physical landscapes case studies - geog

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/74

encourage image

There's no tags or description

Looks like no tags are added yet.

75 Terms

1
New cards

What is the case study for UK coastal landforms?

Swanage Bay, Dorset, on the south coast of England.

2
New cards

What rock types are found around Swanage Bay, Dorset?

Hard chalk and limestone, alongside softer clay and sands.

3
New cards

How were the headlands and bays formed at Swanage Bay, Dorset?

Soft rock erodes faster than hard rock through differential erosion. The softer rock erodes inland to form bays, whilst the harder rock remains jutting out as headlands.

4
New cards

Name the two headlands around Swanage Bay, Dorset.

Ballard Point and Durlston Head.

5
New cards

What erosional landform is found at Old Harry Rocks, Dorset?

A chalk stack.

6
New cards

How was Old Harry Rocks, Dorset formed?

Cracks developed in the chalk headland. Hydraulic action and abrasion enlarged the cracks into caves, which developed into arches. The arch collapsed, leaving a stack called Old Harry.

7
New cards

What will eventually happen to Old Harry stack, Dorset?

It will eventually be eroded into a stump.

8
New cards

What depositional landform is found at Chesil Beach, Dorset?

A bar (tombolo).

9
New cards

How was Chesil Beach, Dorset formed?

Longshore drift transports sediment along the coastline. Deposition occurs when the waves lose energy, building up a beach that connects the mainland to the Isle of Portland.

10
New cards

What lagoon is found behind Chesil Beach, Dorset?

The Fleet Lagoon.

11
New cards

What is the main process responsible for moving sediment along the Dorset coast?

Longshore drift.

12
New cards

What is the case study for managed retreat (coastal realignment)?

Medmerry, West Sussex.

13
New cards

Where is Medmerry managed retreat scheme located?

Near Selsey, on the south coast of West Sussex, England.

14
New cards

Why was managed retreat needed at Medmerry, West Sussex?

The area was at high risk of flooding. A shingle ridge was the main sea defence and required regular maintenance and beach reprofiling, which was becoming expensive and unsustainable.

15
New cards

How much did the Medmerry managed retreat scheme cost?

Approximately £28 million.

16
New cards

When was the Medmerry coastal realignment scheme completed?

2014.

17
New cards

What type of coastal management was used at Medmerry, West Sussex?

Managed retreat (coastal realignment).

18
New cards

How was managed retreat carried out at Medmerry, West Sussex?

A new inland embankment was constructed, and a section of the old sea defence was breached, allowing the sea to flood an area of land and create new intertidal habitats.

19
New cards

How much rock armour was used at Medmerry, West Sussex?

Approximately 60,000 tonnes of rock armour was used to strengthen parts of the new embankment.

20
New cards

What was created at Medmerry, West Sussex, following coastal realignment?

New salt marshes, mudflats and intertidal habitats.

21
New cards

What is one social benefit of managed retreat at Medmerry, West Sussex?

It reduces the flood risk to nearby communities and helps protect homes and infrastructure further inland.

22
New cards

What is one economic benefit of managed retreat at Medmerry, West Sussex?

It reduces the need for expensive repeated repairs to the old sea defence and can attract visitors, benefiting the local economy.

23
New cards

What is one environmental benefit of managed retreat at Medmerry, West Sussex?

It created new habitats such as salt marshes and mudflats, increasing biodiversity and providing feeding and breeding areas for wildlife.

24
New cards

What is one economic disadvantage of managed retreat at Medmerry, West Sussex?

The scheme cost approximately £28 million to construct.

25
New cards

What is one environmental disadvantage of managed retreat at Medmerry, West Sussex?

Flooding land changed existing habitats and farmland, meaning some previous land uses and habitats were lost.

26
New cards

What is one social disadvantage of managed retreat at Medmerry, West Sussex?

Some people may be concerned about losing land or changes to the local landscape and access.

27
New cards

What is the case study for a coastal management scheme in the UK?

Lyme Regis, Dorset.

28
New cards

Where is Lyme Regis located?

On the south coast of England in Dorset, along the Jurassic Coast.

29
New cards

Why was coastal management needed at Lyme Regis, Dorset?

The town was built on unstable cliffs which were vulnerable to landslides and erosion. Powerful waves from the south-west eroded the coastline, threatening homes, roads, businesses and the seafront.

30
New cards

What was the name of the coastal management scheme at Lyme Regis, Dorset?

The Lyme Regis Environmental Improvement Scheme.

31
New cards

What was the main aim of the Lyme Regis coastal management scheme?

To reduce coastal erosion and landslide risk and protect the town, its homes, businesses and infrastructure.

32
New cards

What hard engineering was used at Lyme Regis, Dorset?

Sea walls, rock armour and rock groynes.

33
New cards

What soft engineering was used at Lyme Regis, Dorset?

Beach nourishment using sand and shingle to create a wider beach that absorbs wave energy.

34
New cards

How were cliffs stabilised at Lyme Regis, Dorset?

Drainage systems removed excess water, whilst soil nailing and steel piles helped stabilise the cliffs.

35
New cards

What happened in Phase 1 of the Lyme Regis coastal management scheme?

A sea wall and promenade were constructed to the east of the River Lim to protect the coastline.

36
New cards

What happened in Phase 2 of the Lyme Regis coastal management scheme (2005–2007)?

New sea walls were built, beaches were replenished with sand and shingle, rock armour was extended, and old wooden groynes were replaced with stone groynes.

37
New cards

What happened in Phase 3 of the Lyme Regis coastal management scheme?

Planned work west of The Cobb was cancelled because the costs outweighed the benefits.

38
New cards

What happened in Phase 4 of the Lyme Regis coastal management scheme?

A new sea wall approximately 390 metres long was built and cliff stabilisation work was carried out to protect homes and infrastructure.

39
New cards

How much did Phase 4 of the Lyme Regis coastal management scheme cost?

Approximately £20 million.

40
New cards

What is one social benefit of coastal management at Lyme Regis, Dorset?

Homes and the town are better protected from erosion and landslides, improving residents' safety.

41
New cards

What is one economic benefit of coastal management at Lyme Regis, Dorset?

Improved beaches attract tourists, helping local shops, hotels and businesses earn more money.

42
New cards

What is one environmental benefit of coastal management at Lyme Regis, Dorset?

Beach nourishment creates a wider beach which absorbs wave energy and helps protect the coastline.

43
New cards

What is one social disadvantage of coastal management at Lyme Regis, Dorset?

Increased tourism can cause congestion and conflict between visitors and local residents.

44
New cards

What is one economic disadvantage of coastal management at Lyme Regis, Dorset?

The scheme was very expensive and requires ongoing maintenance.

45
New cards

What is one environmental disadvantage of coastal management at Lyme Regis, Dorset?

Defences can look unnatural and interfere with sediment movement, potentially increasing erosion further along the coast.

46
New cards

What is the case study for UK river valley landforms?

The River Severn.

47
New cards

Where is the River Severn located?

It rises in the Cambrian Mountains in Wales and flows through Wales and England into the Bristol Channel.

48
New cards

How long is the River Severn?

Approximately 354 km, making it the longest river in the UK.

49
New cards

Where is the source of the River Severn?

Plynlimon in the Cambrian Mountains, mid-Wales.

50
New cards

What erosional landforms are found in the upper course of the River Severn?

V-shaped valleys, interlocking spurs, waterfalls and gorges.

51
New cards

How are V-shaped valleys formed along the River Severn?

Vertical erosion cuts down into the river bed. Weathering and mass movement cause material from the valley sides to fall into the river, which transports it away, creating a narrow V-shaped valley.

52
New cards

Where are interlocking spurs found along the River Severn?

In the upper course around Llanidloes.

53
New cards

How are interlocking spurs formed along the River Severn?

The river has little energy to erode sideways, so it winds around areas of harder rock, creating ridges that interlock.

54
New cards

Name a waterfall found on the River Severn.

Water-Break-its-Neck waterfall.

55
New cards

How is a gorge formed near Water-Break-its-Neck waterfall on the River Severn?

The waterfall retreats upstream through erosion, leaving a narrow, steep-sided gorge.

56
New cards

What landforms of erosion and deposition are found in the middle course of the River Severn?

Meanders and river cliffs, with slip-off slopes.

57
New cards

How are meanders formed along the River Severn?

Faster flow erodes the outer bank through hydraulic action and abrasion, whilst slower flow deposits sediment on the inner bank, making the bend larger over time.

58
New cards

What depositional landforms are found in the lower course of the River Severn?

Flood plains, natural levees and an estuary.

59
New cards

How are flood plains formed along the River Severn?

During floods, the river overflows its banks and deposits fine sediment across the valley floor. Repeated flooding builds a wide, flat flood plain.

60
New cards

How are natural levees formed along the River Severn?

During floods, the river deposits its heaviest sediment close to its banks. Repeated flooding builds raised banks called natural levees.

61
New cards

Where does the River Severn flow into the sea?

The Bristol Channel, forming an estuary.

62
New cards

What is the case study for a UK flood management scheme?

The Jubilee River flood relief channel, River Thames.

63
New cards

Where is the Jubilee River flood relief channel located?

Near Maidenhead, Windsor and Eton, in Berkshire and Buckinghamshire, England.

64
New cards

When did the Jubilee River flood relief channel open?

2002.

65
New cards

How long is the Jubilee River flood relief channel?

Approximately 11 km long.

66
New cards

Why was the Jubilee River flood relief channel needed?

The low-lying Thames flood plain was at risk of flooding, threatening homes, businesses, roads and valuable property in Maidenhead, Windsor and Eton.

67
New cards

What was the main management strategy of the Jubilee River flood relief channel?

An artificial flood relief channel was built to divert excess water from the River Thames during periods of high discharge.

68
New cards

How does the Jubilee River flood relief channel work?

During high flows, water is diverted from the Thames into the relief channel, reducing pressure on the main river and lowering the flood risk to settlements. It rejoins the Thames downstream.

69
New cards

How many weirs are found along the Jubilee River flood relief channel?

Five weirs control the flow of water.

70
New cards

What is one social benefit of the Jubilee River flood relief channel?

It protects thousands of properties and reduces the risk of people having their homes flooded.

71
New cards

What is one economic benefit of the Jubilee River flood relief channel?

It reduces the potential cost of flood damage to homes, businesses, roads and infrastructure.

72
New cards

What is one environmental benefit of the Jubilee River flood relief channel?

The channel includes meanders and wetland features, creating habitats such as reed beds and wetlands for wildlife.

73
New cards

What is one social issue with the Jubilee River flood relief channel?

Some downstream communities, including areas around Wraysbury and Old Windsor, have concerns that flood risk may be increased or not reduced equally.

74
New cards

What is one economic issue with the Jubilee River flood relief channel?

It was expensive to build and requires costly maintenance and repairs to structures such as weirs.

75
New cards

What is one environmental issue with the Jubilee River flood relief channel?

Construction changed the landscape and habitats, although the scheme also created new wetland habitats.