor register covers a supply or return opening with directional louvers.

53
New cards

Unit Cooling vs. Remote Cooling

A unit cooler is a self-contained window/wall unit cooling one room; a remote system locates the compressor/condenser outdoors away from indoor coils.

54
New cards

Evaporative Cooler (Swamp Cooler)

Cooling system that pulls dry outside air through water-saturated fiber pads, cooling air via moisture evaporation (raises indoor humidity).

55
New cards

Welding Reference Line

The continuous horizontal line of a welding symbol upon which all weld symbols, dimensions, and contour notations are anchored.

56
New cards

Arrow Side vs. Other Side (Weld)

Symbols placed below the reference line apply to the arrow side; symbols placed above the reference line apply to the opposite/other side of the joint.

57
New cards

Fillet Weld Symbol

A right-triangle symbol where the vertical leg is always drawn on the left side of the symbol.

58
New cards

Weld All-Around Symbol

A circle placed at the intersection/elbow of the arrow and reference line indicating the weld encircles the perimeter of the joint.

59
New cards

Field Weld Symbol

A small flag placed at the junction of the arrow and reference line specifying the weld must be completed on site rather than in a fabrication shop.

60
New cards

Weld Size & Length Notation (e.g., 1/4 [Fillet] 2-12)

1/4" weld leg size, 2" weld segment length, spaced 12" on-center (intermittent pitch).

61
New cards

Weld Finishing Contours (C, G, M)

Chipping, Grinding, Machining.