1/60
Looks like no tags are added yet.

Hard-surfaced runway/landing area

Metal surface runway/landing area

Other than hard surface runways

Water runway

Under construction

Closed runway

Closed pavement

Helicopter landings area

Displaced threshold

Taxiway, apron, and stopways

Building

Building

Building

Buildings

Powerlines

Powerlines

Towers

Towers

Towers

Wind turbine

Tanks

Tanks

Tanks

Oil well

Smoke stack

Obstruction

Controlling obstruction

Trees

Populated places

Cuts

Fills

Cliffs and depressions

Ditch

Hill

VORTAC

VOR/DME

TACAN

VOR

NDB

NDB/DME

DME

Airport beacon

Airport beacon

Wind cone

Wind cone

Landing tee

Landing tee

Tetrahedron

Tetrahedron

Control tower

Digital tower

Control tower & digital tower

Runway centerline lighting

Approach lighting systems

Omnidirectional approach lighting system

Visual approach slope indicator with standard threshold clearance provided

Pulsating visual approach slope indicator (PVASI)

Visual approach slope indicator with a threshold crossing heigh to accommodate long bodied/jumbo aircraft

Tri-color visual approach slope indicator (TRCV)

Approach path alignment panel (APAP)

Precision approach path indicator (PAPI)