Required Contents of an EIR
Table of Contents
Executive Summary
Project Description
Environmental Setting (Baseline)
Environmental Impact Analysis
Project impacts
Growth-inducing impacts
Cumulative Impacts
Mitigation Measures
Residual (Impact Classes)
Alternatives Analysis
Significant Irreversible Changes
References, Organizations, and Persons Consulted
Required Contents of an EIR cont.
Format/Style may vary
Each element must be covered (less than significant may be grouped)
Plain language, easy to navigate
Analytic, not encyclopedic
Specificity depends on detail of project
Disclosure restrictions- trade secrets, archaeological sites
Executive Summary
An EIR shall contain a brief summary of the proposed actions and its consequences
The language of the summary should be clear and simple as reasonably practical
In most cases, the ES should not exceed 15 pages
The summary shall identify:
Each significant effect with proposed mitigation measures and alternatives that would reduce or avoid that effect
Areas of controversey known to the LA including issues raised by agencies and the public
Issues to be resolved including the choice among alternatives and whether or how to mitigate the significant effects
Executive Summary cont.
Mitigation Measures →
Often in Matrix Format:
Grouped by Issue Area OR
Grouped by Impact Class
The ES is arguably one of the most important sections of an EIR
Many reviewers ONLY read the summary
Should be last section prepared
Project Description
Basis for remainder of the document
Inadequate PD may result in overturned EIR
Ideal timing - completed before NOP is distributed
Must be accurate, stable, and complete
One of the most challenging aspects of CEQA process; PD being developed after EIR process has commenced
Must include all phases and components
Pre-construction, construction, operations, decommissioning, etc.
Remember… no segmenting or piecemealing
Project Description cont.
Project location
Local Map
Regional Map
Site boundaries vs. property boundaries
Important to define “Project Site” (use specific language)
Project Objectives
Project Characteristics
Project Concept
Buildings (location, footprint, height, size, use, elevations/draeings)
Build-out assumptions
Supporting public services
Project Phases (refer to implementation of project; NOT design, CEQA, or permitting phases)
Related environmental requirements mandated by federal, state, or local laws, regulations, or policies
Developing Project Objectives
Clearly written statement of objectives will:
Help LA develop a reasonable range of alternatives to evaluate in EIR
Aid decision makers in preparing findings or a statement of overriding considerations, if necessary
The statement of objectives should include the underlying purpose of the project
Developing Project Objectives cont.
Objectives
What is the purpose of the project? Why is it needed?
NOT listing of project approvals needed
NOT a re-statement of components/characteristics
Whose objectives? → Should write objectives from the standpoint of the public if needed
LA
Applicant
Both
Example:
Applicant objective =
To build high-quality homes with views of the Valley
LA Restatement (standpoint of public) =
To provide housing opportunities for residents of the community consistent with the housing element of the general plan
Developing Project Objectives cont. 2
Narrow or Broad?
When overly broad, objectives cannot help focus alternatives
When defined too narrowly, may limit/restrict alternatives analysis to point of inadequacy
Environmental Analyses
Setting
Impacts
Mitigation
Environmental Setting
Determines baseline for environmental analysis
Description of physical environmental conditions at the top of the NOP, or when environmental analysis is commenced, if no NOP
Sometimes there are exceptions
Includes:
Policy and planning context (Regulatory Setting)
Regional description
Project vicinity
Project site description
REGULATORY + REGIONAL + PROJECT “SITE” = ENVIRONMENTAL SETTING
Determining the “Baseline”
Adequate description of the existing environment is a prerequisite for a legally sufficient impact analysis
Establishes the context for the impact analysis
Dimensions:
Temporal
Spatial
Functional
Baseline Variations
Average conditions over time
temporary lull or spike that happens at the time of environmental review should not depress or elevate the baseline
Baseline on opening day
Future baseline
large-scale transportation or infrastructure projects
Historic baseline
Impact Analysis
Impact = change to baseline
Direct (Primary)
Indirect (Secondary)
Short-term
Long-term
Must evaluate the WHOLE project (all phases and components)
Phases of Impact Analysis
Pre-construction
Remediation
Staging
Construction
Access
Grading
Utilities
Buildings
Landscaping
Operation
Employees
Customers
Products
Events
Transportation
Post-Operation
Mitigation monitoring
Maintenance Decommissioning
Impact Analysis cont.
Must identify singificance of each impact →
Must be based on substantial evidence in the administrative record
Thresholds of Significance
What is a threshold of significance?
What are some important qualities of a good threshold?
Why are they important or what are the benefits?
What are some potential sources for thresholds?
Residual Impact Classification or Significance Conclusions
Class I = Where an impact will have a “significant and unavoidable impact” even after all feasible mitigation and existing regulations are applied to the impact
Class II = Where an impact is identified as significant, but feasible mitigation measures exist to reduce the impact to less than significant levels
Class III = Where an impact is determined as insignificant either through the Initial Study process, or when existing regulations or ordinances are applied to reduce an impact to less than significant levels
Class IV = Where a project impact can result in a beneficial environmental effect
While not required under CEQA, beneficial environmental effects may be discussed
Thresholds of Significance cont.
Residual Impact = Class I (significant, adverse, and unavoidable)
Residual Impact = Class II (less than significant with implementation of mitigation)
Residual Impact = Class III (less than significant; mitigation not required)
Residual Impact = Class IV (beneficial environmental impact)
Impact Analysis cont. 2
Does CEQA provide Guidance for Impact Analysis (Other than Appendix G questions)?
→ ONLY for particular Issue Areas
Agricultural Lands
Historical Resources
Archaelogical Resources
Public Water Systems (for projects w/ >3,000 connections or increase connections by 10%)
Water Supply Analysis (SB 610) by public purveyor (or lead agency if none)
GHG/Climate Change (technical advisory)
Airport Land Use Plan Areas/Military Flight Path
Schools (development of or near)
Transportation (SB 743; technical advisory)
Energy Impacts
If analysis of the project’s energy use reveals that the project may result in significant environmental effects due to wasteful, inefficient, or unnecessary consumption use of energy, or wasteful use of energy resources, the EIR shall mitigate the energy use
Specific guidance on how to conduct the analysis in Guidelines Appendix F: Energy Consumption; however, no definition of “wasteful, inefficient, or unnecessary consumption use”
Impacts of the Environment on a Project
Should CEQA Evaluate
The Project’s impact on the environment?
The Environment’s impact on future project users?
BOTH?
Impacts of the Environment on a Project
The EIR shall also analyze any significant environmental effects the project might cause or risk exacerbating by bringing development and people into the area affected
For example, the EIR should evaluate any potentially significant direct, indirect, or cumulative environmental impacts of locating development in areas susceptible to hazardous conditions (e.g., floodplains, coastlines, wildfire risk areas), including both short-term and long-term conditions, as identified in authoritative hazard maps, risk assessments, or in land use plans addressing such hazards areas
Impacts of the Environment on a Project cont.
CEQA is intended to focus on the impacts of the project on the environment, not the impact of the environment on the project
Exceptions:
A situation where “a project could exacerbate hazards that are already present”
Those situations where the Legislature has specifically required consideration of impacts of the environment on the project
Noise and safety considerations for projects near airports
Safety, health risk, and other concerns related to school construction projects
CEQA does not prohibit an agency from considering how existing consitions might impact a project’s future users; however, mitigation can only be applied if there is an impact on the environment
Wildfire Impacts
Substantially impair an adpoted emergency response plan or emergency evacuation plan?
Due to sole, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to pollutant concentratinos from a wildfire or the uncontrolled spread of a wildfire?
Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment?
Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire instability, or drainage changes?
Wildfire Impacts cont.
Would project exacerbate existing wildfire hazards?
Interference with evacuation plans/routes
Components/features that have the potential to cause wildfires in an area of high risk”
Examples?
Inadequate Impact Analysis
Bad data/ old data/ missing data
Improper methodology
Failure to “show your work”
Impacts not references back to thresholds; thresholds not substantiated
Cumulative Impacts
Two or more individual effects which, when considered together, are considerable or which compound or increase other environmental impacts
Methodology for Conducting Cumulative Impact Analysis
List Method
Projection Method
Cumulative Impacts: List Method
Past, Present, and probable future projects
Factors to consider:
Nature of each environmental resource being examined
Location of project
Type of project
Focus on these projects that contribute to the same cumulative impact
Cumulative Impacts: Projection Method
Reference an adopted local, regional, or statewide planning document that describes or evaluated conditions contributing to the cumulative effect
Project method used for cumulative impacts:
That are the result of many individual contributors
That take place over a large impact area
That are caused by incremental contributions over along period of time
Growth-Inducing Impacts
Fosters economic or population growth or additional housing
Removes obstacles to growth
Taxes community services or facilities to such an extent that new services or facilities would be necessary
Encourages or facilitates other activites that cause significant environmental effects
Growth-Inducing Impacts cont.
Guidelines do not specify level of analysis
Often glossed over in EIRs
Program/ Master EIRs are best time to evaluate; Subsequent EIRs may reference (without repetitive analysis)
Should not be assumed either beneficial or detrimental
“Growth Accommodating”
Recommended approach:
Describe how the project might induce growth
Estimate the amount, location, and timeframe of growth that could occur as a result of the project
Determine the possible environmental effects from growth
Determine impact significance and mitigation measures
Duty to Mitigate for Significant Impacts
Describe all feasible mitigation measures, if available
If more than one are available, discuss each and decribe reasons for selection
Adopt feasible mitigation to reduce the effect to less than-significant level
If none (or not enough) is available, EIR must say so and adopt all mitigation that is feasible
What Makes a Good EFN Mitigation Measure?
The measure must be Effective
must demonstrably reduce environmental impact
The measure must be Feasible
must be within the power of the applicant to complete: both physcially and financially
The measure must be eNforeable
LA and/or RA must have the legal means and wherewithal to ensure long-term compliance and have enforcement mechanisms in case of non-compliance
Absent any one of these components, more work needs to be done to bolster the mitigation, or look elsewhere
General Mitigation Hierarchy
Avoidance
Minimization
Compensation
General Mitigation Categories
Avoidance = completely avoid the impact altogether by not taking certain actions or parts of actions
Minimize = minimize impacts by limiting the degree or magnitude of the action and its implementation
Compensate = compensate for impact by replacing or providing substitute resources or environments
General Mitigation Categories cont.
Minimization
Avoidance 100%
Minimize 1-99%
Compensation
In-Kind
In-Lieu