Municipal and Urban Engineering Output

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/3

encourage image

There's no tags or description

Looks like no tags are added yet.

4 Terms

1
New cards

Outputs

(also known as Project Deliverables) are the concrete results or items produced by municipal engineers. They fall into two main categories:

  1. Tangible Outputs

  1. Intangible/Documentary Outputs


2
New cards

Technical & Planning Documents

(Pre-Construction Outputs) Before anything gets built, municipal engineers produce essential planning documents:

  • Engineering Plans & Blueprints

  • Feasibility Studies & Survey Reports

  • Program of Works (POW) & Cost Estimates


3
New cards

Physical & Infrastructure Works

(Construction & Maintenance Outputs) The tangible infra-structure built or maintained by the Municipal Engineering

  • Office:Public Buildings & Facilities

  • Transport Infrastructure

  • Water & Environmental Infrastructure


4
New cards

Regulatory & Administrative Outputs

(Local Building Official Role) Under Republic Act No. 7160 (Local Government Code of 1991): Section 477 — Qualifications, Powers, and Duties of the Municipal Engineer. Municipal Engineers often serve as the Local Building Official (LBO).

  • Building & Ancillary Permits

  • Certificates of Occupancy

  • Inspection & Safety Reports