Vocabulary flashcards covering the key engineering terminology, technical specifications, treatment stages, and commercial terms from the Shams Engineering STP proposal.

Last updated 8:02 AM on 10/9/26
Name
Mastery
Learn
Test
Matching
Spaced
Call with Kai
Chat

No analytics yet

Send a link to your students to track their progress

19 Terms

1
New cards

MBBR (Moving Bed Biofilm Reactor)

A wastewater treatment technology utilizing suspended carrier media within an aerated biological reactor to support non-blocking fixed-film biomass for organic pollutant removal.

2
New cards

FRP (Fiber Reinforced Plastic)

The structural composite material specified for constructing the horizontal cylindrical tank body of the 22.5 KLD22.5\,\text{KLD} package sewage treatment plant.

3
New cards

Aqua Nishihara

The Thailand-based equipment manufacturer and brand supplying the imported integrated MBBR package sewage treatment plant.

4
New cards

Inlet Bar Screen with Jet Cleaning System

A preliminary screening unit sized at 600 mm×600 mm600\,\text{mm} \times 600\,\text{mm} equipped with a lever-operated spray gun, brass nozzle, and a 3–5 m3\text{--}5\,\text{m} hose pipe operating at 40–60 psi40\text{--}60\,\text{psi} (2.8–4.0 bar2.8\text{--}4.0\,\text{bar}) to catch and flush coarse solids.

5
New cards

Raw Sewage Inlet Parameters

The baseline design characteristics of untreated influent to the STP: pH 6.5–8.56.5\text{--}8.5, BOD <250 ppm< 250\,\text{ppm}, COD <400 ppm< 400\,\text{ppm}, TSS <200–250 ppm< 200\text{--}250\,\text{ppm}, and Oil & Grease <10 ppm< 10\,\text{ppm}.

6
New cards

Treated Effluent Outlet Parameters

The guaranteed discharge limits achieved by the STP: pH 6.5–8.56.5\text{--}8.5, BOD <50 ppm< 50\,\text{ppm}, COD <250 ppm< 250\,\text{ppm}, TSS <20 ppm< 20\,\text{ppm}, and Oil & Grease <Traces< \text{Traces}.

7
New cards

Solid Separation Tank (T03)

The first compartment within the FRP package unit designed for preliminary mechanical gravity settling and solid-liquid separation.

8
New cards

Fixed Film Aeration Tank (T04)

An aerobic chamber within the FRP unit equipped with fixed media where attached microorganisms oxidize dissolved organic matter in the presence of dissolved oxygen.

9
New cards

MBBR Biological Reactor Tank (T05)

The primary biological treatment zone containing fluidized carrier media kept in suspension by aeration to provide high surface area for biofilm cultivation.

10
New cards

Sedimentation Tank (T06)

The final clarification zone within the FRP unit where biological sludge flocs settle out by gravity before treated effluent discharge.

11
New cards

Equalization / Collection Tank (T02)

A reinforced cement concrete (RCC) retention chamber supplied and constructed by the client to collect raw sewage from building toilets and dampen hydraulic peak loads.

12
New cards

Indoor MCC Control Panel

The Motor Control Center electrical enclosure installed indoors to control, sequence, and protect STP electromechanical equipment such as blowers and pumps.

13
New cards

CFR (Cost and Freight) Chittagong

The international commercial trade term covering the cost of goods and ocean freight shipment to the Port of Chittagong, quoted at $24,267.00 USD\$24,267.00\,\text{USD}.

14
New cards

Advance Payment Term

A commercial contractual condition requiring 60%60\% of the total contract value to be paid as an advance upon issuance of the work order.

15
New cards

Delivery Payment Term

A commercial milestone requiring 35%35\% of the total amount to be disbursed upon delivery of all materials and equipment to the project site.

16
New cards

Commissioning Payment Term

The final payment milestone releasing the remaining 5%5\% of the contract sum upon successful installation, testing, and commissioning of the plant.

17
New cards

Defect Liability Warranty

A contractual guarantee covering free replacement of parts failing due to manufacturing defects for 12 months12\,\text{months} (1 year1\,\text{year}) from material delivery or 18 months18\,\text{months} from Letter of Credit (LC) issuance, whichever occurs earlier.

18
New cards

AIT (Advance Income Tax)

A statutory Bangladeshi tax assessed at 5%5\% (194,540.75 BDT194,540.75\,\text{BDT}) on the total supply and installation contract value.

19
New cards

VAT (Value Added Tax)

A statutory indirect tax assessed at 10%10\% (389,081.50 BDT389,081.50\,\text{BDT}) on the pre-tax total STP cost.