Comprehensive vocabulary flashcards covering key definitions, principles, lifecycle models, testing stages, and team roles from Chapters 1 and 2 of Principles of Software Engineering.

51 Terms

1
New cards

Software

Computer programs and associated documentation that may be developed for a particular customer or for a general market.

2
New cards

Software Engineering

An engineering discipline concerned with all aspects of professional software production from early system specification through to maintaining the system after it has gone into use.

3
New cards

Software Costs Breakdown

Roughly 60%60\% of software engineering costs are development costs, while 40%40\% are testing costs; for custom software, evolution costs often exceed development costs.

4
New cards

Generic Products

Stand-alone software systems marketed and sold to any customer who wishes to buy them, where the product specification is owned and decided by the software developer.

5
New cards

Customized Products

Software commissioned by a specific customer to meet their own unique needs, where the product specification and change decisions are owned by the customer.

6
New cards

Maintainability

An essential attribute of good software dictating that software should be written so it can evolve to meet the changing needs of customers in an evolving business environment.

7
New cards

Dependability and Security

An essential attribute of good software encompassing reliability, security, and safety; it ensures the software does not cause physical or economic damage during system failure and prevents malicious access.

8
New cards

Efficiency

An essential attribute of good software requiring that the software does not make wasteful use of system resources, including memory utilization, processor cycles, and responsiveness.

9
New cards

Acceptability

An essential attribute requiring software to be acceptable to its intended users, meaning it must be understandable, usable, and compatible with other systems they operate.

10
New cards

Software Specification

The fundamental software process activity where customers and software engineers define the software to be produced along with the constraints on its operation.

11
New cards

Software Validation

The fundamental software process activity where the software is checked and tested to ensure that it conforms to its specification and meets customer requirements.

12
New cards

Software Evolution

The fundamental software process activity where the software is modified to reflect changing customer and market requirements.

13
New cards

Embedded Control Systems

Software control systems that control and manage hardware devices, numerically representing the most common type of software system.

14
New cards

Confidentiality (Ethics)

An ethical responsibility where software engineers must normally respect the confidentiality of their employers or clients regardless of whether a formal agreement was signed.

15
New cards

Competence (Ethics)

An ethical standard stating that software engineers should not misrepresent their qualifications or knowingly accept work that is outwith their competence.

16
New cards

Computer Misuse

The unethical use of technical skills to compromise others' computers, ranging from game playing on an employer's machine to the dissemination of viruses.

17
New cards

ACM/IEEE Code of Ethics

A standard code of practice containing eight principles governing the professional behavior and decisions made by software engineers, managers, educators, and students.

18
New cards

Software Process

A structured set of activities required to develop a software system, involving specification, design and implementation, validation, and evolution.

19
New cards

Process (ISO 9000:2015)

A set of interrelated or interacting activities which use inputs to deliver an intended result.

20
New cards

Activity (ISO/IEC 12207:2008)

A set of cohesive tasks within a software process.

21
New cards

Task (ISO/IEC 12207:2008)

A required, recommended, or permissible action intended to contribute to the achievement of one or more outcomes of a process; the smallest actionable unit of work.

22
New cards

Procedure (ISO 9000:2015)

The specified way to carry out an activity or a process.

<p>The specified way to carry out an activity or a process.</p>
23
New cards

Product (Software Process)

An outcome or deliverable produced by a process activity, such as a specification document, design model, source code, or testing report.

24
New cards

Role (Software Process)

A definition of the responsibilities assigned to people involved in the development process, identifying who is responsible for carrying out a particular activity or task.

25
New cards

Pre-condition

A statement of conditions that must evaluate to true before an activity can begin.

26
New cards

Post-condition

A statement describing the expected state that must be true after an activity has been completed successfully.

27
New cards

Plan-Driven Development

A software development approach where all process activities are planned in advance, requirements are identified upfront, and progress is measured against that plan.

28
New cards

Waterfall Model

A classical, sequential plan-driven lifecycle model described by Winston W. Royce (1970) that requires completing separate phases in order from requirements to maintenance.

29
New cards

V-Model

An extension of the linear lifecycle model, first described by Boehm (1979), that uses a V-shaped structure to map each development phase directly to an opposing verification and validation phase.

<p>An extension of the linear lifecycle model, first described by Boehm (1979), that uses a V-shaped structure to map each development phase directly to an opposing verification and validation phase.</p>
30
New cards

Incremental Development

A development approach that interleaves specification, development, and validation, delivering the software progressively in several smaller functional parts called increments.

31
New cards

Staged Delivery Model

A variant of the incremental model based on the sequential construction of only one part of the project at a time.

32
New cards

Parallel Development Model

An incremental development variant where different subsystems are built simultaneously by multiple teams to reduce overall Time to Market (TTM).

33
New cards

Integration and Configuration

A development model based on software reuse where systems are assembled and configured from existing COTS packages, components, or web services.

<p>A development model based on software reuse where systems are assembled and configured from existing COTS packages, components, or web services.</p>
34
New cards

Spiral Model

A risk-oriented lifecycle model that breaks a project into miniprojects across repeated cycles (spirals), evaluating risks before each iteration and terminating like a waterfall model.

35
New cards

Rational Unified Process (RUP)

A modern process framework described as serial in the large and iterative in the small, structured across four phases: Inception, Elaboration, Construction, and Transition.

36
New cards

Agile Development

A development methodology that emphasizes iterative development, frequent software delivery, close collaboration with users, and adapting to changing requirements over extensive documentation.

37
New cards

Scrum

A popular agile framework that organizes work into short cycles termed sprints, utilizing defined roles, events, and artifacts to guide iterative development.

<p>A popular agile framework that organizes work into short cycles termed sprints, utilizing defined roles, events, and artifacts to guide iterative development.</p>
38
New cards

Sprint

The basic development cycle in the standard Scrum framework, having a recommended duration of less than one month and never exceeding 6 weeks6\text{ weeks}.

39
New cards

Daily Scrum

A stand-up meeting with a maximum duration of 15 minutes15\text{ minutes} where each team member reports what they accomplished, what they plan to do, and any impediments.

40
New cards

Product Backlog

An evolving, prioritized list of product requirements maintained and controlled by the Product Owner without excessive upfront detail.

41
New cards

Sprint Backlog

A set of priority requirements committed by the team for a specific sprint, broken down with enough detail to execute.

42
New cards

Rapid Application Development (RAD)

A rapid software development lifecycle model progressing sequentially through Requirements Planning, User Design (interactive prototyping cycles), Construction, and Cutover.

<p>A rapid software development lifecycle model progressing sequentially through Requirements Planning, User Design (interactive prototyping cycles), Construction, and Cutover.</p>
43
New cards

Software Prototype

An initial, simplified version of a software system built to demonstrate concepts, experiment with design options, and elicit user requirements.

44
New cards

Throwaway Prototyping

A prototyping technique where a prototype is constructed solely to clarify and confirm requirements, and is discarded once the real system is developed from scratch.

<p>A prototyping technique where a prototype is constructed solely to clarify and confirm requirements, and is discarded once the real system is developed from scratch.</p>
45
New cards

Evolutionary Prototyping

A prototyping technique where a basic prototype is continuously improved and expanded through user feedback across multiple iterations until it becomes the final deliverable system.

46
New cards

Component Testing

The stage of testing where individual units, functions, or modules of a system are tested independently to confirm they work correctly in isolation.

47
New cards

System Testing

The testing stage where integrated modules are tested as a complete whole to verify that all components work together and check emergent system properties.

48
New cards

Customer Testing

The validation stage (also known as Acceptance Testing) where client data is used by end users to evaluate the software and ensure it meets operational requirements before final acceptance.

49
New cards

Change Anticipation

A strategy to minimize the cost of rework by incorporating activities (such as prototyping) that identify potential system changes before significant development effort is expended.

50
New cards

Change Tolerance

A design strategy where a software process accommodates changes at relatively low cost, typically by implementing changes within unbuilt increments of an incremental process.

51
New cards

Pair Programming

An agile software development practice where two programmers work side by side at a single computer, sliding the keyboard and mouse back and forth to write all production code.