101 Terms

1
New cards

crisis

problem —> solution

2
New cards

non-crisis

problem —> root cause—> solution

3
New cards

To solve a problem is ______ to _____ a problem is better

good ; prevent

4
New cards

SIPOC

Suppliers, input, process, output, and customer

5
New cards

5 Why’s

Why, why, why, why, why *helps get to the bottom of the cause of issue

6
New cards

Ishikawa/Fishbone/ C&E Diagram

defective → output→ man , method, material, machine, mother nature, measure

7
New cards

Six sigma

problem-solving methodology

8
New cards

six sigma performance

statistical term for a process that produces less than 3.4 defects per million defect opportunities

9
New cards

six sigma improvement

key outcomes/work process of a business improves dramactically ( 70% = breakthrough)

10
New cards

six sigma deployment

perspective rollout of six sigma methods across an organization( roles and responsibilities)

11
New cards

six sigma toolset

collection of methods & tools of six sigma practitioners to achieve improvement

12
New cards

change process to _______ → ______ quality output

reduce variation; consistent

13
New cards

define

Set the context, key metrics, and objectives for the project

14
New cards

measure

Capture the current baseline performance and capability of the process or system

being improved. Identify all possible contributing factors.

15
New cards

Analyze

Narrow the pool of possible factors down to the critical few. Use data and tools to

understand the cause-and-effect relationships in the process or system.

16
New cards

Improve

Develop and validate the modifications that lead to an improvement in the process or

system.

17
New cards

control

Establish plans and procedures to ensure the improvements are adopted and sustained.

18
New cards

six sigma occurs 2 levels

managerial( long-term)

tactical( short-term)

19
New cards

managerial

Six Sigma is used to achieve predictability & control of performance in a business or business process by applying the methods of science to the domain of leadership

  • six sigma is war on variation


20
New cards

clear value proposition & ROI( VOB)

direct, measurable financial focus and impact

21
New cards

top management commitment & accountability

top-down initiative

22
New cards

customer focus

what are my customer’s requirements

23
New cards

connected business metrics

performance measures that are accessible and visible to everyone whose actions or decisions impact performance

24
New cards

dashboard

a metaphor for critical performance metrics

25
New cards

key drivers

customer satisfaction(voc), revenue & cost ( VOB)

26
New cards

knowledge

provide knowledge about process performance

27
New cards

alignment

must align with key drivers

28
New cards

lead metrics( KPI) ( predictable, influenceable)

  • supplier

  • input

  • process


29
New cards

Lag metrics( after the fact)

  • output

  • customer


30
New cards

Good Metrics

1. Get leaders involved

2. Limit the number of metrics

3. Visually represent your metrics

(dashboard)

4. Metrics must be simple (scoreboard)

5. Metrics must respond quickly

6. Metrics should drive only important

activities

7. Take corrective action

8. Show Lead and Lag Metrics

31
New cards

Bad Metrics

1. Cannot collect accurate or complete data

2. Complex and difficult to explain

3. Complicated operations with excessive

overhead

4. Cause employees to act not in the best

interest of customers or the company

32
New cards

process orientation

1, 2, …n +=

33
New cards

project focus

DMAIC framework

34
New cards

Infrastructure for Change

• Leadership System

  • Customer Satisfaction (VOC)

  • Business Goal (VOB)

• Criteria for Selecting Projects

  • governance

• Methodology

  • 5 phases (DMAIC)

• IT Systems, SOP, Dashboard

  • SOP = Standard Operating Procedure

• Competency & Compensation

  • Roles & Responsibilities

  • Belts: Yellow, Green, Black, Master Black

• Enterprise Communication

  • Project Management

• Project Savings Criteria

  • ROI

• Review Process

  • Gated process


35
New cards

complete ___ change

culture ; The ultimate goal is for everyone in the organization to have the ability to understand customers’ requirements, map processes, collect data, measure

performance, identify risks and opportunities, analyze inputs and outputs, and make

continuous improvements.

36
New cards

practices

  • visible

  • easier to change


37
New cards

Values

  • hidden

  • harder to change


38
New cards

Problem/ defect

VOC; do not meet customers’ standards

39
New cards

Root Causes

VOP; Do not have a process that meets our customer requirements

40
New cards

Specification

the value separating acceptable from unacceptable performance

41
New cards

Specification Limit (SL)

  • One-Sided Specification( at least 50 lbs)

  • Two-Sided Specification( 450 g ± 5 g)


42
New cards

Upper Specification Limit( USL) VOC

if above, out of specification

43
New cards

Lower Specification Limit( LSL) VOC

if below, out of specification

44
New cards

Target (T) VOC

goal( one value)

45
New cards

RUMBA

  • Reasonable- not too tight, not too loose ( External VOC)

  • Understandable - clear, unambiguous ( External VOC)

  • measurable( External VOC)

  • Believable - employees “ bought in”( Internal VOC)

  • Attainable - process can meet satisfaction( Internal VOC)


46
New cards

COPQ

cost of poor quailty

47
New cards

Quality Defined: Tradition

Quality = compliance with specifications

  • rework

  • scrap


48
New cards

Quality Defined: Six-Sigma

Quality = on-target performance with minimum variation

49
New cards

“Goal Post” Quality

  • Inconsistency across the range

  • Process adjusted to meet specifications

  • Once the specification is met, individuals’ responsibility ends

  • money and time are spent to react to out-of-specification product and service

  • Focus is on yield ( good), a lag measure disconnected from reality


50
New cards

Six Sigma- On-Target Quality

  • Consistency centered on the target

  • Process standardized to meet specifications

  • Individuals are continually responsible for reducing variation

  • Money and time are spent to proactively understand and eliminate variation

  • Focus is on capability, a lead measure connected to quality


51
New cards

Rolled-Through-Yield( RTY)

ipo x ipo x ipo x ipo

52
New cards

COPQ is typically 25-40% of revenue

  • scrap

  • rework

  • inspection

  • expedite

  • extra inventory

  • high working capital

  • warranty

  • lost customer loyalty

  • lost sales

  • engineering changes

  • late deliveries


53
New cards

Short term

  • calculated from approximately 20 to 30 subgroups

  • variability is often relatively small


54
New cards

Long-Term Capability

  • Samples come from different machines, operators, measuring equipment, and even environmental factor changes

  • Variability is often greater than short term capability due to( special cause variation and mean shift)


55
New cards

Brainstorming

verbal

56
New cards

Nominal Group Technique

non-verbal

57
New cards

x represents( independent)

input

58
New cards

f represents( change)

function

59
New cards

e represents

errors or uncertainty surrounding how accurately the Xs are transformed to create outcome

60
New cards

Y represents( dependent)

output or results you desire or need

61
New cards

Determinism

The principle that you can create a desired outcome by configuring and

controlling inputs in a specific manner

62
New cards

We analyze:

The inputs (Xs) and the process (f), and then implement

the best possible combination to achieve our objective

63
New cards

Reactionary

we exercise direct control over our environment instead of allowing our

environment to control us_____

64
New cards

True

Correlation does not imply causation

65
New cards

Causal connection likely exists if:

  • A reasonable explanation exists

• The connection happens under different environmental conditions

• You’ve ruled out confounding variables

66
New cards

Variation_____ from expectation

deviation

67
New cards

What is the central theme of Six Sigma

The characterization, measurement, analysis, and control of variation

68
New cards

Common Cause Variation

  • AKA natural variation

  • Embodied in the e in the transfer function


69
New cards

Special Cause Variation

  • AKA assignable variation

  • Special causes are specific things you can identify and do something about


70
New cards

Coping with variation

  • First, reduce special-cause variation

  • second reduce common cause variation


71
New cards

( Data Collection: VOP) Measuring translates knowledge into

numbers

72
New cards

Without measuring your ___ and ___, your ability to improve will be weak

x;y

73
New cards

Quantitative measures

continuous, length, weight, time

74
New cards

qualitative

discrete/ attribute: pass/ fail, dent/ no dent, yes/no

75
New cards

Leverage

The ability to apply effort toward the critical few Xs that have the greatest

impact on your desired Y

76
New cards

Pareto’s Law

roughly 80% of the effects come from 20% of the causes

77
New cards

When you look for leverage in business, you search for the _______________ of the variables to

provide the majority of the power.

minority

78
New cards

We find the critical ________ by following a structured process for defining, measuring, and

analyzing all the cause-and-effect relationships

few

79
New cards

Define

VOC + VOB

80
New cards

Measure

VOP

81
New cards

Analyze

VOC + VOB vs. VOP

82
New cards

Six Sigma gives you the tools needed to quantify risk and know whether you're making an appropriately accurate analysis or have succumbed to the ravages of the all-too-common disease of analysis

paralysis

83
New cards

A program is a group of related_____ managed in a coordinated way to obtain benefits and control not available from managing them individually.

projects

84
New cards

A project is a _______endeavor undertaken to create a unique product, service, or result

temporary

85
New cards

1.) Core Team( Steering Committe)

  • Six Sigma is a top-down initiative

  • Begin with a team of executives who ensure the efficient and effective rollout of the Six Sigma Program:

  • Make the initiative visible

  • Set stretch goals

The core team is cross-functional

• Executives & Business Unit Leaders

• Functional Leaders

• Finance( provide $, measure ROI)

• Training ( provide $, measure ROI)

• Information Technology

• Human Resources( belts + payment levels)

• Communications

• Six Sigma Deployment Leader-→ reporting up to the rest of the core time

86
New cards

2.)Six Sigma Deployment Leader

The deployment leader ensures the effective alignment of corporate

strategic goals with business unit deployment plans.

• Accountable for Six Sigma results

• Drives the mission and vision (mission: why? , vision: what it will like when done)

• Removes barriers

• Internally publicizes Six Sigma

• Creates and maintains passion and commitment

• Briefs the core team (steering committee) on progress

87
New cards

3.) Project Champion

Project champions are responsible for disseminating and successfully

applying Six Sigma technical know-how.

• Identifies, selects, scopes, prioritizes, and assigns __projects__________

• Selects Black Belts, Green Belts, and Yellow Belts

• _Support__ the project through removal of barriers, securing resources, coaching, and

reviewing status

• Establishes a backlog of projects

• Briefs the deployment leader on progress

• Promotes best-practices and reuse across organizational boundaries

88
New cards

4.) Belts

Master Black Belt( most knowledge/ skills)

• Full-time

• Teaches and mentors ( coach)

Black Belt

• Full-time Job

• Leads complex projects

Green Belt( Part- time job)

• Part-time

• Leads simple projects

Yellow Belt( least knowledge/skills)

• Part-time

• Identifies measurement scales, defines critical process factors, collects

some data, etc.

89
New cards

Roles of Six Sigma

Core → deployment leader → project champion → deployment leader → core team


90
New cards

Responsbilties

initialize stage, deploy stage, implement, expand stage -→ sustain stage

91
New cards

Initialize Stage

Establish goals and install infrastructure …

• Launch planning

• Human resource guidelines

• Communications plan

• Financial guidelines( ROI)

• Project selection guidelines( goverance)

• Project tracking and reporting

• Management dashboards→ lead & lag metrics

• IT (information technology) support

92
New cards

Communication plan

message: who, what, why, when

medium: where, how

5 C’s of a message: clear, concise, creative, compelling, continuous (not space)

93
New cards

Deploy stage

assign staff

  • project champions

  • black belts

  • green belts

  • yellow belts

train/eqip

deploy the infrastructure of initialize stage

94
New cards

Implement Stage

  • DMAIC

  • Implement projects and improve performance, yielding finance results


95
New cards

Expand Stage

Expand (Roll Out) Six Sigma to new locations, lines of business, and domains of activity

  • managing for breakthrough

  • thinking for breakthrough

  • designing for breakthrough

  • processing for breakthrough


96
New cards

Managing for breakthrough

Entails all the plans, systems, and processing for leading improvement within an organization.

97
New cards

thinking for breakthrough

a set of guiding principles that fuels cultural change and gets many people speaking the same language of performance.

98
New cards

designing for breakthrough

encompasses the activities that focus on optimizing the design process prior to (before) manufacturing products, delivering services, or conducting transactions for customers.

99
New cards

processing for breakthrough

The realm of activity focused on optimizing the performance of exiting businesses and operational processes.

100
New cards

sustain stage

• The focus changes from a project orientation to a process-management approach.

• The culture is self-healing

• The Six Sigma project becomes a tool for addressing flare-up issues