NR 4417 - EIR Content (Summary, PD, Env Setting, Impacts)

0.0(0)
Studied by 0 people
call kaiCall Kai
learnLearn
examPractice Test
spaced repetitionSpaced Repetition
heart puzzleMatch
flashcardsFlashcards
GameKnowt Play
Card Sorting

1/37

encourage image

There's no tags or description

Looks like no tags are added yet.

38 Terms

1
New cards

Required Contents of an EIR

  • Table of Contents

  • Executive Summary

  • Project Description

  • Environmental Setting (Baseline)

  • Environmental Impact Analysis

    • Project impacts

    • Growth-inducing impacts

    • Cumulative Impacts

    • Mitigation Measures

    • Residual (Impact Classes)

  • Alternatives Analysis

  • Significant Irreversible Changes

  • References, Organizations, and Persons Consulted


2
New cards

Required Contents of an EIR cont.

  • Format/Style may vary

  • Each element must be covered (less than significant may be grouped)

  • Plain language, easy to navigate

  • Analytic, not encyclopedic

  • Specificity depends on detail of project

  • Disclosure restrictions- trade secrets, archaeological sites


3
New cards

Executive Summary

  • An EIR shall contain a brief summary of the proposed actions and its consequences

    • The language of the summary should be clear and simple as reasonably practical

  • In most cases, the ES should not exceed 15 pages

  • The summary shall identify:

    1. Each significant effect with proposed mitigation measures and alternatives that would reduce or avoid that effect

    2. Areas of controversey known to the LA including issues raised by agencies and the public

    3. Issues to be resolved including the choice among alternatives and whether or how to mitigate the significant effects


4
New cards

Executive Summary cont.

Mitigation Measures →

  • Often in Matrix Format:

    • Grouped by Issue Area OR

    • Grouped by Impact Class

  • The ES is arguably one of the most important sections of an EIR

  • Many reviewers ONLY read the summary

  • Should be last section prepared


5
New cards

Project Description

  • Basis for remainder of the document

    • Inadequate PD may result in overturned EIR

    • Ideal timing - completed before NOP is distributed

  • Must be accurate, stable, and complete

    • One of the most challenging aspects of CEQA process; PD being developed after EIR process has commenced

  • Must include all phases and components

    • Pre-construction, construction, operations, decommissioning, etc.

  • Remember… no segmenting or piecemealing


6
New cards

Project Description cont.

  • Project location

    • Local Map

    • Regional Map

    • Site boundaries vs. property boundaries

    • Important to define “Project Site” (use specific language)

  • Project Objectives

  • Project Characteristics

    • Project Concept

    • Buildings (location, footprint, height, size, use, elevations/draeings)

    • Build-out assumptions

    • Supporting public services

  • Project Phases (refer to implementation of project; NOT design, CEQA, or permitting phases)

  • Related environmental requirements mandated by federal, state, or local laws, regulations, or policies


7
New cards

Developing Project Objectives

Clearly written statement of objectives will:

  • Help LA develop a reasonable range of alternatives to evaluate in EIR

  • Aid decision makers in preparing findings or a statement of overriding considerations, if necessary

The statement of objectives should include the underlying purpose of the project


8
New cards

Developing Project Objectives cont.

  • Objectives

    • What is the purpose of the project? Why is it needed?

    • NOT listing of project approvals needed

    • NOT a re-statement of components/characteristics

  • Whose objectives? → Should write objectives from the standpoint of the public if needed

    • LA

    • Applicant

    • Both

  • Example:

    • Applicant objective =

      • To build high-quality homes with views of the Valley

    • LA Restatement (standpoint of public) =

      • To provide housing opportunities for residents of the community consistent with the housing element of the general plan


9
New cards

Developing Project Objectives cont. 2

Narrow or Broad?

  • When overly broad, objectives cannot help focus alternatives

  • When defined too narrowly, may limit/restrict alternatives analysis to point of inadequacy


10
New cards

Environmental Analyses

  • Setting

  • Impacts

  • Mitigation


11
New cards

Environmental Setting

  • Determines baseline for environmental analysis

  • Description of physical environmental conditions at the top of the NOP, or when environmental analysis is commenced, if no NOP

    • Sometimes there are exceptions

  • Includes:

    • Policy and planning context (Regulatory Setting)

    • Regional description

    • Project vicinity

    • Project site description

  • REGULATORY + REGIONAL + PROJECT “SITE” = ENVIRONMENTAL SETTING


12
New cards

Determining the “Baseline”

  • Adequate description of the existing environment is a prerequisite for a legally sufficient impact analysis

  • Establishes the context for the impact analysis

  • Dimensions:

    • Temporal

    • Spatial

    • Functional


13
New cards

Baseline Variations

  • Average conditions over time

    • temporary lull or spike that happens at the time of environmental review should not depress or elevate the baseline

  • Baseline on opening day

  • Future baseline

    • large-scale transportation or infrastructure projects

  • Historic baseline


14
New cards

Impact Analysis

Impact = change to baseline

  • Direct (Primary)

  • Indirect (Secondary)

  • Short-term

  • Long-term

Must evaluate the WHOLE project (all phases and components)

15
New cards

Phases of Impact Analysis

  • Pre-construction

    • Remediation

    • Staging

  • Construction

    • Access

    • Grading

    • Utilities

    • Buildings

    • Landscaping

  • Operation

    • Employees

    • Customers

    • Products

    • Events

    • Transportation

  • Post-Operation

    • Mitigation monitoring

    • Maintenance Decommissioning


16
New cards

Impact Analysis cont.

Must identify singificance of each impact →

  • Must be based on substantial evidence in the administrative record


17
New cards

Thresholds of Significance

  • What is a threshold of significance?

  • What are some important qualities of a good threshold?

  • Why are they important or what are the benefits?

  • What are some potential sources for thresholds?


18
New cards

Residual Impact Classification or Significance Conclusions

  1. Class I = Where an impact will have a “significant and unavoidable impact” even after all feasible mitigation and existing regulations are applied to the impact

  2. Class II = Where an impact is identified as significant, but feasible mitigation measures exist to reduce the impact to less than significant levels

  3. Class III = Where an impact is determined as insignificant either through the Initial Study process, or when existing regulations or ordinances are applied to reduce an impact to less than significant levels

  4. Class IV = Where a project impact can result in a beneficial environmental effect

    • While not required under CEQA, beneficial environmental effects may be discussed


19
New cards

Thresholds of Significance cont.

  • Residual Impact = Class I (significant, adverse, and unavoidable)

  • Residual Impact = Class II (less than significant with implementation of mitigation)

  • Residual Impact = Class III (less than significant; mitigation not required)

  • Residual Impact = Class IV (beneficial environmental impact)


20
New cards

Impact Analysis cont. 2

Does CEQA provide Guidance for Impact Analysis (Other than Appendix G questions)?

→ ONLY for particular Issue Areas

  • Agricultural Lands

  • Historical Resources

  • Archaelogical Resources

  • Public Water Systems (for projects w/ >3,000 connections or increase connections by 10%)

    • Water Supply Analysis (SB 610) by public purveyor (or lead agency if none)

  • GHG/Climate Change (technical advisory)

  • Airport Land Use Plan Areas/Military Flight Path

  • Schools (development of or near)

  • Transportation (SB 743; technical advisory)


21
New cards

Energy Impacts

  • If analysis of the project’s energy use reveals that the project may result in significant environmental effects due to wasteful, inefficient, or unnecessary consumption use of energy, or wasteful use of energy resources, the EIR shall mitigate the energy use

  • Specific guidance on how to conduct the analysis in Guidelines Appendix F: Energy Consumption; however, no definition of “wasteful, inefficient, or unnecessary consumption use”


22
New cards

Impacts of the Environment on a Project

Should CEQA Evaluate

  • The Project’s impact on the environment?

  • The Environment’s impact on future project users?

  • BOTH?


23
New cards

Impacts of the Environment on a Project

  • The EIR shall also analyze any significant environmental effects the project might cause or risk exacerbating by bringing development and people into the area affected

  • For example, the EIR should evaluate any potentially significant direct, indirect, or cumulative environmental impacts of locating development in areas susceptible to hazardous conditions (e.g., floodplains, coastlines, wildfire risk areas), including both short-term and long-term conditions, as identified in authoritative hazard maps, risk assessments, or in land use plans addressing such hazards areas


24
New cards

Impacts of the Environment on a Project cont.

  • CEQA is intended to focus on the impacts of the project on the environment, not the impact of the environment on the project

  • Exceptions:

    • A situation where “a project could exacerbate hazards that are already present”

    • Those situations where the Legislature has specifically required consideration of impacts of the environment on the project

      • Noise and safety considerations for projects near airports

      • Safety, health risk, and other concerns related to school construction projects

  • CEQA does not prohibit an agency from considering how existing consitions might impact a project’s future users; however, mitigation can only be applied if there is an impact on the environment


25
New cards

Wildfire Impacts

  • Substantially impair an adpoted emergency response plan or emergency evacuation plan?

  • Due to sole, prevailing winds, and other factors, exacerbate wildfire risks, and thereby expose project occupants to pollutant concentratinos from a wildfire or the uncontrolled spread of a wildfire?

  • Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may result in temporary or ongoing impacts to the environment?

  • Expose people or structures to significant risks, including downslope or downstream flooding or landslides, as a result of runoff, post-fire instability, or drainage changes?


26
New cards

Wildfire Impacts cont.

  • Would project exacerbate existing wildfire hazards?

    • Interference with evacuation plans/routes

    • Components/features that have the potential to cause wildfires in an area of high risk”

      • Examples?


27
New cards

Inadequate Impact Analysis

  • Bad data/ old data/ missing data

  • Improper methodology

  • Failure to “show your work”

  • Impacts not references back to thresholds; thresholds not substantiated


28
New cards

Cumulative Impacts

  • Two or more individual effects which, when considered together, are considerable or which compound or increase other environmental impacts


29
New cards

Methodology for Conducting Cumulative Impact Analysis

  • List Method

  • Projection Method


30
New cards

Cumulative Impacts: List Method

  • Past, Present, and probable future projects

  • Factors to consider:

    • Nature of each environmental resource being examined

    • Location of project

    • Type of project

  • Focus on these projects that contribute to the same cumulative impact


31
New cards

Cumulative Impacts: Projection Method

  • Reference an adopted local, regional, or statewide planning document that describes or evaluated conditions contributing to the cumulative effect

  • Project method used for cumulative impacts:

    • That are the result of many individual contributors

    • That take place over a large impact area

    • That are caused by incremental contributions over along period of time


32
New cards

Growth-Inducing Impacts

  • Fosters economic or population growth or additional housing

  • Removes obstacles to growth

  • Taxes community services or facilities to such an extent that new services or facilities would be necessary

  • Encourages or facilitates other activites that cause significant environmental effects


33
New cards

Growth-Inducing Impacts cont.

  • Guidelines do not specify level of analysis

    • Often glossed over in EIRs

  • Program/ Master EIRs are best time to evaluate; Subsequent EIRs may reference (without repetitive analysis)

  • Should not be assumed either beneficial or detrimental

    • “Growth Accommodating”

  • Recommended approach:

    1. Describe how the project might induce growth

    2. Estimate the amount, location, and timeframe of growth that could occur as a result of the project

    3. Determine the possible environmental effects from growth

    4. Determine impact significance and mitigation measures


34
New cards

Duty to Mitigate for Significant Impacts

  • Describe all feasible mitigation measures, if available

  • If more than one are available, discuss each and decribe reasons for selection

  • Adopt feasible mitigation to reduce the effect to less than-significant level

  • If none (or not enough) is available, EIR must say so and adopt all mitigation that is feasible


35
New cards

What Makes a Good EFN Mitigation Measure?

  • The measure must be Effective

    • must demonstrably reduce environmental impact

  • The measure must be Feasible

    • must be within the power of the applicant to complete: both physcially and financially

  • The measure must be eNforeable

    • LA and/or RA must have the legal means and wherewithal to ensure long-term compliance and have enforcement mechanisms in case of non-compliance

  • Absent any one of these components, more work needs to be done to bolster the mitigation, or look elsewhere


36
New cards

General Mitigation Hierarchy

  1. Avoidance

  2. Minimization

  3. Compensation


37
New cards

General Mitigation Categories

  • Avoidance = completely avoid the impact altogether by not taking certain actions or parts of actions

  • Minimize = minimize impacts by limiting the degree or magnitude of the action and its implementation

  • Compensate = compensate for impact by replacing or providing substitute resources or environments


38
New cards

General Mitigation Categories cont.

Minimization

  • Avoidance 100%

  • Minimize 1-99%

Compensation

  • In-Kind

  • In-Lieu