Construction Terms 1

0.0(0)
Studied by 1 person
call kaiCall Kai
Locked
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/59

encourage image

There's no tags or description

Looks like no tags are added yet.

Last updated 5:27 AM on 3/22/24
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

60 Terms

1
New cards

Construction Management

The contractual arrangement where a firm provides construction management services to an owner.

2
New cards

Quality Management

Involves activities like specification development, process control, product acceptance, and training to ensure quality.

3
New cards

Earthmoving

The process of moving and processing soil or rock to meet construction requirements.

4
New cards

Trafficability

The ability of soil to support vehicle weight under repeated traffic.

5
New cards

Loadability

A measure of the difficulty in excavating and loading soil.

6
New cards

Plate Line Capacity

The bucket volume within the bucket following its outline.

7
New cards

Struck Capacity

The bucket capacity when the load is flush with the bucket sides.

8
New cards

Water Line Capacity

The bucket capacity when material is flush with the lowest edge of the bucket.

9
New cards

Heaped Volume

The maximum volume that can be placed in a bucket without spillage based on a specified angle of repose.

10
New cards

Dragline

A versatile machine with the longest reach for digging and dumping in the crane shovel family.

11
New cards

Shoring

Lateral support for the sides of an excavation is usually provided by shoring.

12
New cards

Lagging

Sheet piling is sheeting of concrete, steel, or timber that is designed to be driven by a pile driver.

13
New cards

Trench shields

Used in place of shoring to protect workers during trenching operations.

14
New cards

Dewatering

The process of removing water from an excavation.

15
New cards

Soil permeability

The ease with which water flows through the soil based on grain size distribution.

16
New cards

Wellpoint

The perforated assembly placed on the bottom of the inlet pipe for a well.

17
New cards

Vacuum wells

Wellpoints sealed at the surface to accelerate water flow through soil.

18
New cards

Electroosmosis

Accelerating water flow through soil by applying a direct current.

19
New cards

Grouting

Injecting a grouting agent into soil or rock to increase strength or reduce groundwater flow.

20
New cards

Flat Slabs

Slabs supported directly by columns without beams or joists.

21
New cards

Precast concrete

Concrete cast into shape before placement in a structure.

22
New cards

Prestressed concrete

Concrete with an initial compression load applied.

23
New cards

Pretensioning

Placing reinforcing steel under tension before pouring concrete.

24
New cards

Posttensioning

Placing prestressing steel under tension after concrete erection.

25
New cards

Consolidation

Removing air voids in concrete during placement.

26
New cards

Finishing

Bringing concrete surface to final position and texture.

27
New cards

Vacuum dewatering

Reducing free water in concrete after placement.

28
New cards

Running bond

Masonry bond using stretcher courses with centered head joints.

29
New cards

Common bond

Masonry bond with a repeated header course at regular intervals.

30
New cards

Flemish bond

Masonry bond alternating stretchers and headers in each course.

31
New cards

English bond

Masonry bond with alternate courses of headers and stretchers.

32
New cards

Stack bond

Masonry bond providing no interlocking between units for architectural effect.

33
New cards

Bond beam

Reinforced horizontal beam in masonry wall for strength and crack prevention.

34
New cards

Expansion joints

Permitting movement in masonry walls due to various factors.

35
New cards

Flashing

Layers of material to seal out moisture in construction.

36
New cards

Bar graph schedule

Graphical schedule relating progress of work items to time.

37
New cards

CPM vs

CPM uses fixed durations, PERT uses probability concepts for uncertain estimates.

38
New cards

Activity-on-arrow

Each activity represented by an arrow with description and duration.

39
New cards

Dummy Activity

Represents no work and has zero duration.

40
New cards

Critical path

Path through the network establishing the minimum project duration.

41
New cards

Float

Scheduling leeway available to an activity.

42
New cards

Circle diagram

Simple form of activity on-node diagram using circles for activities.

43
New cards

Precedence diagram

Extension of activity-on-node format with lag-time factors and precedence relationships.

44
New cards

Early event time

Earliest time an event may occur based on a starting time of zero.

45
New cards

Owning costs

Fixed costs incurred annually regardless of equipment operation.

46
New cards

Operating costs

Costs incurred only when equipment is used.

47
New cards

Depreciation

Decline in market value of equipment due to age, wear, and obsolescence.

48
New cards

Investment cost

Annual cost of capital invested in a machine.

49
New cards

Insurance cost

Cost of insurance for equipment against fire, theft, and accidents.

50
New cards

Tax cost

Cost of property tax and licenses for equipment.

51
New cards

Storage cost

Cost of equipment storage, rent, maintenance, and associated overhead.

52
New cards

Total equipment owning cost

Sum of depreciation, investment, insurance, tax, and storage costs.

53
New cards

Service cost

Cost of oil, fluids, grease, filters, and routine maintenance service.

54
New cards

Repair cost

Cost of equipment repair and maintenance.

55
New cards

Cost estimating

Estimating total cost for a construction project based on plans and specifications.

56
New cards

Project cost control

Measuring, recording, and comparing actual project costs and progress.

57
New cards

Contractor qualification

Determining technical and financial ability to perform contract work.

58
New cards

Prequalification

Inviting capable contractors to bid for a project.

59
New cards

Bid bond

Guaranteeing contractor will provide required performance and payment bonds if awarded the contract.

60
New cards

Performance bond

Guaranteeing completion of the project as described in contract documents.