PROJECT MANAGEMENT OFFICE
PMO
PROJECT MANAGEMENT OFFICE
is a group responsible for ensuring that project
teams are working well together and addressing the
functionality issues in a timely, open, and efficient
manner.
CRITICAL SUCCESS FACTORS
THE AREAS OF A PROJECT THAT ARE VITAL TO ITS SUCCESS
DECISION-MAKING
PROCESS
minimizes a number of
issues related to scope, efficiency,
and productivity throughout the
project implementation cycle.
Scope
defines what needs
to be delivered by the project
changing scope
means the project will have
difficulty in achieving project goals
SCOPE CREEP
Is defined as constant
changes to the parameters outlined in the
original project goals.
TEAMWORK
In most ERP implementations, project teams
are assembled by bringing together staff
from the existing organization, new hires,
and possible external consultants.
CHANGE MANAGEMENT
Communication and training are
the keys to a successful ___ effort.
DECISION-MAKING PROCESS
PROJECT SCOPE
TEAMWORK
CHANGE MANAGEMENT
CRITICAL SUCCESS FACTORS (4)
EXECUTIVE TEAM
They can also assist with
the change management process, especially
communications that will be needed with the
new system.
MANAGING SCOPE CREEP
A well-thought-out process to manage changes
to the scope is critical to a project's success.
IMPLICATIONS FOR
MANAGEMENT
The success or failure of a project often rests with
the skills and capabilities of the PMO, project staff
continuity, and a well-defined communications
process.
System Development Life Cycle
The process of developing new information systems
SDLC
uses a systems approach for problem solving that basically states that complex problems need to be broken up into smaller manageable problems using a systems' hierarchy, and then developing a solution for each problem within the hierarchy.
Requirements
Design
Development
Testing
Deployment
Review
SDLC (6)
Investigate
Analyze
Design
Implement
Maintain
Traditional SDLC (5)
ERP applications
are prepackaged software developed by
commercial software vendors and custom installed for organizations to
automate and integrate the various business processes.
Comprehensive
Middle of the road
Vanilla
Three Major Implementation Plan Choices
ERP implementation plan
is used to create a roadmap or
blueprint to meet cost, scope, and time constraints of an
implementation.
Comprehensive Integration Plan
The most expensive, lengthy, and costly approach.
Business Process Reengineering
BPR
Middle of the road
Implementation Plan
is not as expensive as the
comprehensive approach or as straightforward as the vanilla approach.
Vanilla ERP
Implementation Plan
Utilizes core ERP functionality and exploits the best practice business processes
built into the software.
Traditional ERP Life Cycle
has a deliverable at the end of each stage (e.g., a report with supporting documents) that is reviewed by management and upon which a decision is made either to continue with the project or not.
Scope and commitment stage
Analysis and design stage
Acquisition and development stage
Implementation stage
Operation stage
Stages of ERPLC (5)
Scope and Commitment Stage
Similar to the investigation stage in SDLC
Analysis and Design Stage
Analysis of user requirements
Acquisition and Development Stage
Similar to the acquisition and testing stage of traditional SDLC
Implementation Stage
The focus for this stage is on installing and releasing the system
Gap Analysis
is the evaluation of the functions provided by the erp system
Physical Scope
Establishes which sites will be addressed, the geographical locations of the sites, and the number of users.
BPR Scope
Will the current processes be refined, replaced, or eliminated? What users, departments, sites will be affected?
Technical Scope
How much modification will be done to the ERP software? What processes will be utilized as is and which will be customized?
Resource Scope
How much time and budget is allocated for the project?
Implementation Scope
Which modules should be implemented? How should the modules be connected to the existing system?
Requirements
are attributes for things and processes in the system
that must be respected by designers when synthesizing those requirements into a design solution.
PRODUCT DEVELOPMENT
is the complete process of delivering a new
product or improving an existing one for customers.
REQUIREMENT ANALYSIS
Is the process of determining user expectations for a new or modified product
CROSS-FUNCTIONAL TEAMS
this approach is about getting people from
different fields to work with a product altogether.
ā¢Lack of Trust
ā¢Poor Communication
ā¢Misaligned goals or priorities across departments
ā¢Managing diverse teams and their personalities
CHALLENGES WITH CROSS-
FUNCTIONAL COLLABORATION
Co-products
are desirable secondary goods that are generated
during the manufacturing process and can be sold or reused profitably.
TRACEABILITY
The ability to track every aspect of manufacturing and distributing a product
STYLE
A distinctive appearance, typically determined by the principles according to which something is designed.
Unity of direction
is the singleness of purpose that makes possible
the creation of one plan of action to guide managers in resource allocations.
QUANTIFICATION
The act of giving a numerical value to a measurement of something, that is, to count the quanta of whatever one is measuring.
VERIFIABILITY
is the extent to which information is reproducible given
the same data and assumptions.
UNAMBIGUITY
Not open for Interpretations.
GOOD SENSE
The ability to make the right decision about something; good judgement.